• Title/Summary/Keyword: Railway Intersection

Search Result 17, Processing Time 0.026 seconds

The effects of Design Initial Condition on Renewal of Railway Existing Curves (철도 평면선형 개량시 설계초기조건이 미치는 영향)

  • Um, Ju-Hwan;Choi, Il-Yoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.4
    • /
    • pp.2906-2910
    • /
    • 2015
  • The alignment modifications after completion of railway construction entail a lot of efforts and time as well as high additional costs. In the process of renewal of the existing railway alignment to offer higher-speed services, the effect of initial design parameters(e.g., intersection angle) on determination of allowable degree of improvement of horizontal curves under consideration of economic efficiency is investigated in this study. From the analysis results, in the case that there are obstacles at the tangent line, it was found that the larger angle of intersection has a significant effect on the permissible zone. In addition, as the intersection angle is increased, the permissible values of maximum curve radius and the length of transition curve becomes smaller and longer, respectively. It is expected that this study can contribute to the efficient and accurate prediction of the permissible zone according to the locations of obstacles and the size of intersection angle as well as improvement in the railway alignment without any additional costs.

Plan and Design of Fan-Type Arch Railway Bridge (경사행거아치철도교의 계획과 설계)

  • 이충표;김종오;이훈희;이강진
    • Proceedings of the KSR Conference
    • /
    • 2002.10a
    • /
    • pp.672-677
    • /
    • 2002
  • Railway bridge type has been mainly selected by a intersection of roads and rivers, and economy. Now a days, it is required that the bridge type is considered a harmony with circumstances, a beauty and an expression of symbol of regions because of the enlargement of bridge structures and the advance of people's consciousness level. So it is adopted arch bridge with fan type hanger for a outer beautiful sight and a symbol of development of regions as 80m intersection bridge of railway and former national road at pal hung bridge in jolla line lot 1. It is performed that an examination, a consultation, a design of member sections and a detail analysis of joint parts according to the basic design. It is also performed a dynamic analysis with design loads and train loads reflection on railway bridge characteristics and examined a safety and a propriety of design compare with a fatigue design and design rules.

  • PDF

Diagnosis of Local Traffic Controller for Effective Operation of Trams at Signalized Intersection (효율적인 트램 평면교차로 운영을 위한 교통신호제어기 기능 진단)

  • Kim, Jin-Tae
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.1
    • /
    • pp.25-32
    • /
    • 2015
  • It has been subject to question whether a conventional traffic signal controller can support efficient operation at grade intersections in which vehicles and tram lines cross concurrently. This study proposes a list of functional requirements for a traffic signal controller to support effective operation of trams at such an intersection. The considered details includes the combinations of geometric conditions at which vehicle, bus, and tram lines are aligned, the types of exclusive tram signals, and the combinations of various signal phases, including exclusive tram phases, which are currently undefined in the nation. The results suggest that the controller should be capable of dealing with the NEMA standard overlap relays and a quadruple-ring phase representation scheme.

An intersection technologies of ITS & CBTC in Urban Transit System (지능형교통시스템(ITS)과 도시철도 CBTC와의 상호연계기술 방안연구)

  • Han, Seong-Ho;Lee, Su-Gil;Kim, Won-Kyong;Lee, Kwan-Sub
    • Proceedings of the KIEE Conference
    • /
    • 2001.04a
    • /
    • pp.390-392
    • /
    • 2001
  • This paper presents an intersection of technologies of ITS (intelligent transport systems) and CBTC(communication based train control) in urban transit system. ITS is based on Information and communication technologies. And also these techniques are fundamental for railway system. ITS has some technologies useful in railways such as traveler information service, public transportation information service, and advanced vehicle control Systems. Therefore, both systems need to technological cooperation. In this paper, we proposed useful an cooperation method for both systems.

  • PDF

The Realtime Railway Data Control System to process Stream Data in Multi Sensor Environments (멀티센서환경에서 스트림데이터를 처리하는 실시간 철도데이터운영시스템 개발)

  • Park, Hyeri;Jung, Subin;Oh, Ryumduck
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2022.07a
    • /
    • pp.289-292
    • /
    • 2022
  • 본 논문에서는 실제 철도 건널목(교차로)에서 발생하는 소음 및 진동, 차량 및 보행자 사고와 같은 위험 요소로부터 발생하는 위험 상황들을 분류하고, 철도 건널목(교차로) 운행 상황을 구현한 모형 철도 주변에 센서를 부착하여 철도 건널목에서 발생하는 위험 요소들을 아두이노 센서로 감지해 데이터를 수집한다. 또한 수집된 데이터들을 활용하여 사용자의 상황에 맞는 철도데이터 운영시스템을 제안한다.

