In the case of the existing train control system, the driver monitors the condition of the vehicle through a composite controller device that displays various information on a screen in the vehicle. However, when problems arise such as car trouble, it is difficult for the drivers to take action immediately. In addition, maintenance personnel have to manually save data one by one after storing the vehicle to analyze control information of the main devices such as the brake controller and auxiliary power. To improve these points, a system that sends and receives all information in real time should be established by installing a sensor communication network and a surveillance system. This study attempts to improve the safety and maintenance of rail vehicles by suggesting a standardized method for train control and surveillance system.
Park, Eun-Churn;Kang, Hyung-Goo;Choi, Jun-Sung;Kim, Eun-Sung;Kim, Man-Cheol
Proceedings of the KSR Conference
/
2011.10a
/
pp.3226-3236
/
2011
In this paper, with the background features on which measuring the transverse left-right and up -down vibration of wheel, bogie and body by wireless measurement system, performance evaluation systems which can assess the running behavior of high speed trains based on UIC code 518-OR and evaluate the ride comfort of them based on ISO code 2631 and UIC code 513 were developed. The characteristics of dynamic vibration are generally analyzed by an acceleration of a car body of high speed train and the acceleration can be applied to evaluation of running safety. In this paper, also matching system of distance from tachometer and vibration from accelerometer was programmed in development software, and the SD card embedded system which prevent to loss of data in wireless measurement was mounted on this system. Finally the software perform to analysis with filtering and statistical post-process in the unit sections and zones and focus on developing the capability monitoring in the main control center. For the verification of this system, the running behavior and safety factor were analyzed based on field measured data of the Cheonjun-gunnum-sun turn out point in the new KTX railway.
The Public Address and Passenger Information System of Rolling Stock should be able to perform automatic announcements in connection with TCMS(Train Control and Monitoring System), common announcements and emergency announcements for safe operation and the passengers. CCTV(Closed Circuit Television) System also should be able to watch passenger compartment for safety. Those equipments are very important thing for train service and safety. but the installation of equipment is restricted by space, weight, modulation. therefore, Passenger Information Intergrated System(PIIS) is required to consider economical efficiency, technical trend, expansion and space insufficiency. and system based on IP network has to be considered as new PIIS. so PIIS could meet economical efficiency and expansion. and it could go further and share network with TCMS and others.
The Seoul Metropolitan Rapid Transit Corporation(SMRT) is studying the New Train Control System based on Wireless Communication(CBTC System : Communication Based Train Control System) to overcome the limitations of the existing system and to deal with the switch to the new system. The SMRT's New Train Control System Based on three main elements(train position detecting, radio communication and train control) is being developed in 3 stages. Currently, the development of the train position detecting element with the RFID system and the train position detecting device and the radio communication element with RTIS and DSRC had been developed and equipped on 3 stations(Songpa~Garak Market~Munjeong, 7.3km) of Subway Line 8 in the pilot. Such a basic infrastructure of the SMRT's New Train Control System is having an efficiency test by using the real-time Train Monitoring System and Currently, the third element, the train control(ATP/ATO/ATS/Interlocking) for the study is in progress. Also, the developed system is expected to validate the performance and safety in the next three stage. This paper shows about major developments of the SMRT's New Train Control System and our future plans.
Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
Geomechanics and Engineering
/
v.32
no.1
/
pp.111-123
/
2023
The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.
Kim, Do-Hoon;Seo, Sang-Jun;Han, Jeong-Soo;Kim, Chul-Ho
Proceedings of the KSR Conference
/
2008.06a
/
pp.353-362
/
2008
Operation data and fault data are recorded at the TCMS(Train Control and Monitoring System) of train are very important record for repairs and inspection of train. there are two ways to transfer the data today. one is using memory card and the other is using wireless communications. This paper is proposed about TCMS wireless depot analytical equipment that transfers data recorded in train to depot equipment via wireless method. The TCMS wireless depot equipment configuration is an AP(Access Point) and a central server PC at depot equipment. This method has the advantage of decrease of personnel expenses, collection time and convenience of staffs. This paper is verified about the utility of use, efficient establishment position of an AP at depot, the safety of data receiving, the exactitude of data and the shortening of transmission time. and this equipment is now operating at shin-jeong depot of SeoulMetro.
Park Young Kon;Lee Jin Wook;Yoon Hee Taek;Kim Seon Jong
Proceedings of the KSR Conference
/
2005.05a
/
pp.530-535
/
2005
To monitor the flood level under heavy rainfall and the scour at railroad bridge, the system, which can effectively collect, store and transmit the data, is developed and applied to the field. The results in this study are as follows. 1) Monitoring for water level and scour depth is well done in view of the recording velocity and the accuracy of data which are measured. 2) This system is based on the web, internet and it is able to collect the realtime data and to analyze the risk. 3) When water level excesses the limit of danger level of a river on which railroad bridge is located, or when scour depth and angle of inclination of pier is increased, the scenario for early warning signal which sends to managers at central traffic control and drivers of trains is automatically made. It is judged that this system secures the safety of railroad and protects lives of train passengers as the warning signal sends to running train in advance at risky situation of railroad bridge under heavy rainfall.
Choi, Jae Sik;Kim, Hie Sik;Park, Ju Hun;Kim, Bun Gon
Journal of the Korean Society for Railway
/
v.19
no.1
/
pp.38-45
/
2016
The power transformation system of High Speed rolling stocks like KTX-Sancheon has shown excellent control capacities in the areas of riding comfortability, switching efficiency, safety and energy consumption due to technical developments in power-electronics, high speed & large scale integrated semiconductors and microprocessors. However, harmonics from IGBT, a high speed switching device used in the Convertor & Invertor equipment of rolling stocks have given rise to various problems in transformer substations, signaling systems, data transmission systems and facility monitoring systems. Especially, TI21 non-insulated track circuits have malfunctioned due to the influence of returning current harmonics which were generated at around of integer times of the number of power transformation equipment in the frequency domain. This paper, measures and analyzes various schemes to analyze the traveling path of the returning current harmonics generated due to the relationship between the rolling stocks and track circuits on site. Ultimately, theseschemes will be used to design high speed rolling stocks, AF track circuits and a common grounding network.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.