• Title/Summary/Keyword: Railway Project

Search Result 574, Processing Time 0.026 seconds

Application of Risk Analysis for Economic Evaluation of Railroad Investments (위험도 분석을 이용한 철도투자사업 경제성평가 적용방안)

  • Lee, Ho;Suh, Sun-Duck
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.44-51
    • /
    • 2001
  • To account for uncertainties involved in an economic analysis of project, sensitivity analysis are usually being done in Korea. Though useful for policy analysis, but it larks explicit consideration of probability of occurring certain events considered in the sensitivity analysis. Risk analysis otherwise can explicitly account for the probability of certain event which has dire impact on project viability, such as cost, discount rate, and size of benefit. This paper reports experience of applying risk analysis method for economic evaluation of railroad investment. Probability distribution of event has paramount impact on the risk analysis results, while not many prior researches dealt with these issues. Probability distribution of rolling stock cost and operating cost, in addition to those cost variables, are developed considering railway demand in this study. Case study results are reported. Issues in applying risk analysis are reported in addition to further research direction.

  • PDF

An Way of Training Railroad Civil Engineers in Relation to NURI Project (지방대학혁신역량 강화사업(NURI)과 연계한 철도시설 토목인력 양성 방안)

  • Hung Chan-Mook;Oa Sung-Wok
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1514-1518
    • /
    • 2004
  • Korea became the 5th country by opening the Kyungbu-Highspeed Railway in April of 2004, which has contributed to technical innovations and motivated to increase SOC investment for the Railroad facilities. This increase of Railroad facilities will need the many railroad civil engineers who are in charge of construction and maintenance. Moreover, we need more qualitative engineers to catch up with the speed of technical renovation and to play an important role in exporting our railroad technique to outside country such as China, and Russia. In this paper, a new alternative of training railroad civil engineers will be investigated in relation to NURI Project, which is sponsored by Ministy of Education.

  • PDF

Design and Construction of Integrated Signalling System for Next-generation High-Speed Train (한국형 고속전철용 통합 신호시스템의 설계 및 구축)

  • 황종규;이종우;조용기;류호중
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.467-472
    • /
    • 2002
  • The railway signal ing system consists of several vital computerized equipments. Now the project for development of signal ing system for the next-general ion high-speed train is progressed according to the consortium. The developing signal ing system by this project, kTCS(Korean Train Control System), is composed of kTCS-CTC, kTCS-IXL, kTCS-ATC and etc. The KTCS signaling has to be operated as a integrated system by interface between each signaling. To achieve these, communicat ion protocols between each signal ing have to be designed and message codes are defined. In this paper the configuration of integrated kTCS system and designed communication protocol is presented.

  • PDF

Comparative Study on Benefit Evaluation of Urban Rail Construction Project : Korea vs Japan (도시철도 건설사업의 편익계측에 관한 한일 비교연구)

  • 최창식;김경철;김용일
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.17-26
    • /
    • 1999
  • This paper studies on the benefit evaluation of urban railway construction project. We compares Korean Method with Japanese in calculating the generalized cost(GC) of a trip. In Japan, the disadvantage of transferring to another mode or line is included to calculate GC of trip. And environmental effects are contained directly as rail construction benefit. But in Korea, inconvenience of transferring facilities like stairways and passageway for riding a subway is not accounted to analyse benefit. As a result, there is a little investigate to improve and overcoming the inconvenience facilities of transfer, access, and egress. So, we suggest the containing the disadvantage measure of transferring facilities when subway riderships are forecasted. That will be reduced tile capital size of subway.

  • PDF

Proposal for Specification of Counter-measurement in Frost-Heave System in Railway Underpass Box Structures in North Korea Considering Climate Condition (북한지역 기후조건을 고려한 철도횡단구조물의 동상방지방안 제시)

  • Kim, Mun-Su;Cho, Kook-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.1
    • /
    • pp.99-110
    • /
    • 2017
  • As a part of several Eurasian initiatives, the Korean government is trying to reconnect railways through North Korea to the Asian continent. If South Korea could build a network using railway, it would be a chance to develop a robust economic environment and to motivate economic growth. In the railway reconnection project between North and South Korea, the most important part of the railway roadbed sector is repair or improvement, and then construction of a new line through North Korea. There are not many big differences in the geological conditions; however, climate condition varies greatly during winter. The most significant condition in the safety of railway operation is frost-heaving. However, since South Korea has a relatively mild climate condition compared with North Korea, design and construction specifications under severe weather conditions in winter have not been prepared. This study proposes a plan for revising the railway design standard for underpass structures through an analysis of international standards, leading to site construction to prevent frost-heave.