  • PDF

The impact of EPB pressure on surface settlement and face displacement in intersection of triple tunnels at Mashhad metro

  • Eskandari, Fatemeh;Goharrizi, Kamran Goshtasbi;Hooti, Amir
    • Geomechanics and Engineering
    • /
    • v.15 no.2
    • /
    • pp.769-774
    • /
    • 2018
  • The growth of cities requires the construction of new tunnels close to the existing ones. Prediction and control of ground movement around the tunnel are important especially in urban area. The ground respond due to EPB (Earth Pressure Balance) pressure are investigated using the finite element method by ABAQUS in intersection of the triplet tunnels (Line 2, 3 and 4) of Mashhad Urban Railway in Iran. Special attention is paid to the effect of EPB pressure on the tunnel face displacement. The results of the analysis show that in EPB tunneling, surface settlement and face displacement is related to EPB pressure. Moreover, it is found that tunnel construction sequence is a great effect in face displacement value. For this study, this value in Line 4 where is excavated after line 3, is smaller than that line. In addition, the trend of the displacement curves are changed with the depth for all lines where is located in above and below, close to and above the centerline tunnel face for Line 2, 3 and 4, respectively. It is concluded that: (i) the surface settlement decreases with increasing EPB pressure on the tunnel face; (ii) at a constant EPB pressure, the tunnel face displacement values increase with depth. In addition, this is depended on the tunneling sequence; (iii) the trend of the displacement curves change with the depth.

Analysis on Intersection Traffic Signal Locations Change and Characteristics of Dilemma Zone (교차로 신호기 위치 조정과 딜레마존 특성 분석)

  • Lim, Sam Jin;Lee, Young-Ihn;Kim, Kyung Hee
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.1
    • /
    • pp.3-13
    • /
    • 2013
  • This paper reviews the characteristics of dilemma zone by analysing the influence exerted by actual location of intersection traffic signal on behaviour of drivers approaching signalized intersection in urban area. The analysis of approach speed was based upon a 'before and after' comparison, measured at three sites where the locations of traffic signals were changed. The study demonstrated that, when traffic signal changed to yellow, the scales of dilemma zone were narrowed in case of stopping cars by moving up the starting point of the dilemma zone due to lowered spot speed. On the other hand, in case of passing cars, the end points of dilemma zone were moved further out to the rear due to increased spot speed. Therefore, changing traffic signal locations could make an impact to increase intersection safety through reducing the scales of dilemma zone. This study also found that, in cases involving vehicles with similar approach speeds, spot speeds could be differentiated following the change of signal locations due to the fact that there can be greater differences in both braking point and deceleration rate. Thus, when considering the appropriate measuring of dilemma zone, 'spot speed' rather than 'approach speed' appeared to be more appropriate criterion.

Study for the Improvement of Fatigue Crack on Intersection of Longitudinal- Transversal Rib in Orthotropic Steel Deck Bridge (강바닥판교의 종리브-횡리브 교차연결부의 피로균열 개선방안 연구)

  • Kong, Byung-Seung;Yun, Seong-Wun
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1084-1089
    • /
    • 2004
  • Recently, Orthotropic steel deck bridges, which have long span decks, have been regarded as one of economical as well as durable bridge types. However, Orthotropic steel deck bridge is used by a lot of welding, which may cause welding defect and deformation of connections. This kind of system happens some damages by the fatigue cracks of welding. The cross-connection of longitudinal rib and transversal rib is one of the weakest point because of the fatigue. The secondary stresses which are from the out-plane deformation of transversal rib and the torsion of longitudinal rib make the topical stress concentration phenomenon. But, it is principle that a Bulkhead Plate is not established in the domestic design standard. Therefore, it is estimated that a study for the installing of Bulkhead Plate is needed. This study with considering these circumstances proves efficiency of Bulkhead Plate and will be presented optimal design details through finite element analysis according to change the geometrical system of Bulkhead Plate and the cross-connection area of longitudinal and transversal rib

  • PDF

A Study On The Construction Methods In PSC Rail Beams (PSC 궤도빔의 가설공법에 대한 검토)

  • Ahn, Yong-Mo
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1293-1299
    • /
    • 2010
  • Daegu urban railroad line 3 is introduced with straddle-type monorail system within the country at the first time. This system is long line with 24km in total length which has not the results of construction in Korea. The rail beam of monorail bridge to be constructed/ installed in the city is adopted on the basis of the PSC rail beam. It is required to apply the steel rail beam at rapid/ curved line parts or location to be required the long span bridge as passing river and intersection. The composition of span bridge is various and the height of bridge is change with each section and exist the different curve radius due to all section is passes in the city. The rail beam shall be considered the ground conditions and then consider the construction methods. It is analyzed to construction period of PSC rail beam to be linked with period of infrastructure construction and construction of steel rail beam, structure construction of station etc. It is compared to crane construction methods and launching girder as alternative construction methods and propose to upper construction methods which is superior in economic and construction.

  • PDF

The Plan & Design for Through Plate Girder Bridge of Variable Section (변단면 하로판형교의 계획 및 설계)

  • Min, Young-Taek;Kim, Sung-Yeol;Ko, Seung-Young;Kim, Young-Sang
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.530-537
    • /
    • 2006
  • Recently, the railroad route plan is trying to minimize the damage of the local resident which is caused by railroad construction. For this reason, reducing the banking height of soil roadbed, lowering the bridge girder height of a solid intersection and a part of cross river, the through bridge type which can achieve a required span length must apply. The representative through bridges of railroad are arch bridges, truss bridges and plate girder bridges, the through plate girder bridge of variable section can apply that the span length of these bridges is about $30{\sim}50m$, namely, middle span length bridge types, and that can satisfy structural capacity and beauty of railroad at the same time. This paper introduces plan and design process of the Su-eo cheon bridge applied by a through plate girder bridge type of the Jinju-Gwangyang double track 6th construction ordered at Korea Rail network Authority in 2005.

  • PDF