A Study on the Improvement of Project Management System for International Competitive Power and Global Business Strategy of Rail Project (철도사업의 종합사업관리 국제경쟁력 강화방안에 대한 연구)

  • Lee Young-Joo;Jang Seong- Yong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1595-1600
    • /
    • 2004
  • High speed railroad project management has been almost completed by starting operation of Seoul-Busan high speed railroad with the exception of a few constructing blocks currently in April, 2004. After Korea Rail Network Authority was established in 2004, it needs to develop new project management system for both conventional railroad construction and high speed railroad construction for domestic railroad projects, while it plans to invest in overseas railroad project for logistics innovation and improvement in passenger transport services on a large scale. Therefore this paper provides the method that we can adapt the project management system for high speed railroad containing experiences and know-how from construction of high speed railroad for both conventional railroad construction and high speed railroad construction or improve project management system for high speed railroad to use it as project management system for overseas railroad projects.

  • PDF

The Analysis of Railroad Operating Costs in Korean Railroad Projects

  • SungWook KANG;DongHee KIM;GyuBae KIM
    • East Asian Journal of Business Economics (EAJBE)
    • /
    • v.12 no.1
    • /
    • pp.35-42
    • /
    • 2024
  • Purpose: A railroad project is a complex system with large construction costs in the initial stage and ongoing operating costs over its lifecycle. Current railroad projects tend to be based on construction options, which leads to huge deficiencies in operating costs. This phenomenon results from a lack of appropriate tools to accurately estimate a railroad project's lifecycle costs. This study attempts to analyze the major components of railroad operating costs and to propose a decision-making system for analyzing the long-term lifecycle costs of railroad projects. Research design, data and methodology: We review the literature and analyze the current status of railroad operating costs in Korea and overseas. Based on previous projects, a framework for project options and operating costs is proposed. The framework is applied to actual railroad projects to demonstrate the validity of the model. Results: Case analysis shows that our framework is comprehensive in analyzing the primary aspects of railroad operating costs and plays an effective role in choosing various railroad project options. This study points out that the railway project operates inefficiently because estimating long-term costs without reflecting specific project options causes many errors. Conclusions: A major contribution of this study is the development of an improved framework for accurately estimating operating costs and providing policymakers and engineering firms with a holistic decision support system. Detailed components in estimating operating costs of the railroad business are discussed. And we present a decision-making tool that policymakers and private businesses can use in planning the railroad business.

Development of Planning Method for Double-Tracking of Single Track Railroad based on the Intelligent Rail Alignment Planning Program (ei-Rail) (지능형철도선형계획 프로그램(ei-Rail) 기반의 단선철도 복선화 계획 기술개발)

  • Kim, Jeong Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.837-842
    • /
    • 2022
  • The "Intelligent Railroad Alignment Design Program (ei-Rail) developed in 2013 has been adopted in the planning and the evaluation/validation of design results of oversea railroad construction projects. Target countries of Korean railroad industries requires the operating speed increase with alignment improvement and the double tracking of prevailing single track railroads as well as new railroad construction. This study is to develop an additional module for double tracking project of prevailing single track railroads in the ei-Rail. The developed method is based on the geometrics of prevailing railroad, and the definition of planned project determines the project cost based on the unit cost by work type, and provides the draft design of double track. The module was validated with a oversea case. It is then expected for oversea railroad double tracking project more efficiently in planning and the evaluation of design results.

A Study on the Systems Engineering Management Plan for the Korean High-speed Electric Multiple Unit 400km/h Experimental (차세대 고속열차 개발을 위한 시스템엔지니어링 관리계획 연구)

  • Lee, Tae Hyung;Choi, Sung Hoon;Kim, Sang Soo;Park, Choon Soo;Kim, Ki Hwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.3 no.2
    • /
    • pp.17-24
    • /
    • 2007
  • The HEMU-400X(High-speed Electric Multiple Unit 400km/h eXperiment) project starts in 2007. It is required to control and balance the systems engineering activities throughout the project life cycle for a successful completion of the project. The Systems Engineering Management Plan(SEMP) is the primary, top level technical management document for the integration of all engineering activities within the context of, and as an expansion of, the project plan. A SEMP should be prepared for each project and regularly updated as development progresses. This paper proposes the systems engineering management plan for the HEMU-400X project.

  • PDF

Construction of verification process for the railway total safety technology development project (철도종합안전기술개발사업의 성과물 검증 프로세스 구축)

  • Yoon, Hyuk-Jin;Han, Soon-Woo;Kim, Sang-Ahm;Choi, Kyung-Jin;Cho, Yun-Ok
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1187-1192
    • /
    • 2007
  • Recently, many organizations such as, including government, railroad operational, railroad facilities managemental and research authorities have made a lot of efforts to identify and prevent hazards from leading to accidents and solve them all over the railroad industry. Railroad total safety technology development project conducted as one of national R&D projects has established business formation structure based on system engineering as an effort to define and give a solution to facing problems in the field of railroad. This paper is building procedures to verify the outcomes derived from this project. The verification process is the one for verifying the outcome produced in the final stage of the project or during the project. It makes sure that the system is satisfying the system requirements through verification of the outcomes produced after conducting the project for verification. We've made verification plan for technically reasonable verification using verification process developed through this research, and established master verification plan in the level of 15 detailed projects for interim and final outcomes produced.