The Feasibility Study of the Scenario of 400kph Maximum Speed Test in HEMU (High-speed Electric Multiple Unit) System (400km/h급 전차선로 시스템의 시범적용 구간선정 연구)

  • Ryoo, Hyang-Bok;Jang, Sa-Sool;Park, Jae-Woong;Lee, Hae-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.761-767
    • /
    • 2011
  • Since the "Low Carbon, Green Growth" as a social requirements is attracted public attention, the policies and investments of the railway which have been less estimated than road is re-considered. Since the starting the commercial service (2004. April), the KTX have been operated successfully while transport passengers over 100million for years. And also the project for development of KHST (Korea High Speed Train ; G7) had been accomplished with a good result, the first trainset of KTX-II which base on G7 project was manufactured and testing now. On the other hand, the world's technology of the high speed train is more faster, and changing to a distributed traction system. To catch up the world's leading technology, the HEMU(High-speed Electric Multiple Unit) project will secure new technology and aims to promote the technology of domestic high-speed train. The authors indicates the result of detail review such as a curve, slope of the track and electrical dead section of the catenary to test at 400kph and also the performance simulation of the developed rolling stock in this paper. As the result, the authors devise the test scenario to perform a maximum speed test (stability at max. speed, acceleration & deceleration etc) with the restricted conditions such as track length, track available time etc by considering above result.

  • PDF

The Feasibility study of the scenario for 400kph maximum speed test in HEMU (High-speed Electric Multiple Unit) System (분산형 고속철도 시스템의 400kph 최고속도 시험을 위한 시운전 시나리오 고찰)

  • Kang, B.M.;Jeong, S.H.;An, H.K.;Cho, B.C.;Moon, J.S.
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.429-433
    • /
    • 2009
  • Since the "Low Carbon, Green Growth" as a social requirements is attracted public attention, the policies and investments of the railway which have been less estimated than road is re-considered. Since the starting the commercial service (2004. April), the KTX have been operated successfully while transport passengers over 100million for years. And also the project for development of KHST (Korea High Speed Train ; G7) had been accomplished with a good result, the first trainset of KTX-II which base on G7 project was manufactured and testing now. On the other hand, the world's technology of the high speed train is more faster, and changing to a distributed traction system. To catch up the world's leading technology, the HEMU(High-speed Electric Multiple Unit) project will secure new technology and aims to promote the technology of domestic high-speed train. The authors indicates the result of detail review such as a curve, slope of the track and electrical dead section of the catenary to test at 400kph and also the performance simulation of the developed rolling stock in this paper. As the result, the authors devise the test scenario to perform a maximum speed test (stability at max. speed, acceleration & deceleration etc) with the restricted conditions such as track length, track available time etc by considering above result.

  • PDF

A Study on Technology Trend over-accelerated train signaling system (철도 고속화에 따른 신호시스템 동향 연구)

  • Kim, You-Ho;Lee, Hoon-Koo;Kim, Jin-Chuol;Lee, Soo-Hwan;Eum, Ki-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.239-244
    • /
    • 2011
  • Technical advancement in the field of world-class railway has brought the development of passenger safety, efficient operation and fast passenger service. The study of the railway speed-up has been progressed for a long time. As for the speed-up of trunkline railways, its design work has already promoted in some railway tacks and some track sections has already been under construction. In such a perspective we should review if the domestic signaling system is the optimal system and figure out the trend of signaling system for the speed-up that is recently applied over the world. In this way learning about justification and futurition, we should secure the national competitiveness in the long term and review the system available to international exports. Further, it is important to apply the result to the research project currently being pursued. In addition, predicting the recent international trends, we should show the direction of the future-oriented and economic signaling system.

  • PDF

Study on the plan of the evacuation, guide for passenger under emergency (비상시 승객대피 유도 계회에 대한 연구)

  • Choi Se-Jung;Kim Han-Sung
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.241-246
    • /
    • 2004
  • After DAEGUE disaster, there are a lot of studying is focus on the safety of fire in korea. and Now there are taking place the modification of Urban Railway vehicle over the country. It is usually about the ability of fire resistance. But most of victims of this fire disaste in train on underground railway platform are because they could not leave the train in time and were trapped by hot gases. This study will investigate the plan of guide and evacuation plan of DAEGUE modification project and It will be compared with Madrid 8000 series metro's. and looking for reasonable and practical solution for Urban railway vehicle in Korea.

  • PDF