• Title/Summary/Keyword: REQUIRED-TIME

Search Result 11,654, Processing Time 0.036 seconds

Estimating the Physical Demand of Waterproofing Worker

  • Lim, Tae-Kyung;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.101-103
    • /
    • 2015
  • Scientific methods that measure the physical demand requirements of a construction operation have not been arrived at maturity in construction community. It is attributed to the difficulty involved in performing controlled experiments on the operation and its' volatile jobsite environment. This paper presents a method that measures the physical demand requirement of the waterproofing activity and verifies the differences between various operations (e.g., a primer painting and a polyurethane coating) consisting of the activity. Two hypotheses, which are involved in the operations, are summarized as follows: [Hypothesis 1] when one performs the same amount of work; the one's average heart rate required for the polyurethane coating operation is higher than that required for the primer painting operation. [Hypothesis 2] when one performs the same amount of work, the one's break time required for the polyurethane coating operation is longer than that required for the primer painting operation.

  • PDF

Conventional and digital impressions for complete-arch implant-supported fixed prostheses: time, implant quantity effect and patient satisfaction

  • Pereira, Ana Larisse Carneiro;Medeiros, Vitoria Ramos;Campos, Maria de Fatima Trindade Pinto;Medeiros, Annie Karoline Bezerra de;Yilmaz, Burak;Carreiro, Adriana da Fonte Porto
    • The Journal of Advanced Prosthodontics
    • /
    • v.14 no.4
    • /
    • pp.212-222
    • /
    • 2022
  • PURPOSE. To evaluate and compare the effect of impression type (conventional vs digital) and the number of implants on the time from the impressions to the generation of working casts of mandibular implant-supported fixed completearch frameworks, as well as on patient satisfaction. MATERIALS AND METHODS. 17 participants, 3 or 4 implants, received 2 types of digital impression methods (DI) and conventional (CI). In DI, two techniques were performed: scanning with the scan bodies (SC) and scanning with a device attached to the scan bodies (SD) (BR 10 2019 026265 6). In CI, the making of a solid index (SI) and open-tray impression (OT) were used. The outcomes were used to evaluate the time and the participant satisfaction with conventional and digital impressions. The time was evaluated through the timing of the time obtained in the workflow in the conventional and digital impression. The effect of the number of implants on time was also assessed. Satisfaction was assessed through a questionnaire based on seven. The Wilcoxon test used to identify the statistical difference between the groups in terms of time. The Mann-Whitney test was used to analyze the relationship between the time and the number of implants. Fisher's test was used to assess the patient satisfaction (P<.05). RESULTS. The time with DI was shorter than with CI (DI, $\tilde{x}=02:58$; CI, $\tilde{x}=31:48$) (P<.0001). The arches rehabilitated with 3 implants required shorter digital impression time (3: $\tilde{x}=05:36$; 4: $\tilde{x}=09:16$) (P<.0001). Regarding satisfaction, the DI was more comfortable and pain-free than the CI (P<.005). CONCLUSION. Digital impressions required shorter chair time and had higher patient acceptance than conventional impressions.

Test of Independence in a Markov Dependent Waiting-time Distribution

  • Bai, Do-Sun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.1 no.1
    • /
    • pp.99-103
    • /
    • 1975
  • A procedure for the test of independence of the observations and the null distribution are studied for a waiting-time distribution of the number of Bernoulli trials required to obtain a preassigned number of successes under Markov dependence. Selected critical values for the test statistic are tabulated.

  • PDF

Factors Affecting the Length of Time to College Students' Employment (대학생 취업 소요기간에 영향을 미치는 요인 분석)

  • Kim, Min-Seok;An, Eun-Bi;Yu, Gyeong-Suk;Jeong, Hyo-Sook
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.8
    • /
    • pp.27-35
    • /
    • 2018
  • The purpose of this study is to analyze the effects of personal characteristics, characteristics of college, and educational experience at college on the length of employment and length of employment for regular college students. As a result, it was found that the length of employment required for social studies, education, engineering, and medicine major was shorter than that of major in humanities. Also, it was confirmed that the longer the time required for the job, the more the male and the university graduate in the metropolitan area. In this analysis, it was confirmed that the length of time required for employment could be explained more by individual characteristics than the characteristics of college, and educational experience at college. Based on the analysis results, differentiated support for each major and the necessity of supporting programs tailored to the needs of students respectively.

