• Title/Summary/Keyword: Rail operating cost

Search Result 26, Processing Time 0.018 seconds

Optimization of Planning-Level Locomotive Scheduling at KNR and Development of Its Implementation Prototype Program (한국철도에서의 계획단계 동력차 스케줄링 최적화 및 전문가 지원시스템의 프로토타입 프로그램 개발에 관한 연구)

  • 문대섭;김동오
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.46-53
    • /
    • 1999
  • As of July 1999, i,185 lomocotives(excluding metropolitan area electric locomotives) are in Korean National Railroad(KNR). With this limited number of resources assigning locomotives to each trains of timetable is very important in the entire railway management point of view because schedule can be regarded as goods in transportation industry. On a simple rail network, it is rather easier to assign proper locomotives to trains with the experience of operating experts and get optimal assignment solution. However, as the network is getting bigger and complicated, the number of trains and corresponding locomotives will be dramatically increased to rover all the demands required to service all of the trains in timetable. There will be also numerous operational constraints to be considered. Assigning proper locomotives to trains and building optimal cyclic rotations of locomotive routings will result in increasing efficiency of schedule and giving a guarantee of more profit. The purpose of this study is two fold: (1) we consider a planning-level locomotive scheduling problem with the objective of minimizing the wasting cost under various practical constraints and (2) development of implementation prototype program of its assigning result. Not like other countries, i.e. Canada, Sweden, Korean railroad operates on n daily schedule basis. The objective is to find optimal assignment of locomotives of different types to each trains, which minimize the wasting cost. This problem is defined on a planning stage and therefore, does not consider operational constraints such as maintenance and emergency cases. Due to the large scale of the problem size and complexity, we approach with heuristic methods and column generation to find optimal solution. The locomotive scheduling prototype consists of several modules including database, optimization engine and diagram generator. The optimization engine solves MIP model and provides an optimal locomotive schedule using specified optimization algorithms. A cyclic locomotive route diagram can be generated using this optimal schedule through the diagram generator.

  • PDF

A Revenue Allocation Model for the Integrated Urban Rail System in the Seoul Metropolitan (수도권 도시철도 수입금 정산 분석모형)

  • Shin, Seong-Il;Noh, Hyun-Soo;Cho, Chong-Suk
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.5 s.83
    • /
    • pp.157-167
    • /
    • 2005
  • Seoul metropolitan public transport reform results in the introduction of the semi-public operation and distance-based fare policies. With implementation of these policies, public transport revenue allocation has been (will be) evolved very complicated because the existing revenue allocation issues have not only been clearly solved, which is generated by the combined relationship among Korea Railroad Corporation (KRC). Seoul Metropolitan Subway Corporation (SMSC). Seoul Metropolitan Rapid Transit Corporation (SMRTC), and Incheon Rapid Transit Corporation (IRTC), but also the revenue allocation problem between bus and urban railroad-related organizations need to be considered in this combined framework. On top of that. based on the future plans such as the private sector's railroad construction plan(s), the light rail transit construction plans of several local governments and the join of remained bus lines of Seoul metropolitan areas, it is understood that the revenue allocation among public transport operating organization will become one of main issues of operation organization as well as local and central governments. As a basic approach for revenue allocation of public transport operation organizations, the purpose of this paper is to propose an integrated model applicable to estimate degree of service contribution in passenger carriage in the combined public transport network. With a hypothesis that the complete electronic card system is deployed, this paper supposes every passenger's loading and alighting stations is recordable. Thereby, this paper limits research scope as to Seoul metropolitan railroad area since used route(s) between origin and destination stations can not be traceded because transfer stations each passenger path through is not recorded. Each model proposed in the paper is as follows: 1. a generalized cost reflecting passenger's transfer behavior; 2.a K path model for determining similar routes between O-D; 3.an assignment model for loading O-D trips onto the detected similar routes using Logit Model.

A Study on Modelling and Tracking Control System Design of RTGC(Rubber-Tired Gantry Crane) (RTGC의 모델링 및 주행제어기 설계에 관한 연구)

  • Jeong, Ji-Hyun;Lee, Dong-Seok;Jeong, Jeong-Soon;Kim, Young-Bok
    • Journal of Navigation and Port Research
    • /
    • v.34 no.6
    • /
    • pp.479-485
    • /
    • 2010
  • To handle container effectively is one of the most important factors in a port because working time is linked soon into cost. Since the middle of 1990s, RMGC(Rail-Mounted Gantry Crane) and RTGC(Rubber-Tired Gantry Crane) have been developed and widely used to operate containers in the yard. The RTGC is more difficult than RMGC in the automatic control system design. Although, the RTGC is largely advantaged to free driving environment, it has some considerable disadvantages in the system operating. In general, the problems are due to tire slip and lack of tire pressure etc. Therefore, a desirable research result has not been shown in this time. So, in this paper, we propose a new approach to design tracking control system for the RTGC in which the mathematical modeling is included. From the simulation results, the control performance of the designed control systems is evaluated.

