• Title/Summary/Keyword: Railroad Trains

검색결과 385건 처리시간 0.041초

기존철도에서 고속차량의 주행을 위한 고려사항에 관한 연구 (The study for the matters to be considered for running of High Speed Train at Conventional Railroad)

  • 박광복;한성수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.362-368
    • /
    • 2005
  • The KTX is now operating to the commercial purpose at Gyeong-Bu high speed railroad and Ho-Nam conventional railroad to be started on April, 2004. The trains were not found any problems at high speed railroad, but at Ho-Nam line were known to be have the few problems due to operating no planed. In this report should be studied for the effects of the lateral forces and wheel bases, brake distances etc., that high speed trains should be considered on curve running at the conventional railroad. The studied contents for operating at the conventional railroad shall be checked for the technical requirements from design stage, and the trains should be supplied and manufactured to car system to have the good running performances.

  • PDF

폐색 구간 길이에 따른 동대구-부산간 운전 시격 연구 (A Study on the Headway bewteen Dongdaegu and Busan by block system length)

  • 김용규;양도철;김종기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 B
    • /
    • pp.1292-1294
    • /
    • 2002
  • In this study, the block section length of the given area has been analyzed to improve the headway which caused by the mixed operation of high speed trains and normal trains on the electrified railway of Dongdaegu to Busan. After establishing the average length of block section and the adjustable average length of block section of Dongdaegu to Busan, it is possible to perform the headway simulation regarding the signal system based on the established length. Although high speed trains as well as low speed trains including freight trains operate together, the experimental results indicate that the modification of the block section length shows the possibility of the improvement of headway.

  • PDF

무가선 전동차용 울트라커패시터 모듈 충·방전을 위한 DC-DC 컨버터 설계 (Design of DC-DC Converter to Charge and Discharge Ultra-Capacitor Modules for Wireless Trains)

  • 조정민;한영재;김재원;이장무;김길동
    • 전기학회논문지
    • /
    • 제64권12호
    • /
    • pp.1776-1781
    • /
    • 2015
  • Electric power trains receive electric power from overhead cables via a pantograph system. Power collector system in trains increase the cross section of tunnel and require a massive coreless filter reactor in propulsion inverter because of the power disturbance by contact loss phenomenon of a train. In this paper we proposed a wireless train which can run to next station with charging energy of ultra-capacitor module block. We designed DC-DC converter to charge and discharge ultra-capacitor modules by using Next Train running test results and confirm the feasibility of the proposed system through simulation.

2층 열차의 해외운용 사례 분석 (Analysis of Overseas Double Deck Train Operations)

  • 김형진
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.1018-1023
    • /
    • 2007
  • Recently, a double deck train is considered as the one of solutions for efficient and comfortable railroad transportation systems on busy lines without any big investment on existing railroad infra-structures in many countries. However, prior to the operations of double deck trains on existing lines, careful investigations should be performed since the double deck trains have big cross sections, high mass centers and no enough spaces for mounting electric equipments. In this paper, several operational cases of double deck trains in other countries have been reviewed for preparing double deck train operations in Korea.

  • PDF

KTX-산천 열차용 모터 감속기 고정대의 피로 수명 평가 (Fatigue Life Evaluation of Motor Block Bracket Units for KTX-Sancheon Trains)

  • 이찬우;이동형
    • 한국정밀공학회지
    • /
    • 제29권6호
    • /
    • pp.626-631
    • /
    • 2012
  • In this study, fatigue life of the motor block bracket units for KTX-Sancheon trains was assessed. Design evaluation for railway structures was performed based on the UIC 566 regulation, and test and evaluation of fatigue life in welded parts was performed in accordance with standard ERRI B 12/RP17 and ERRI B 12/RP60. The actual vehicle dynamic stress testing was executed in KTX-Sancheon service line with the service operating speed. The dynamic stress was measured with commercial data acquisition system (MGC plus). The cumulative damage was evaluated by applying standard BS 7608 - Class F and cycle counting was used rain-flow counting method. As a result, the motor block bracket units for KTX-Sancheon trains was designed to fit the regulation and the safety of fatigue life for 30 years, assuming that KTX-Sancheon trains travels 600,000km annually, were confirmed under current operating conditions.

