As it recently appears that Life Cycle Cost Analysis may be considered as new methodology for economic valuation of infrastructure many researches have been made to assess LCC(Life Cycle Cost) of each facility based on a reasonable methods. In general, LCC is composed of construction cost and expected maintenance repair cost. And especially, maintenance repair cost must be estimated to enhance the reliability through systematic and reasonable methods. However in Korea, because high speed railway steel bridges are recently constructed no direct statistical data are available for the account of the maintenance cost and then their maintenance characteristics are not linear yet. Therefore, the approach proposed in the paper utilizes a theoretical determination and degradation of the corrosion and fatigue of the bridges based on Rahgozar et al.(2006)'s model on fatigue notch factor considering into the corrosion to incorporate the corrosion effect into the fatigue strength reduction model. And then, the corresponding probability of failure is calculated in terms of the reliability index using S-N curve to formulate the fatigue limit state. Therefore, this paper proposes the minimum Life Cycle Cost through optimum maintenance plan analysis of high-speed railway steel bridges under construction. Finally, this paper reviews the proposed model in oder to confirm the applicability and feasibility by appling it to high speed railway steel bridges under construction
Kim, Sung-Un;Seo, Sang-Bo;Song, Seung-Mi;Jo, Chan-Hyo;Hwang, Jong-Gyu;Jo, Hyun-Jeong
Proceedings of the KSR Conference
/
2008.06a
/
pp.343-352
/
2008
Safety-critical systems related to the railway communications are currently undergoing changes. Mechanical and electro-mechanical devices are being replaced by programmable electronics that are often controlled remotely via communication networks. Therefore designers and operators now not only have to contend with component failures and user errors, but also with the possibility that malicious entities are seeking to disrupt the services provided by theirs systems. Recognizing the safety-critical nature of the types of communications required in rail control operations, the communications infrastructure will be required to meet a number of safety requirements such as system faults, user errors and the robustness in the presence of malicious attackers who are willing to take determined action to interfere in the correct operation of a system. This paper discusses the safety strategies employed in the railway communications and proposes a security mechanism for Korean railway communication system. We present the developed communication safety evaluation tool based on the proposed security mechanism and also evaluate its protecting capability against the threats of masquerading, eavesdropping, and unauthorized message manipulation.
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.12
/
pp.1796-1803
/
2015
Unlike commercial LTE network, LTE-R railway network is arranged along a railroad track and the base stations of the network (RUs) are also installed on the waysides. For urban railway systems that are composed of underground tunnels, the leakage coaxial cables are widely used due to the radio propagation characteristics in tunnels. In theory, the tunnel sections are interpreted as the waveguide with blank spaces and for this reason, the tunnel sections are expected to be better than open ground sections in terms of the radio propagation characteristics. In this paper, we analyze the radio propagation characteristics based on this theory by replacing the leakage coaxial cables in the network with Yagi antennas. The test has been carried out in the 2.2km tunnel in the Daebul test track of KORAIL with 2.6GHz LTE-R Network. The LTE-R applicability in urban railways has been tested through the analysis on the radio propagation characteristics with the unmanned train operation system in Daebul tunnel.
The power plant is a major infrastructure composed of essential machinery such as Turbine Generators (TG), Heat Recovery Steam Generators (HRSG), etc. Particularly, Combined Heat & Power Plants (CHP) are highly efficient power plants that simultaneously produce heat and electricity. Recently, cases have emerged where railway tunnels are being constructed beneath such power plants due to the underground development of urban rail transportation. Therefore, there is a pressing need to assess the impact of vibrations induced by blasting excavation during the construction of railway tunnels beneath the power plant, as well as the vibrations during railway operation, on the major machinery foundations and structures within the power plant. In this study, criteria for evaluating the vibration impact on key vibration-sensitive structures are summarized, and evaluation standards based on international criteria are established. Based on this, the study examines the vibration impact during the blasting excavation method of NATM tunnels beneath the operational power plant. Furthermore, subsequent railway operation, specifically focusing on the impact of train vibrations on Turbine foundations, Pump foundations, and District Heating pipelines using 3D dynamic numerical analysis. The results indicate that vibration values corresponding to up to 97.3% of the evaluation criteria are derived based on the numerical analysis. However, considering the significance of power plant-related structures, additional measures to reduce vibrations are proposed, including further test blasting, alteration of blasting patterns, reducing the charge per delay, or decreasing advance.
