Journal of the Korean Professional Engineers Association
/
v.19
no.2
/
pp.21-25
/
1986
Structure-borne noise due to forced vibration which is originated from subway operation and transmitted to buildings in order of rail-wood tie-concrete bed-structure-soil-building foundations-members of building results in social problem of environmental pollution. Moreover this becomes a serious problem because of the increment of surface traffic and subway operation made by meeting traffic system in crowded cities. Since subway is constructed along the principal road or through the residential area and as the worst case may be, building foundations is contact with top part of subway structure, it is possible that vibration resonance results in fatal damage of buildings. And, structure-borne vibration noise due to subway operation at late and early hours have the residents suffer from insonmia, restlessness and so on. Therefore, to satisfy the future need concerning the environmental protection, this report deals with the influence of structure-borne vibration noise on the basis of the characteristics of Seoul Subway System.
Pantograph sliding plate abrasion auto-detect system, one of the electric rail car auto-detecting devices, is a system that decides how much abrasion and when to replace without an inspector physically looking at the abrasion on the wet plate using machine vision, a cutting-edge technology. This paper covers the cause of deteriorating reliability that affects pantograph wet plate edge detection doe to noise added to the video when it rains. In order to remove such noise, problems should be checked through Smoothing, Averaging mask and Median filter using filtering technique and stable edge detection without being affected by noise should be induced in video measurement used in machine vision technology.
The Transactions of the Korean Institute of Electrical Engineers
/
v.45
no.3
/
pp.451-455
/
1996
This paper specified the measurement results conducted by the Korea Electric Power Research Institute (KEPRI) 765kV double circuit transmission test line that measured the audible noise, hum noise, radio interference, electric field and aeolian measurement. This test line consists of 6-480mm$^{2}$ conductors per phase. The analysis of the test results shows that this 6-Rail conductor bundle satisfies the audible noise criterion under the stable rainy weather condition and the radio interference level under the fair weather. And the other items are also agreed with the design level criterion. (author). 9 refs., 7 figs., 2 tabs.
In the past decades, complain about ground vibration and noise induced by pile driving has been quickly increased. Because of that, auger drilled piling methods have frequently used specially in urban area. However, the present auger drilled piling methods induce inevitable ground disturbance as well as a certain degree of vibration and noise due to the final hammering. For these reasons, a new auger drilled piling method is required to be developed. This paper introduces PDT(Pulse Discharge Technology) piling method and presents the characteristics of bearing capacity. The PDT piling method is to install in-situ piles using electric power so called Pulse. The pile installed by PDT appears to be able to develop shaft and end bearing capacity efficiently. This paper introduces PDT(Pulse Discharge Technology) piling method, which is the 512nd new construction technology. The PDT piling method is to install in-situ piles using electrical power so called Pulse power. The pulse power is physical value that indicates the energy change per unit time(dE/dt). Since the pulse power is to push ground, using the pulse power is enable a hole to be expanded as well as the ground to be improved by compaction. Therefore, The pile installed by PDT appears to be able to develop shaft and end bearing capacity efficiently. In this study, couples of pile loading tests were carried out to figure out whether or not the PDT piling method is applicable to constructions like rail road facility. As a result, it was concluded that the PDT piling technique meet the requirements for such a rail road related construction.
Jeong, Wootae;Jeon, Seungwoo;Jeong, Dahae;Choi, Han Shin
Journal of the Korean Society for Railway
/
v.20
no.4
/
pp.440-447
/
2017
Spectrum level for the acoustic roughness of wheels and rail surface should be periodically maintained under the limitation of ISO to reduce rolling noise of railway vehicles. Thus, in maintaining railway track, displacement sensor-based measuring devices are broadly used to measure the surface roughness and to perform spectral analysis. However, these measuring devices cause unexpected measuring errors since the displacement sensors are fixed at moving platforms and the main frame produces pitching motion during measurement. To increase the accuracy of the measured values, this paper has investigated the effects of design variables such as wheel base, additional wheels, and elastic deformation of wheels on the surface roughness and acoustic roughness spectrum.
