• Title/Summary/Keyword: Rail Capacity

Search Result 172, Processing Time 0.029 seconds

A Study on Behavior of Concrete Slab Track subjected to High Speed Train Loads (고속열차하중을 받는 슬래브궤도의 동적거동에 관한 연구)

  • 조병완
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2000.04a
    • /
    • pp.485-492
    • /
    • 2000
  • In the rail facilities the rail track consists of rail tie fastening accessories and bed,. The rail track is largely divided into Ballast Bed Track(BBT) and Concrete Bed Track(CBT) according to the type of bed. In this thesis among Concrete Bed Track slab track which is used for the Japanese high speed railway is a target of this study. Dynamic analysis by using finite element method are performed. where moving rain load is periodic function. Then through parametric study some conclusions are obtained as follow. Cement Asphalt Mortar(CAM) affects contrary mechanical behavior to rail and slab greatly. Therefore change of CAM spring coefficient should be handled with care, For slab thickness thin slab is more profitable to reduction of vibration of rail than thick one but mechanical capacity of slab is deteriorated, Improved structural type is proposed then structural analysis is performed for this one. This type is effective to reduction of vibration of railway system.

  • PDF

Discussion On the Strategy for the Rail Transportation Recently Developed in Shanghai

  • Tan, Fuxing;Zhang, Quanfu;Weng, Meng-Xing
    • Proceedings of the KOR-KST Conference
    • /
    • 1996.06a
    • /
    • pp.131-137
    • /
    • 1996
  • This paper discusses the necessity, strategy and objectives of the rail transportation recently developed in Shanghai. The objective should not be regarded just as a term project, but should be taken as an urgent mission with the 21st century, Shanghai should possess a network of about 100km of rail transport lines. To this end, the following measures are suggested : grade separation of all lines on elevated structures ; developing the rail car industries ; full utilization of all available transportation facilities ; optimizing the use of the space resources of highways ; bringing into play the initiatives of all parties concerned. Recently, it has become a popular consensus that the development of high-speed, safe, punctual, comfortable, non-pollution rail transport with large capacity is the best and only solution to Shanghai urban transportation. In this respect, this dissertation deals with the development strategy for current Shanghai rail construction, together with the infractructure in Shanghai, positioning the developing target; meanwhile, some proposals and solutions to hit this target will be put forward for the reference of leaders and experts.

  • PDF

Performance Verification of FRP Decks by Connection between Bridge Rail and FRP Decks (방호울타리 연결방법에 의한 FRP바닥판의 거동특성)

  • Lee, Young-Ho;Jeong, Jin-Woo;Youm, Kwang-Soo;Park, Ki-Tae;Hwang, Yoon-Koog
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05a
    • /
    • pp.134-137
    • /
    • 2006
  • In this paper, performance verification of connection between bridge rail and FRP decks are performed by static test. Also, the effect of flexible bridge rail failure to behavior of FRP deck are examined. Commercial products of flexible bridge rail are applied to test specimen, and 6 types of FRP deck-to-bridge rail connection system are considered. By the test results, 6 types of connection system by the connection method have similar structural capacity and have enough safety margin. Therefore, it is determined that 6 kinds of bridge rail considered in this study can be applied to bridge effectively by the cases of bridge field condition.

  • PDF

The Design of Supporter to Prevent Overclamping in Wedge Type Rail clamp (쐐기형 레일클램프의 과클램핑 방지를 위한 지지장치 설계)

  • 한근조;안찬우;전영환;심재준;한동섭;김병진
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.1446-1449
    • /
    • 2003
  • In this study we analyze operation principle of wedge type rail clamp using in the harbor and when wind force applies to container crane, we calculate deformation in each part of rail clamp. As a result of calculation, we will design rail clamp supporter that forbid overload to be applied at rail clamp according to adjust climbing wedge distance of roller. It would be adapted various container capacity and wind velocity.

  • PDF

A Study on Behavior of Concrete Slab Track subjected to High Speed Train Loads (고속열차하중을 받는 슬래브궤도의 동적거동에 관한 연구)

  • 조병완;김영진;허민회;정태호
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.493-598
    • /
    • 2000
  • In the rail facilities, the rail track consists of rail, tie, fastening, accessories and bed. The rail track is largely divided into Ballast Bed Track (BBT) and Concrete Bed Track (CBT) according to the type of bed. In this thesis, among Concrete Bed Track, slab track, which is used for the Japanese high speed railway, is a target of this study. Dynamic analysis by using finite element method are performed where moving train load is periodic function. Then through parametric study, some conclusions are obtained as follows. Cement Asphalt Mortar (CAM) affects contrary mechanical behavior to rail and slab greatly. Therefore, change of CAM spring coefficient should be handled with care. For slab thickness, thin slab is more profitable to reduction of vibration of rail than thick one but mechanical capacity of slab is deteriorated. Improved structural type is proposed, then structural analysis is performed for this one. This type is effective to reduction of vibration of railway system.

