• Title/Summary/Keyword: Railroad-tunnel

Search Result 233, Processing Time 0.024 seconds

Development of Visual Confirmation Device for Anchor Tensile Force (앵커 긴장력 상시확인을 위한 육안확인장치 개발)

  • Yoon, Hwan Hee;Lee, Yong Joo;Oh, Dong Wook;Kim, Dong Hyun;Jung, Hyuk Sang
    • Tunnel and Underground Space
    • /
    • v.28 no.5
    • /
    • pp.493-511
    • /
    • 2018
  • This paper deals with visual confirmation device for tensile force verification in order to cope with tensile force loss of ground anchor. Ground anchors are constructed to ensure the stability of social infrastructure facilities, but continuous loss of tensile force is seriously concerned about safety of the facilities. This requires the maintenance of the anchors, but the current measuring of residual tensile force is done by sampling, taking into account economic aspects, which limits precision. In this paper, conducted a conceptual design, tensile experiment, and field test for the purpose of developing an anchor tensile force visual device to check the tensile force of the anchors.

Numerical Evaluation of Settlement Reducing Effect by Partial Reinforcement of Rock Fill (수치해석을 통한 암성토 부분보강의 침하억제 효과 평가)

  • Lee, Su-Hyung;Choi, Yeong-Tae;Han, Jin-Gyu ;Gu, Kyo-Young
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.11
    • /
    • pp.23-31
    • /
    • 2023
  • The escalating settlements observed in concrete slab tracks pose a significant challenge in Korea, raising concerns about their adverse impact on the safe operation of high-speed railways and the substantial costs involved in restoration. A primary contributor to these settlements is identified as the utilization of rock materials sourced from tunnel construction, incorporated into the lower subgrade without the requisite soil mixing to achieve an appropriate particle size distribution. This study employs numerical analysis to evaluate the efficacy of partial reinforcement in reducing settlements in rock-filled lower subgrades. Column-shaped reinforcement areas strategically positioned at regular intervals in the lower subgrade induce soil arching in the upper subgrade, leading to a concentration of soil loads on the reinforced areas and consequent settlement reduction. The analysis employs finite element methods to investigate the influence of the size, stiffness, and spacing of the reinforced areas on settlement reduction in the lower subgrade. The numerical results guide the formulation of an optimal design approach, proposing a method to determine the minimum spacing required for reinforcements to effectively limit settlements within acceptable bounds. This research contributes valuable insights into addressing the challenges associated with settlement in concrete slab tracks, offering a basis for informed decision-making in railway infrastructure management.

Study on Environmental Impact and Mitigation Plan for Groundwater Outflow during Tunnel Excavation (터널 굴착시 유출 지하수에 의한 환경 영향 분석 및 개선방안)

  • Lee, Jeong-Ho;Kim, Hun-Mi
    • Journal of Environmental Policy
    • /
    • v.7 no.1
    • /
    • pp.31-52
    • /
    • 2008
  • It has been attempted to minimize the environmental impacts due to railroad and road constructions. But assessments of the impact for the unwanted discharges by tunneling are still poorly systematic due to lack of scientific evaluation results ; thus, the tunneling projects frequently cause wide social conflicts. The goal of this study is to provide a guideline for appropriate environmental impact forecasts, assessments, and mitigation planning of tunneling projects.

  • PDF

The railway line planning pass through the center of Seoul in the railway line of Incheon International Airport Railway (인천국제공항철도 노선에서 서울도심통과 구간의 노선 선형계획)

  • Shin Tae-Gyun;Kim In-Yong;Jung Chan-Mun;Kim Yong-Man
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1138-1143
    • /
    • 2004
  • We as a civil investment enterprise have been constructing In-cheon International Airport Railway which is a transportation means to approach In-cheon International Airport. In this alignment. a section between the Seoul station and Ka-joa follows the existing Yong-san line at the center of Seoul city and traverses Seoul subway 2,5,6 lines. So we planned that the alignment would have the shallowest depth to lie under Kyung-eui line and above the airport railroad. The alignment is planned to construct an open-box structure only 3.6m apart from the subway line 5 tunnel structure and construct the open-box structure 0.7m apart from the subway line 2 box structure. In the line planning, we investigated both the security of the existing subway structures during and after construction and the stability and workability between newly structured tunnel structures with three dimensions numerical analysis methods. Also we raised the reliability of design verification which was achieved by specialty society's review on the planned construction method.

  • PDF

An analysis study for reasonable installation of tunnel fire safety facility (터널 방재설비의 합리적 설치를 위한 분석적 연구)

  • Park, Jin-Ouk;Yoo, Yong-Ho;Park, Byoung-Jik
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.3
    • /
    • pp.243-248
    • /
    • 2015
  • Domestic road and railroad construction have been increasingly growing and for reasons of mitigating traffic congestion, urban plan and refurbishment project, deeper and longer tunnels have been built. The event of fire is the most fatal accident in a tunnel, and it can be very disastrous with a high possibility. In this study, QRA (Quantitative Risk Analysis) which is one of quantitative risk analysis approaches was applied to tunnel fire safety design and the evaluation of QRA cases and the cost comparison of QRA methods were carried out. In addition analysis of risk reduction effect of tunnel fire safety system was conducted using AHP (Analytic Hierarchy Process) and the priority of major factors that could mitigate the risk in tunnel fire was presented. As a result, significant cost reduction effect could be obtained by incorporating QRA and it is expected to design fire safety system rationally. The priority of fire safety system based on risk mitigation effect by fire safety system considering the cost is in order of water pipe, emergency lighting, evacuation passage and smoke control system.