Time Switching-based Analog Network Coding for Maximizing the Minimum Required Secrecy Capacity in Energy Harvesting Networks (에너지 하베스팅 네트워크에서 최소 요구 보안 용량을 최대화하기 위한 시간 전환 기반의 아날로그 네트워크 코딩)

  • Lee, Kisong;Choi, Hyun-Ho
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.21 no.11
    • /
    • pp.2022-2028
    • /
    • 2017
  • Recently, the energy shortage of sensors and the leakage of private information are considered as serious problems as the number of sensors is increasing due to the technological advance in Internet-of-Things. RF energy harvesting, in which sensors collect energy from external RF signals, and physical layer security become increasingly important to solve these problems. In this paper, we propose a time switching-based network analog coding for improving information security in wireless networks where the relay can harvest energy from source signals. We formulate 2-hop relay networks where an eavesdropper tries to overhear source signals, and find an optimal time switching ratio for maximizing the minimum required secrecy capacity using mathematical analysis. Through simulations under various environments, it is shown that the proposed scheme improves the minimum required secrecy capacity significantly, compared to the conventional scheme.

Analysis of the Optimized Sewing Speed for the Sewing Operation Standardization in the Garment Manufactures (의류 제품의 봉제작업 표준화를 위한 최적 봉제시간 연구)

  • 김선희
    • Journal of the Korean Society of Costume
    • /
    • v.53 no.7
    • /
    • pp.139-146
    • /
    • 2003
  • This study was aimed at analyzing a characteristics of the sewing machines and analyzing the effective sewing time in the garment manufacture process, therefore to obtain the basic data concerned with the sewing. operation standardization. The two methods were experimented. First, two garment factories established in Seoul and Geonggi province were randomly selected for the analyzing the sewing speed of the sewing operator for the optimized sewing speed using the equipment of Digital Tachometer HT4100. Second, five garment factories established in Seoul and Geonggi province were randomly selected to analyze the required time data to reach the fixed sewing speed using the lock stitch sewing machine which was used in the sewing factories. The results are divided into 3 categories as follows; 1) Survey results for the optimized sewing speed : The sewing operations of 10~20 cm range were most frequently selected in seam constructions in Korean sewing factories, and the sewing speed of 2,500 R.P.M was most used; 2) Required time to reach the fixed sewing speed using the lock stitch sewing machine : The mean of required time to the fixed sewing speed of 2.500 R.P.M was 3.5 second, and the mean of the real-sewing length during the 3.5 second was 43.8 cm ; 3) Analysis of the optimized sewing speed calculated using these results : The optimized sewing speed for the sewing manufacturers of the upward of 43.8 cm was 2,500 R.P.M. and for the sewing manufacturers of the below of 42.2 cm, the optimized sewing speed was 2.450 R.P.M.

Buyers' Payment of Price by Letters of Credit under CISG (국제물품매매협약상 매수인의 신용장에 의한 대금지급)

  • Heo, Hai-Kwan
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.41
    • /
    • pp.103-132
    • /
    • 2009
  • In international sales of goods, the buyer must pay the price for the goods as required by the contract and CISG, The buyer's this obligation includes taking such steps and complying with such formalities as may be required under the contract, which includes providing the seller with relevant letter of credit through the issuing bank. Where the parties have not stipulated the time limit within which the credit should be opened, but there is an agreed date or period for shipment, the time limit for the L/C opening should be calculated back from the agreed date of shipment or the first date of shipment, while, in addition, the buyer should open the L/C sufficiently earlier than the shipment date in order for the seller to be able to know the L/C's opening before beginning to ship the goods. The L/C provided the buyer should conform to the contract of sale. Therefore, for example, when an unconfirmed L/C is provided violating the agreement or the L/C opened states that, under a FOB contract, a "freght prepaid" bill of lading shall be presented as a required document of the L/C, the buyer has failed to perform his obligation. If the buyer fails to perform his obligations to provide the letter of credit, the seller may require the buyer to perform that obligation; may fix an additional period of time of reasonable length for performance of the obligation; or, the seller may declare the contract avoided, if the failure amounts to a fundamental breach of contract, or if the buyer does not, within the additional period of time fixed by the seller, perform the obligation; and the seller claim damages. However, when a relevant L/C has been issued for the seller, as a rule, he cannot ask directly for the buyer to pay the price before avail himself of the L/C first.

