• Title/Summary/Keyword: Railroad Crossing

Search Result 83, Processing Time 0.025 seconds

A study on the train passage control at railroad bridge under heavy rainfall (철도교량 홍수시 열차운전규제기준에 대한 연구)

  • Park, Young-Kon;Lee, Jin-Wook;Yoon, Hee-Taek;Mok, Jai-Kyun;Kim, Seon-Jong
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1001-1006
    • /
    • 2004
  • Railroad disasters are frequently occurred by man-made causes or natural causes. In general, man-made causes are illegal construction practices, deterioration with the lapse of time and railroad crossing accidents, and natural causes are rainfall. snow, wind, earthquake, etc. Of cause, railroad disasters by man-made causes are prevented from keeping the safety principle, constructing multi-level crossing, securing enough men of ability and financial resources and making a thorough check using equipments with high capacity. And railroad disasters by natural causes are also minimized by construction of disaster prevention facilities, introduction and operation of general disaster prevention system and reasonable train passage control. Therefore, to setup the criterion of train passage control for train safety at railroad bridge under heavy rainfall, risky factors, national and oversea criteria under such circumstances are reviewed and a scheme to setup the criterion is suggested.

  • PDF

Study on Crossing Tendencies of Birds by Road Type for Validation of Wildlife Crossing Structures Targeting Avian Species

  • Song, Eui-Geun;Lee, Hwa-Su;Park, Hee-Bok;Woo, Dong-Gul;Park, Tae-Jin;Chun, Su-Won;Sim, Seung-Woo;Cha, Hyoun-Gi;Lim, Anya;Choi, Tae-Young
    • Journal of Forest and Environmental Science
    • /
    • v.34 no.2
    • /
    • pp.136-141
    • /
    • 2018
  • The purpose of this study is to compare the bird crossing of roads by type (Expressway 1, railroad-provincial road and Highway 4) and the crossing of roads according to the size of birds. The greatest number of avian species and individuals crossing road per 10 minutes were found on railroad-provincial road ($8.96{\pm}1.92$ and $29.33{\pm}11.94$, respectively), while the lowest number of avian species and individuals were found on Expressway 1 ($2.96{\pm}1.04$ and $6.13{\pm}2.89$, respectively), which has the widest width. In addition, the number of small-sized bird (<20 cm) crossing the Expressway 1, railroad-provincial road, and Highway 4 was lower than that of the medium-sized bird (${\geq}20cm$). Current wildlife crossing structures have been focused on mammals, amphibians and reptiles, but future structures should also consider birds.

Development of a Time-Based Railway Crossing Control System and Evaluation (철도건널목 정시간 제어방식 개발 밑 효과분석에 관한 연구)

  • Park Dongjoo;Oh Ju-Taek;Lee Sun-Ha;Jung Chun-Hee;Shin Seong-Hoon
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.2
    • /
    • pp.145-154
    • /
    • 2005
  • Traffic accidents at highway-rail crossing result in larger social and economic damages than the accidents at the typical highway intersections. The traditional control and warning systems of the highway-rail crossing have limitations in that 1) they do not recognize the differences of the trains' arrival times because they rely on the distance-based control system, rather than the time-based one, and 2) thereby they usually cause longer delays of vehicles and pedestrians at the highway-rail crossings. The objective of this study is to develop a time-based railroad crossing control system which takes into account the speed and expected arrival time of trains. using the spot speeds and acceleration rates of trains measured at three points, the developed system was found to be able to accurately estimate the arrival time of train. VISSIM simulation package was utilized to compare system effect of the developed time-based railroad crossing control system with that of the conventional distance-based one. It was found that the developed time-based railroad crossing control system reduced the average travel time, maximum delay length, average delay time, and average number of stop-experienced vehicles as much as 7.0$\%$, 75.6$\%$, 12.7$\%$, and 60.0$\%$, respectively, compared with those from the conventional distance-based one.

Joint Element Structure Method on the Subway Box Structure unere Railroad (철도하부 가도교 설치에 대한 JES공법)

  • Pi, Tae-Hee;Cho, Kook-Hwan;SaGong, Myung
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.973-981
    • /
    • 2008
  • This document presents the JES(Joint Element Structure) method that has been adopted for the firs time in our country for the construction of the structure crossing under the railroad without open excavation. Front Jacking Method, Tubular Roof Construction Method, New Tubular Roof Method and Joint Element Structure Method are commonly used for the construction of structures crossing under the railroad. JES Method, frequently used in Japan recently, is a new method to construct the structures crossing under the railroad in a safe manner and in a relatively short period of time by utilizing the steel elements with the joints through which the load in the vertical angle to the axial direction is transferred to the next element. The elements are tied to each other through the joints to form the permanent walls of a Rahmen structure under the road without open excavation and without limitation to the length in a convenient way. Through the case study in the project of a Subway Box Culvert Improvement for the Gyeonguiseon Railroad in front of Yonsei University using the JES Method, the cost and period of construction in various types of soil is investigated compared to the Front Jacking Method. Furthermore, by analyzing the results of instrumentation measurements carried out throughout the construction, comparison between the actual displacement in the ground and the predicted displacement in the design is made to provide the considerations to be counted for the design. In conclusion, comparison in the field of economic feasibility, constructability and safety between the JES Method and Front Jacking Method, which is most frequently adopted in our country at present, is made to present the JES Method as a new alternative for the non-open excavation construction method for the structures crossing under the railway.