A Basic Study for Single Shell Support System of Railway Tunnel (철도 터널의 싱글쉘 지보시스템 적용에 관한 기초 연구)

  • Jung, Daeho;Jeong, Cahnmook
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.1
    • /
    • pp.39-48
    • /
    • 2016
  • In this study, it can be shortened tunnel construction work period by introducing a single-shell tunnel does not placing the secondary concrete lining, a global research trend, reduction of the cost of the lining placement and number of benefits that can ensure the safety of long-term tunnel with a single shell it was to study the tunnel method. First, we analyze the design and construction practices relating to delete lining of the domestic design and construction practices and a comprehensive analysis of the stability study found a rock in good condition interval (1~3 grades), we propose that the lining uninstalled. In the case of domestic changes on the ground floor is very heavy underfoot conditions many so tunneling method by single shell as ground conditions are good and one preferred the water points that apply in less soil, the soil health and poor sections (4~5 grades) reflecting with respect to the concrete lining that is expected reasonable.

A Study on the Behaviour of the Station Structure due to Adjacent Construction (근접시공에 따른 정거장구조물 거동특성에 관한 연구)

  • Chung, Jeeseung;Kim, Manhwa;Lee, Sungil;Kim, Hongjoo;Shin, Youngwan
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.11
    • /
    • pp.55-64
    • /
    • 2016
  • Recently, it has been made many adjacent construction of inter-facility by the expansion of urban infrastructure facilities using the underground space. The complaints relating to the stability of the facility by adjacent construction is common. In this study, it was conducted for the subway line 5 Gimpo airport station structure in the upper Gimpo urban railway to determine the behavior characteristics of station structure according to adjacent construction. It was performed evaluation of the safety zone and excavation method for station structure. And after a review of damage evaluation, track irregularities and structural calculation by using a numerical analysis, stability of the station structure according to adjacent construction was evaluated to be secured. This study is expected to be used as basic data in advance if you need to review the effects of nearby structure according to adjacent construction.

A Study on the Excavation Damage Zone (EDZ) under TBM Advancement Based on Large Deformation Technique (Coupled Eulerian-Lagrangian) (대변형 해석기법(Coupled Eulerian-Lagrangian Technique)을 이용한 TBM 굴착손상영역 분석)

  • Lee, Seung-Yeon;Kim, Do-Hyun;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.12
    • /
    • pp.5-13
    • /
    • 2016
  • In this study, Coupled Eulerian-Lagrangian (CEL) analysis, which is one of the large deformation analyses, was incorporated to investigate excavation damage zone (EDZ) under TBM advancement. Considering the quasi-static condition, the dynamic analysis was performed to simulate the real TBM advancement and subsequently a case study on mesh and TBM excavation rate was carried out for satisfying a balance of accuracy and economic computational time. Based on this, a series of parametric studies were performed for different rock types and tunnel diameters. From the numerical analysis results, it is found that EDZ was taken to range within 0.4D(D=tunnel diameter) for most rocks. It is also found that the EDZ tends to increase as the tunnel diameter increases.

NUMERICAL STUDY WITH VENT SHAFT POSITION IN UNDERGROUND STATION (대심도 지하정거장에서 수직구 위치에 따른 수치적 연구)

  • Oh, Hyun-Joo;Shin, Dea-Yong;Lee, Sang-Gun;Kim, Dong-Hyun;Kim, Charn-Jung
    • Journal of computational fluids engineering
    • /
    • v.17 no.1
    • /
    • pp.36-43
    • /
    • 2012
  • When a high-speed train passes an underground station, large pressure waves are generated due to the piston effect. These pressure waves can cause the problems of vibration and noise as well as the ear discomfort of passengers at the underground station. This work numerically analyzed the pressure wave generation and propagation in an high-speed railway underground station, and the optimal location for vent shafts was studied to improve the passenger comfort by reducing the magnitude of the pressure wave and its rate of change. The evolution of pressure field in the underground station was calculated using a CFD(Computational Fluid Dynamics) software(Fluent), where the axis-symmetric two-dimensional model verified by Wu was used. And this study is applied to modelling of the underground station and the tunnel from Daegok station A-line of GTX(Great Train Express). From the result, we can have a conclusion that the role of vent shafts respectively were different according to the position in and out the underground station. Also Vent shaft in the underground station widely reduced pressure magnitude. And vent shaft out underground station reduced initial pressure peak value. Double vent shafts installed at tunnel toward station entrance and inside of the tunnel are the most efficient to reduce pressure. and pressure reduction increases according to the number of vent shaft.

A Case Study on Blasting at the Tunnel Excavation in an Adjacent Section of a Subway Station (지하철역 인접구간에서의 터널 발파굴착 사례)

  • Lee, Hyo;Kim, Jeoung-Hwan;Hwang, Nam-Sun
    • Explosives and Blasting
    • /
    • v.40 no.2
    • /
    • pp.25-34
    • /
    • 2022
  • Recently, there has been an increasing number of cases of improving constructability by using electronic detonators with precise delay time in tunnel blasting sites. This case is a case of conducting test blasting using with non-electric detonator and electronic detonator at the site of 『Seoul Metropolitan Area Express Railroad Route A Private Investment Project Section 00』 that requires careful management of vibration and noise. Although this site was designed with a non-electric detonator, it was attempted to improve the advance rate and control vibration and noise by mixing the non-electric detonator and the electronic detonator due to the decrease in the advance rate. As a result of the blasting, the target value was achieved with an advance rate of about 85% and a maximum measured value of vibration and noise is 0.215cm/sec and 73.22dB(A) which were measured below regulatory standards. As blasting works in downtown areas, it is necessary to designate measurement and management objects to continuously manage vibration and noise.