  • PDF

Development of Gridding Robot System for Genome Research (유전체 연구용 그리딩 로봇 시스템의 개발)

  • 추창환;서동현;김찬수;박지영;임용표;김기대
    • Journal of Biosystems Engineering
    • /
    • v.26 no.4
    • /
    • pp.391-398
    • /
    • 2001
  • A robot system for clone replication and gridding, which is a preliminary state of the genome research, was developed and evaluated its performance. This gridding robot system consisted of 1) a gridding heat that replicated the clone, 2) a manipulator, as a part of body of robot, which transferred the gridding head along x-, y-, z-axis, 3) a well plate arranging board, 4) a sterilization unit, and 5) a control unit. Performance of the system was evaluated with 1) repeatability of the robot system, 2) clone replication efficiency, 3) time requirement of the replication, and 4) sterilization efficiency. The repeatability error of the robot system showed 0.219 mm and 0.094 mm in the direction of x- and y-axis, respectively. The success rate of the clone replication with the gridding head was 100% on the membrane filter. The time required for the replication was four minutes and fifty-five seconds from the four 96 well plates to a 384 well plate meanwhile the required time with well experienced hand labor was three minutes thirty-five seconds. The gridding operation of clone could not be done by hand labor and the required time with robot system for the gridding on the membrance filter with the control program 5$\times$5: 1 copy and 384 gridding pins was twenty minutes and twenty-five seconds. The efficiency of the sterilization was considered to be satisfactory since no growth of fungi was found around the area of replication in the membrane filter.

  • PDF

Time-Lapse Live-Cell Imaging Reveals Dual Function of Oseg4, Drosophila WDR35, in Ciliary Protein Trafficking

  • Lee, Nayoung;Park, Jina;Bae, Yong Chul;Lee, Jung Ho;Kim, Chul Hoon;Moon, Seok Jun
    • Molecules and Cells
    • /
    • v.41 no.7
    • /
    • pp.676-683
    • /
    • 2018
  • Cilia are highly specialized antennae-like organelles that extend from the cell surface and act as cell signaling hubs. Intraflagellar transport (IFT) is a specialized form of intracellular protein trafficking that is required for the assembly and maintenance of cilia. Because cilia are so important, mutations in several IFT components lead to human disease. Thus, clarifying the molecular functions of the IFT proteins is a high priority in cilia biology. Live imaging in various species and cellular preparations has proven to be an important technique in both the discovery of IFT and the mechanisms by which it functions. Live imaging of Drosophila cilia, however, has not yet been reported. Here, we have visualized the movement of IFT in Drosophila cilia using time-lapse live imaging for the first time. We found that NOMPB-GFP (IFT88) moves according to distinct parameters depending on the ciliary segment. NOMPB-GFP moves at a similar speed in proximal and distal cilia toward the tip (${\sim}0.45{\mu}m/s$). As it returns to the ciliary base, however, NOMPB-GFP moves at ${\sim}0.12{\mu}m/s$ in distal cilia, accelerating to ${\sim}0.70{\mu}m/s$ in proximal cilia. Furthermore, while live imaging NOMPB-GFP, we observed one of the IFT proteins required for retrograde movement, Oseg4 (WDR35), is also required for anterograde movement in distal cilia. We anticipate our time-lapse live imaging analysis technique in Drosophila cilia will be a good starting point for a more sophisticated analysis of IFT and its molecular mechanisms.