  • PDF

The Analysis of Ground Behavior on the Crossing Construction Under Railroad Using Field Measurement (철도지하횡단공사시 현장계측을 통한 지반거동 분석)

  • 엄기영;신민호;김지훈
    • Proceedings of the KSR Conference
    • /
    • 2001.10a
    • /
    • pp.546-551
    • /
    • 2001
  • We analysed the affection to subgrade that railway underground crossing construction make with studying displacement of subgrade of each construction methods and processing of Front jacking method and Pipe roof method with already-measured data(during the construction) and additionally-measured field test data in railway underground crossing construction. We measured vertical and horizontal displacement at two construction places of front jacking method and pipe roof method each, and we analysed the results of the measurement at each stage of construction to applied to the excution of construction.

  • PDF

A Study on Behavioral Characteristics of Track Roadbed according to Steel Pipe Press-in Excavation during Construction of Underground Railway Crossing

  • Kim, Young-Ha;Eum, Ki-Young;Kim, Jae-Wang
    • International Journal of Railway
    • /
    • v.6 no.2
    • /
    • pp.69-77
    • /
    • 2013
  • In this study, numerical analysis and model experiments were conducted to analyze behavioral characteristics acting on the track roadbed with excavation through steel pipe injection, a non-exclusive method of crossing construction under railroad as primary target. In model experiments that simulate injection excavation behaviors with an increase in the depth of soil cover, the upper displacement was measured by construction of the first and the second pipes in order to predict actual behaviors, and the behavior characteristics were verified through numerical analysis. The investigation results showed that surface displacement was smaller under the condition of higher soil cover. In the case of injecting two pipes, when the first pipe was injected, deformation of the surface increased linearly in both settlement and uplift experiments. However, when the second pipe was injected, the amount of change was found to be very small due to the relaxation and plastic zones around the first pipe. In addition, the results of numerical analysis on the same cross section with the model experiment found that the results of investigation into settlement ratio and volume loss were in very good agreement with those obtained by the model experiment.

Laser Radar-Based Railroad Crossing Detection Device Developed for Crossing Security Device Integration (건널목 보안장치 통합화를 위한 레이저레이더기반 철도 건널목 지장물 검지장치 개발)

  • Baek, Jong-Hyen;Kim, Gon-Yop;Song, Yong-Soo;Oh, Seh-Chan;Kim, Yong-Kyu;Chae, Eun-Kyung
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.38C no.5
    • /
    • pp.471-478
    • /
    • 2013
  • In this paper, we have designed and implemented an obstacle detecting device based laser radar. It is an alternative to solve through problem analysis of that are currently operated safety equipment and status research of domestic railway crossing. It is target to improve the safety and reliability of the rail traffic through effective obstacle detection at crossing account for a large proportion of train accidents. suggest a system to overcome the problems caused by aging and limitation of existing safety equipment. Design a crossing obstacle detection device that utilizes laser radar scanner, proved this through performance evaluation and testing of the prototype.

Design of the Railbeam Lengths at the Roadbed (철도 레일빔 설계법에 대한 연구)

  • Jung, Hyuksang
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.1
    • /
    • pp.21-28
    • /
    • 2016
  • This paper deals with contents on the estimation of rail beam from the geotechnical engineering aspect. Rail beam is reinforced rail installed on the inside and outside of rail to prevent differential settlement during the construction period of railroad crossing construction. Such rail beam is frequently being installed to ensure stability of existing railroad facilities because of increasing constructions of underground structures crossing railroad in recent. However, there is a difficulty in design due to lack of design standard on rail beam length. Furthermore, derailing accidents are also occurring as a result of rail beam length shortage. Accordingly, this paper presented flow chart based on the classification into soil ground and bedrock ground for the rail beam length estimation. In addition, case study was conducted on rail combination and location through which effective rail combination and location were ensured.

Context-Aware Smart Railroad Crossing Safety Management System based on OSGi Framework (OSGi 프레임워크 기반 상황인지형 스마트 철도 건널목 안전관리시스템)

  • Lee, Seung-Hyun;Jang, Kyung-Soo;Ryu, Sang-Hwan;Shin, Dong-Ryeol
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.10 no.6
    • /
    • pp.169-177
    • /
    • 2010
  • A railroad is used to a lot of area and it is an eco-friendly and an effective means of communication which is a transport for passengers and products. In recent years, the accidents caused by subway and railroad are cognate with people. We need to come up with preparing measures to avoid the accidents. In this paper, to prevent an accident developing and implementing a system which is a railroad management safety system is the purpose. The system is able to provide scalability for smart railroad safety service based on context aware information. Besides, it is able to furnish flexibility through the OSGi framework.

A Study on Intelligent Railway Level Crossing System for Accident Prevention

  • Cho, Bong-Kwan;Jung, Jae-Il
    • International Journal of Railway
    • /
    • v.3 no.3
    • /
    • pp.106-112
    • /
    • 2010
  • Accidents at level crossing have large portion on train accidents, and causes economical loss by train delay and operational interruption. Various safety equipments are employed to reduce the accident at level crossing, but existing warning device, and crossing barrier are simple train-oriented protection equipments. In this paper, intelligent railway level crossing system is proposed to prevent and reduce accidents. For train driver's prompt action, image of level crossing and obstacle warning message are continuously provided to train driver through wireless communication in level crossing control zone. Obstacle warning messages, which are extracted by computer vision processing of captured image at level crossing, are recognized by train driver through message color, flickering and warning sound. It helps train driver to decide how to take an action. Meanwhile, for vehicle driver's attention, location and speed of approaching train are given to roadside equipments. We identified the effect of proposed system through test installation at Sea train and Airport level crossing of Yeong-dong line.

  • PDF