Recently, there have been various problems aroused on the domestic infrastructures as the domestic cities become old. Accordingly, the national concerns grow on the urban railway and the related structures, which brings the national interests are brought on the research on the maintenance and rehabilitation of the old infrastructures. The underground structure of urban railway are checked with the strain gages or fiber brag grating (FBG) sensors on the railway. However, these methods are known to have resolution limitations on the investigations of the specified abnormal section. Therefore, the applicability of the Brillouin Optical Correlation Domain Analysis (BOCDA) based distributed fiber optic sensor system on the railway was evaluated in this study. The constructed BOCDA fiber optic sensor system shows high resolution of 10, 20, 50, 100 cm and capability of continuous monitoring on overall or specified section within 2 km range. The applicability evaluation was performed on the 250 m distribution of fiber optic sensors abandoned railway for continuous monitoring. The applicability of the system on the specified area was evaluated with wheel load testing. As a result, data loss tends to increase with the reduction of spatial resolution from 1.0 m to 0.1 m. Even though the measuring speed is reduced with lower spatial resolution, data accuracy increases on the location and deformation. The system can be applicable to various structures if the proper distribution method is invented later.
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.12
/
pp.645-652
/
2018
Recently, as South Korea has joined the OSJD, the rules of the OSJD need to be applied to South Korea. Therefore, the railways are connected to the continent railway in terms of software, but the railway systems in neighboring countries have been developed and operated for a long time, and are quite different with some restrictions in terms of hardware. Therefore, this study analyzed the current railway systems of neighboring countries' based on the TSI used in Europe for technical interoperability. A real operation with the operation models within the specific route was assumed and vector functions for the Infrastructure vector & Rolling stock vector were produced. The IOP value was calculated by working out the interfacing matrix value between the infrastructure vector and rolling stock vector. As a result of calculating the IOP in a specific route, which is from Busan South Korea to Vladivostok with the diesel locomotive hauling freight cars, the value was only 22%, which is fairly low in terms of the interoperability. In other words, there are 77.8% restricting items preventing their interoperability. Such restricted causes should be improved to increase the technical interoperability in the long term. Moreover, and when railway systems are constructed and manufactured, it is important to keep IOP 100% to increase the operating efficiency in continental railways.
This study of bimodal integration management system in conjunction with the tram and the tram cars bimodal integrated management system that occupies a part of the system to perform its role as a bimodal tram vehicle configuration, a device for the vehicle's infrastructure ryureul development and it is aimed to build on the vehicle. Bimodal tram vehicle infrastructure systems, internal and external information of the larger vehicles, and vehicles used to collect information for its own part and the integrated operations management center, or providing partial information from the station and collect/provide for the transfer of information to the communication part consists In this study, the core of these devices, the configuration of the vehicle infrastructure systems for the overall management and control of vehicles operating a computer's central processing device, vehicle infrastructure systems that make it manages and stores all jangchiryu Integrated Operations Management Center is reporting. In addition, seamless integration with operational management center for interactive communication in a vehicle mounted communications devices to maintain the best condition to manage. Current general traffic management system in a similar terminal device being used, but bimodal tram vehicles operating the computer of the vehicle operates the infrastructure to configure the devices around the one to configure the system in terms of step enhanced the active type, the operating terminal unit of inter active type. In this study, considering the future alignment of the accounting fee system, the expansion of the system reliability and stability around the activities that are underway.
In the case of a low density branch line, these areas are operating at a loss. So much money is used for infrastructure maintenance cost. To solve the problem, our institute have a project to develop the Information & Communication Technology based train operation system. In a similar research in the Europe, The UK's Transport Research Laboratory experienced analysis of operational issue for developing ERTMS from Level II to Level III. In this paper, we study about railway operational issues before development of ICT based train operation system. An analysis target of operational issues are railway business process & data, drivability and moving or virtual block system.
Kim, Ki-Suk;Jung, Ho-Sung;Park, Young;Park, Chan-Bae;Park, Chul-Min;Jang, Gil-Soo
Proceedings of the KIEE Conference
/
2011.07a
/
pp.2171-2172
/
2011
Recently, while interests on supply of electric vehicles have increased there still are insufficient charging facilities. As a solution to this matter, using electric power grids that constantly retain about 30~50[%] residual power is being considered. Therefore proposed in this paper railway, is a method to establish a charging infrastructure to utilize railway DC power grids. In addition we designed a high-speed DC charging system, and simulated improvements of the charging structure's charging efficiency according to remaining capacity of batteries.
Park Chan-Ik;Lee Jae-Won;Ryu Sung-Ryul;Kwon Yong-Jang;Yoo Jae-kyun
Proceedings of the KSR Conference
/
2005.05a
/
pp.985-990
/
2005
The success of road transportation, in dominating the surface movement of freight, is now threatened by increased traffic congestion, falling average motorway speed and rising in logistics costs, oil price. Due to the necessity for an effective transport system, we need to improve domestic transport infrastructure to reduce logistics cost by shifting to rail system. To analysis the demand characteristics in advance against these hypothetical circumstances, Stated Preference, which is called SP, approaches have been adopted to analysis the shipper's mode choice behaviors as RP(Revealed Preference) approaches are not appropriate. The results also indicate that the most effective policy to divert the freight volume from road to railway is to reduce freight rates for the railway with improved reliability.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.