Recently, the number of passengers using urban railway has been increased by reasons of the reductions of car use due to high fuel prices and the enlightenment about the environment. Above all, the noise and the vibration coming from the friction between the wheel and the rail of trains in operation which is not only a factor that hinders riding comforts but causes civil complaints. Furthermore, the noise has become social issues from tightening the relevant regulations by the government since January 2010. Although ballasted tracks were constructed on urban railways at the time of opening, they have been changed into slab tracks because slab tracks require much less maintenance. However, in view of sound absorptivity of track, slab tracks have 10 times less capability than ballasted tracks(ballasted track : 0.5~0.6/slab tracks : 0.06) results more noise than that of ballasted tracks as much as 3dB(A) since slab tracks emit more reflection noise. Therefore, in order to minimize reflection noise on slab tracks, noise abatement system has been developed as a national R&D program to apply on-site test. It is assumed that the construction technology developed in this study can be used not only as basic data for the on-site test for the noise reduction in urban railway but as an efficient construction method.
Roll forming process is one of the most widely used processes in the world for forming metals such as a furniture drawer guide or an up and down slide guide. It can manufacture goods of the uniform cross section on a large scale throughout the continuous processing. In the domestic design and manufacture, roll forming process for production is taking most of the method of 2-point under rail slide. However, this method is vulnerable to the structural strength and stiffness is not suitable for high load conditions. Therefore, through systematic study of high load, low noise 3-point ball type of under rail slide its own design and manufacturing technology is the need to build. In this paper, to make center member of 3-point ball-type under rail slide for the refrigerator doors, the roll forming modeling and simulation are performed. Tensile test is performed about SCP-1 1/2H for determine the mechanical properties of materials. Modeling and simulation of roll forming is used MSC.MARC software of a dedicated analysis program used by rigid plastic finite element method. Interference between the roll and the final shape are predicted from the results of the simulation.
Journal of the Korea institute for structural maintenance and inspection
/
v.14
no.4
/
pp.86-93
/
2010
The wear of railway track affects loss of rough ride, noise or vibration of train and traveling safety. Moreover as the track is worn away, this promotes destruction of structural mechanism of rail track which can bring about increasing of rail track maintenance cost drastically. For this reason, it is very important and interested research subject to design railway track structure and to analyse train movement mechanism based on systematic analysis of the reasons causing rail wear possible in real field. In this research, for the efficient maintenance, Life Cycle Performance of rail track and maintenance characteristics are computed considering some track components such as track type, contracting type, sleeper type and roadbed type. Time - Wear probabilistic distribution relationship as well as multiple regression analysis based on time, curvature and wear data are computed to predict the service life remainder of railway track and to be adapted to safety assessment.
Kim, Jae-chul;Kim, Kwanju;Lee, Junheon;Kim, Jiyong
Journal of the Korean Society for Railway
/
v.20
no.2
/
pp.165-172
/
2017
High frequency squeal noise can be generated when a railroad vehicle runs a sharp curved section; this noise causes environmental complaints and excessive wear on the wheel and the railroad track. In this paper, curved squeal noise experiments on a commercial railway were carried out to investigate this phenomenon. The relationship of the squeal noise pressure level, the frequency characteristics, the railway running speed, and the modal behavior of the wheel were investigated. At the same time, the lateral motion of the wheel relative to the rail was captured using a video camera; wheel movement was calculated when the noise was generated. queal noise occurred at the highest level at the inner front wheel; this phenomena is considered to be related to the lateral vibration response characteristics of the wheel. It can be seen that the magnitude of this squeal noise is not directly related to the increase in vehicle speed.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2006.11a
/
pp.747-750
/
2006
A turnout which permits trains to pass from one track to another has a disconnecting rail component, namely a crossing, so that noise and vibration arc occurred abruptly when train is passing through it. In Korea, it is planned to adopt the high speed tilting train, which operates at the speed of 180 km/h, at the conventional line. However, for application of the tilting train, it is prerequisite to establish the stable turnout system allowing the tilting train to pass through it without reducing speed. This study was performed to evaluate noise and vibration emitted from the prototype turnout which is developed for speed-up of the conventional line. For the purpose, noise and vibration were measured at near the conventional turnout and the improved one, which is constructed at Waegwan station and Kumi station of Gyeongbu line, respectively.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.