지하철 운전시격 단축을 위한 이동폐색 시뮬레이션 (Simulation of the Flexible Moving Blocks System to Shorten Headway of Subway Trains)

  • 정동윤
    • 한국시뮬레이션학회논문지
    • /
    • 제6권2호
    • /
    • pp.59-69
    • /
    • 1997
  • This paper proposes a simulation method of train control system to increase railroad transportation capacity in the Seoul Subway. Comparing with the conventional fixed block system, a new train operation method of "moving block system" shows a more capability of same railroad. A graphic simulation program is developed for application of moving block system to Seoul subway train control system. The result of the simulation program shows a shorten headway i.e. a more dense operation of trains and a higher efficiency of railroad with the suggested moving block system.

  • PDF

지상 및 지하구간 운행 2층.급행열차 추진시스템에 관한 연구 (A Study on the traction system of double deck(express trains for ground and underground)

  • 백광선;이강원;온정근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 B
    • /
    • pp.1622-1624
    • /
    • 2005
  • In this paper, traction system of a double deck train were designed to examine technical reasonableness for driving on the ground and underground. Double deck trains operated in other countries were also considered. For designing the electric devices, two types of accelerations and electric devices arrangements which are based on the current subway system were considered.

  • PDF

기존선을 통과하는 고속차량의 적절한 주행속도에 관한 연구 (A Study on Appropriate Driving Speed for High-Speed Trains Running the Conventional Line)

  • 함영삼
    • 한국정밀공학회지
    • /
    • 제31권9호
    • /
    • pp.773-776
    • /
    • 2014
  • KTX (Korea Train eXpress) is the first high-speed train operated in Korea and its highest speed reaches 300 km/h. Korean high-speed trains are mostly operated on the railroads exclusively designed for high-speed trains, but the sections of Seoul~Gwangmyeong, nearby of Daejeon station and Dongdaegu are operated on the existing tracks having the speed less than 150 km/h. With this paper, we'd like to analyze the lateral force that occurs between the wheels and the rail when high-speed trains were operated on the existing track section to suggest an appropriate driving speed for high-speed trains. As the rigid wheel base of the high-speed train is 3m which is about 50% longer than normal vehicles, it works as an advantage for high-speed driving. However, as the lateral force becomes higher than normal vehicles when driving on curves, plans to reduce wear-outs on the wheels are required.

교류전기철도 급전시스템의 전차선 전압해석 (Analysis for Catenary Voltage of The ATs-Fed AC Electric Railroad System)

  • 이승혁;정현수;김진오
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(I)
    • /
    • pp.490-496
    • /
    • 2002
  • This paper presents exact Autotransformers(ATs)-fed AC electric Railroad system modeling using constant current mode far locomotives. An AC electric railroad system is rapidly changing single-phase load, and at a feeding substation, 3-phase electric power is transferred to paired directional single-phase electric power. As the train moves along a section of line between two adjacent ATs. The proposed AC electric railroad system modeling method considers the line self-impedances and mutual-impedances. The constant current mode model objectives are to calculate the catenary and rail voltages with the loop equation. When there are more than one train in the AC electric railroad system, the principle of superposition applies and the only difference between the system analyses for one train. Finally, this paper shows the general equation of an AC electric railroad system, and that equation has no relation with trains number, trains position, and feeding distance.

  • PDF

단권변압기 교류전기철도 급전시스템의 전차선 전압해석 (Analysis for Catenary Voltage of The ATs-Fed AC Electric Railroad System)

  • 정현수;이승혁;김진오
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권9호
    • /
    • pp.493-499
    • /
    • 2003
  • This paper presents exact Autotransformers(ATs)-fed AC electric Railroad system modeling using constant current mode for locomotives. An AC electric railroad system is rapidly changing single-phase load, and at a feeding substation, 3-phase electric power is transferred to paired directional single-phase electric power. As the train moves along a section of line between two adjacent ATs. The proposed AC electric railroad system modeling method considers the line self-impedances and mutual-impedances. The constant current mode model objectives are to calculate the catenary and rail voltages with the loop equation. When there are more than one train in the AC electric railroad system, the principle of superposition applies and the only difference between the system analyses for one train. Filially, this paper shows the general equation of an AC electric railroad system, and that equation has no relation with trains number, trains position, and feeding distance.