  • PDF

A Study on the Development Strategies for the Light Rail Transit Industry (경전철 산업 활성화 및 발전 방안에 관한 연구)

  • Chung Kyung-Ryul;Yoon Se-Kyun;Choi Yong-Hoon
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.1 s.32
    • /
    • pp.95-101
    • /
    • 2006
  • Light rail transit system has many characteristics of better accessibility, frequency service, low construction cost, reduced air pollution and medium-capacity public transport etc. Light rail transit system as a urban transportation system has been growing worldwide since the late 20th century. More than 300 cities around the world have light railway systems. Many medium-size cities in domestic site is planning the construction of light railway. This paper describes the development strategies for the light rail transit industry.

Study on the Wedge Angle of Wedge Type Rail Clamp for Container Crane (컨테이너 크레인용 쐐기형 레일 클램프의 쐐기각에 대한연구)

  • Han, Geun-Jo;Lee, Ho;Sim, Jae-Jun;Han, Dong-Sub;An, Chan-Woo;Jeon, Young-Hwan
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.21 no.9
    • /
    • pp.119-126
    • /
    • 2004
  • In this paper, we design a wedge type rail clamp which can protect container crane from a sudden strong blast with constant clamping force regardless of the operating period. When we design wedge type rail clamp, it is important to determine the angle of wedge and analyze a contact condition of roller and wedge so that we might develop a wedge type rail clamp for parking devices of port cargo working system with variable capacity. Therefore, this paper suggests a process to decide wedge angles within feasible range which could be obtained using load analysis and FEA of wedge type rail clamp

A Study on Track Design Criteria of Light Rail Transit System (경량전철 선로설계기준에 관한 연구)

  • Lee, An-Ho;Lee, Duck-Young
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.135-140
    • /
    • 2003
  • Recently Light Rail Transit(LRT) systems, especially full automatic systems are strongly issued by many provinces and major cities due to it's own characteristic for economical, environmental and sufficient transportation capacity. But LRT design criteria should be modified according to Rolling Stock's properties. -size, arrangement of bogie and wheel, power of traction motor etc, This thesis suggest for basic standard design criteria of Rubber Tired Light Rail Transit system.

  • PDF

A Study on Robustness Analysis Model for Calculating Line Capacity in Railroad System (철도선로용량 계산을 위한 강인성 분석모형에 관한 연구)

  • Lee, Chang-Ho;Kim, Bong-Sun;Kim, Hak-Sik;Lee, Byung-Kwon;Kim, Dong-Hee;Hong, Sun-Hm
    • IE interfaces
    • /
    • v.16 no.spc
    • /
    • pp.111-115
    • /
    • 2003
  • Railroad system is consisted of resources of rail track, signal system, and vehicles. Railway operation must use these limited resources and maximize resource utilization. Line capacity(number of trains throughput/day) is determined by such as parameters, line utilization rate($\alpha$), dummy rate for the break-through hour($\beta$), and dummy rate for the number of rail track intervals($\delta$). Line capacity simulation(LCS) determined the line capacity through simulation given $\alpha$, $\beta$, and $\delta$. This paper deals with the development of parameter evaluation simulation(PES). PES presents the decision maker with the relationship of line capacity and measurement of robustness for various scenarios in different parameters and then the decision maker can determine the appropriate parameters.

Design of the Various Capacity Wedge-type Rail Clamp for a Quay crane According to the Design Wind Speed Criteria Change (설계 풍속 상향 조정에 따른 Quay crane용 제용량 쐐기형 레일 클램프 설계)

  • Lee J.M.;Han G.J.;Shim J.J.;Han D.S.;Lee S.W.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.06a
    • /
    • pp.1626-1629
    • /
    • 2005
  • Recently many countries have concentrated their effort on the port automation, in order to be the Hub-port, that the Ultra Large Container Ship could come alongside the Quay, in their region. As the magnitude of the container ship increase, that of the Quay crane increases from 50ton-class to 61ton-class more and more. The wind speed criteria to design the structures used in the port was upgraded from 20m/s to 40m/s due to change of the weather condition. Our laboratory could have the ability to design the wedge type rail clamp for 50ton-class Quay crane in 30m/s wind speed. Accordingly we analyzed the load condition of the Quay crane about 40m/s wind speed upgraded from 20m/s and designed the wedge type rail clamp for 50ton and 61ton-class Quay crane.

  • PDF