  • PDF

Benefits of Early Stakeholder Involvement in Korean Railway Infrastructure Project

  • KANG, SungWook;KIM, DongHee;YU, JaeKyun;LEE, KyungChul;MOON, DaeSup
    • The Journal of Economics, Marketing and Management
    • /
    • v.9 no.5
    • /
    • pp.15-25
    • /
    • 2021
  • Purpose: In the Korean railway infrastructure process, contractors and operators are involved at a later stage, which results in significant inefficiency. This study examines the benefits of early stakeholder involvement in Korean railway infrastructure projects and provides practical guidelines. Design, data and methodology: Literatures and foreign cases are analyzed. Building on the new product development model, we derive propositions explaining the relationship between early stakeholder involvement and the performance of Korean railway infrastructure project. Results: Major propositions include that early involvement of contractor has a positive effect on the project performance by shortening the infrastructure construction period and that early involvement of railway operator has a positive effect on the project performance by improving the effectiveness of railway infrastructure. Four requirements for the success of early stakeholder involvement are addressed. Conclusions: This study suggests that early stakeholder involvement shortens the construction period and improves railway infrastructure effectiveness. Academic contribution is to present the framework on railway infrastructure projects as holistic interactions among stakeholders. Practical contribution is to provide railway policy makers and other business practitioners with policy guidelines to improve railway infrastructure project process and to recommend an open access to relevant data.

A Study on the Systems Engineering Detailed Schedule for LRT Project (경량전철사업의 시스템엔지니어링활동을 위한 상세일정계획 작성방법 연구)

  • Han, Seok Youn;Kim, Joo Uk;Choi, Yo Chul;Kang, Do Hoon
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.2
    • /
    • pp.11-17
    • /
    • 2012
  • Suppliers in light rail transit project makes a systems engineering management plan(SEMP) as a top level plan which has a SEMS and SEDS as an control and monitoring means. In this paper, we analyze the international standards and some related documents, and present the directions to make the SEMS and SEDS which have WBS, accomplishments, schedule, events, person in charge. And then customize the project management tool and make SEMS and SEDS of LRT project as an example. The research results can be applied in LRT project after tailoring based on the project.

Introduction to SE Process Application on the development project of the Korean High-speed Train(HSR 350-x) (한국형 고속열차(HSR 350-x) 개발사업의 시스템엔지니어링 프로세스 적용사례 소개)

  • Park, Choonsoo;Lee, Tae Hyung;Choi, Sunghoon;Kim, Kihwan
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.4 no.2
    • /
    • pp.15-26
    • /
    • 2008
  • The Korean High-speed train was developed during 1996 to 2007. This development project consists of many sub-projects and the train-system includes a lot of sub-systems. In order to promote the project on planned cost and time effectively, we tried to apply systems engineering process during the whole life-cycle. The purpose of this paper is to introduce the systems engineering process applied to this project. Activities carried out in each phase such as pre-design, detailed-design, integration & verification are described.

  • PDF

The DB structure for Standard Criteria of Urban Transit Facilities (도시철도시설 표준화기준을 위한 DB구축방안 연구)

  • Lee, Woo-Dong;Kim, Jin-Ho;Han, Seok-Youn;Sin, Won-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2008.10c
    • /
    • pp.213-214
    • /
    • 2008
  • Since standardization project is composed of complicate system, such as vehicle, signal, electric power and railway, how to build management system of the project has influence on the success of the project for the first stage of the project. The computer system design tool supports to carry out requirement analysis, DB construction, and history and follow-up management efficiently. Therefore, the aim of this study is to investigate the method to optimize schema using computer system design tool.

  • PDF

Reconnecting the Trans-Korean Railway and future aspirations of Northeast Asia Railway Network (최근 남북.대륙철도 협력현황과 동북아철도협력 구상)

  • Na, Hee-Seung
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1029-1036
    • /
    • 2006
  • South and North Koreas are putting forth efforts to overcome the distrust and animosity of the past 50 years to open an era of harmony and cooperation where the two halves can work together for mutual benefits. As part of those efforts, both parties are working now to reconnect the railways between the North and the South that remained broken for the past 60 years. In addition, the restoration of Trans-Korean railway paves the way for the "Silk Road Railway" which links European continent to Asian regions and Pacific Rim. The restoration project acts as a conduit for cooperation within in the Northeast Asian continent, hence, an important tool for facilitating peace and prosperity within the Northeast Asian region. Notably, the Railway project is regarded as the cardinal future-oriented peace building project for cultivating constructive, cooperative relations (Trans-Korean Railway and Trans-Asian Railway works) by stimulating human resources and commodity flows through railroad transportations. Northeast Asian region takes on a similar instance to the unification of European continent through its astounding development in railroad transportation, i.e., the international re-construction of Railroad lines will act as a catalyst to link Eurasian areas into one regional community for cooperation and peace. At present, the government is creating a momentum to bind trans-Eurasian railroad works and an initiative for "Northeast Asia Railroad networks and consultative organization". The South Korean administration paves the way to develop railroad network within South-North Korean, Russia and Eurasian region. It also fosters railroad cooperation with China for people and goods transports. To achieve such objectives, the project requires wide publicity and cross-border cooperation from concerned countries. The blueprint would have to be drafted up for Northeast Asian railroad train demonstration runs, Northeast Asian transportation agreements, with a bid to promote constitute Northeast Asian Railroad Consultation body. Moreover, the government would also have to prepare both, a draft of the linkage and the mandated standardized proposal.

  • PDF