Diagnosing Railway Incident Response Manuals and Their Improvement (철도사고 대응매뉴얼 과부하에 대한 진단과 개선방안 연구)

  • Lim, Kwang-kyun;Yun, Gyeong-cheol
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.5
    • /
    • pp.698-707
    • /
    • 2016
  • An emergency manual is designed to minimize the extent and effect of lives and assets; it is not designed to prevent an accident. There have been continuous arguments in terms of manual effectiveness regardless of the fact that much effort and great cost have been invested in emergency planning and operations. The problems are that there are a number of different emergency manuals, that these manuals are hard to understand and rarely used due to their complexity, that they provide little direction toward the taking of action, and that coordination is difficult between those involved; all of these problems are related to two different pieces of legislations that define emergency manuals in different ways in terms of the contents required. The study has tried to respond to these arguments by exploring relevant legislation to identify emergency manuals that can be used to respond to rail incidents/accidents, for which previous responses have seemed inefficient. Further, some parts of the emergency manual contents are found to overlap, including the ways of differentiating incident responses, personnel roles and responsibilities by types of accident, and threat levels, all of which has resulted in unnecessary pages of the manuals. In preparing and operating such manuals, this study recommends that one piece of legislation that directly affects rail undertakings must be applied in an effort to increase effectiveness.

Evaluation on the Applicability of the Conventional Roadbed Stiffness for High Speed Concrete Track (일반철도 노반 강성조건에서의 고속철도용 콘크리트 궤도의 적용성 검토)

  • Lee, Jin Wook;Lee, Seong Hyeok;SaGong, Myung;Lyu, Tae Jin
    • Journal of the Korean Society for Railway
    • /
    • v.16 no.1
    • /
    • pp.40-46
    • /
    • 2013
  • Based on Korean railway design standards, the thicknesses of the reinforced roadbeds of conventional and high speed railways are different, and so too, for the size distribution of the ballast particles. Accordingly, considerable cost would be required to increase operating speeds of conventional lines, in particular related to changing from a ballasted track system to a ballastless one. In this study, applicability of a roadbed which supports conventional ballasted track, for use as a ballastless track for a high speed rail line was examined. A reinforced roadbed for a conventional railway is 20cm thick, and the type of material used for a conventional reinforced roadbed is M-40 (crushed gravel for road embankments). A dynamics test was conducted to evaluate the occurrence of the permanent settlement of the track substructure. These results suggest that, without changes to the track substructure, an operational speed of 400km/h is feasible with a ballastless track. This result; however, is from laboratory experiments. Further studies, such as numerical analyses or field validation, are required.

Research and Application of Fault Prediction Method for High-speed EMU Based on PHM Technology (PHM 기술을 이용한 고속 EMU의 고장 예측 방법 연구 및 적용)

  • Wang, Haitao;Min, Byung-Won
    • Journal of Internet of Things and Convergence
    • /
    • v.8 no.6
    • /
    • pp.55-63
    • /
    • 2022
  • In recent years, with the rapid development of large and medium-sized urban rail transit in China, the total operating mileage of high-speed railway and the total number of EMUs(Electric Multiple Units) are rising. The system complexity of high-speed EMU is constantly increasing, which puts forward higher requirements for the safety of equipment and the efficiency of maintenance.At present, the maintenance mode of high-speed EMU in China still adopts the post maintenance method based on planned maintenance and fault maintenance, which leads to insufficient or excessive maintenance, reduces the efficiency of equipment fault handling, and increases the maintenance cost. Based on the intelligent operation and maintenance technology of PHM(prognostics and health management). This thesis builds an integrated PHM platform of "vehicle system-communication system-ground system" by integrating multi-source heterogeneous data of different scenarios of high-speed EMU, and combines the equipment fault mechanism with artificial intelligence algorithms to build a fault prediction model for traction motors of high-speed EMU.Reliable fault prediction and accurate maintenance shall be carried out in advance to ensure safe and efficient operation of high-speed EMU.