These days, the damage of noise has increased seriously by rapid change of life style because of the centralization of urban population, and the rapid increase of traffic. The Ministry of Environment has emphasis on the systematic management about the noise of daily life and the close connection of daily noise management policy with relevant ministries, and put into practice "the master plan of lessening the noise of daily life" from year 2006. This study tried to find out the reduction methods and the effective management of railway noise in the action plan of railway part of "the master plan of lessening the noise of daily life". According to this study, railway noise can be reduced greatly by taking action of railway detail plans. The cause of railway noise varies by rolling stock, track and more, so the reduction methods of railway noise can be studied specially, scientifically and constantly in every field.
The important source of noise from railways is rolling noise caused by wheel and rail vibrations induced by acoustic roughness at the wheel-rail contact. The main contributors for rolling noise are the sleepers, rail and wheels. In order to analyze and predict rolling noise, it is necessary to understand the vibrating behaviors of railway tracks, as well as the wheels. In the present paper, theoretical modelings of the railway track are reviewed in terms of the rolling noise, and they are applied for the three representative types of domestic railway tracks operated: the conventional ballasted track, KTX ballasted track and KTX concrete track. The characteristics of waves propagating along rails were investigated and compared between the tracks. The tracks were modeled as discretely supported Timoshenko beams and compared in terms of the averaged squared amplitude of velocity which is directly related to the sound radiation from the rails.
With rapidly industrial development, a railway has become of a main traffic means. But, the railway noise has caused much annoyance for the residents living nearby railway tracks. Therefore, in our country, for established of quite dwelling environment. execute regulation standard of railway noise from January 1. 2000. Efficiency soundproofing measures, however, are very difficult because of the lack of basic data and insufficiency of the existing research. In this point. this study attempts to survey the vertical sound pressure level of railway noise in by existence of noise harrier And this study intends to get the basic data for establishment of a efficient noise barrier about railway noise.
A light railway operationis an effective means to solve a traffic problem of the city however, noise and vibration is pollution happened. This paper studied noise and vibration pollution of a light railway operation in order to let a decrease. The study range was only track condition and civil engineering structure condition. The way how we decrease noise and vibration in a protection vibration track, ballasted track, non-ballasted track, floating track trends was devoted is long rail laying, low vibration track lying. It was the most economic that the examination results track section a complement, and it was proved that a certain way.
Constructing urban public housing built adjacent railway site has the noise and vibration problem coming from operation of trains. Thus, anti-vibration plans utilizing anti-vibration pads must be established to minimize the impact of train noise and vibration from the tunnels on the residents of the public housing. Under various difficulties and expectation from the citizens, many efforts were taken to satisfy the amenity requirements on noise and vibration for the residential area. As a results, it can be recognized that amenity standards can be satisfied. But great caution is required to prepare ourselves for various situations that might occur during construction, especially considering that the relevant railroads are still under operation.
These Days a lot of Noise Complaints in vicinity of Railway has been more increase than before. Almost 1/3 Residences who lives in Railway side are Exposure to Noise Pollution. Since the Apartment Buildings around Railway are getting more higher, so those of the Noise Barrier are not best solution anymore. We are going to make a New Plane with the state of the art technology for Railway Noise Abatement Control. Our Goal are focus on a development of Light Weight Noise Tunnel designed by new absorption mat'l and tunnel Stucture on the Overbridge and Viaduct of existing Railway. New Noise Tunnel will be reducing their weight more than 30% against Road Traffic One and also 10dB(A) Noise Reduction against Noise Barrier.
This paper is focused on a relationship between the noise and vibration of a wheelset and the railway irregularity of a high speed railway using a time-varying frequency transform for a preliminary research of the railway condition monitoring by an in-service high-speed railway vehicle. Generally, the monitoring has been performed by a special railway inspection vehicle or industrial engineers for railway maintenance. However, they have been limited at night due to the in-service high-speed railway vehicles, and too slow to monitor all of the section. To solve this problem, the monitoring should be performed by an in-service high-speed railway vehicle. For the research, the noise and vibration of a wheelset are utilized, because they are closely related to the railway condition. They are measured by using some microphones and accelerometers, and stored in an on-board data acquisition system. The signals are post-processed by a time-varying frequency analysis and compared with the result of a railway geometry and profile measurement system. From the comparison, it is able to observe the relationship between the noise and vibration of a wheelset and the irregularity of a high-speed railway. Also, some distinct frequency components are observed, which are not observed in the railway geometry and profile.
The source of wayside noise for the train are the aerodynamic noise, wheel/rail noise, and power unit noise. The major source of railway noise is the wheel/rail noise caused by the interaction between the wheels and rails. The Structure borne noise is mainly a low frequency problem. The train noise and vibration nearby the elevated railway make one specific issue. In this paper, the train noise and structure borne noise by train are measured. From the results, we investigated the effect on the sound absorption tunnel for elevated railway.
Railway noise Is one of the main causes of environmental impact. Whenever a new railway line is planned or a housing project near an existing railway is proposed, an estimate of the relevant noise levels is usually required. For this, it is necessary to quantify those parameters that affect the railway noise. Therefore we investigated the noise level which 107 high speed trains generated passing through the block of test railway track between Chunan and Chungwon. This paper shows the status and characteristics of the high speed rallway noise and an accurate prediction of the high speed railway noise.
Recently in Korea, noise is one of the most important social issues because the living standard becomes more higher. Railway noise is also annoying one in our society, although railway has very positive role in our country. The major measures for mitigation of railway noise in Korea are rail welding and installation of noise barrier on the noisy area. But these measures have its own limit for the calm and comfortable living environment. In Europe the railway noise problem has been treated more systematically and aggressively, there has been emission noise standard for Trans-European rail network. In this paper, the trend of noise standard for railway vehicles will be reported and the check point for our country will be discussed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.