• Title/Summary/Keyword: RCS 충전

Search Result 4, Processing Time 0.018 seconds

Development of the Gas Charging Simulator for Reaction Control System of KSLV-I (KSLV-I RCS 충전모사 시스템 개발)

  • Jeon, Sang-Woon;Jung, Seul;Kim, Ji-Hun
    • Aerospace Engineering and Technology
    • /
    • v.8 no.2
    • /
    • pp.122-126
    • /
    • 2009
  • KSLV(Korea Space Launch Vehicle)-I is designed as a launch vehicle to enter a 100 kg-class satellite to the LEO(Low-Earth Orbit). Attitude angles of the upper-stage, including roll, pitch and yaw are controlled by cold gas thruster system using nitrogen gas. To verify the flow rate of the gas charging system and to prepare a nitrogen gas charging scenario, the development of a gas charging simulator for RCS(Reaction Control System) is required. This paper describes the orifice design, development, and test of the gas charging simulator for RCS of KSLV-I.

  • PDF

Development and Operations of LV PACS-II for the Launch Vehicle NARO (나로호 상단 발사관제시스템 개발 및 발사운용 결과)

  • Seo, Jin-Ho;Yoon, Won-Ju;Kim, Kwang-Soo;Lee, Soo-Jin;Chung, Eui-Seung
    • Aerospace Engineering and Technology
    • /
    • v.11 no.1
    • /
    • pp.135-144
    • /
    • 2012
  • The NARO is South Korea's first carrier launch vehicle, which made its flights from NARO Space Center on 25 August 2009 and 10 June 2010. LV PACS(Preparation Automated Control System) is a electrical ground support system to monitor and control the integrated launch vehicle during the launch preparation and operation in Launch Complex. As a subsystem of LV PACS, LV PACS-II was developed for launch preparation and operation of the NARO upper stage, and all the functions and requirements were verified successfully through NARO flight tests. In this paper the core technology and characteristics applied to LV PACS-II are described.

Evaluation of Shear Bond Strength and Microleakage of Bulk-fill Resin Composites (Bulk-fill 복합레진의 상아질 전단결합강도 및 미세누출)

  • Lee, Hanbyeol;Seo, Hyunwoo;Lee, Juhyun;Park, Howon
    • Journal of the korean academy of Pediatric Dentistry
    • /
    • v.42 no.4
    • /
    • pp.281-290
    • /
    • 2015
  • The aim of this study was to evaluate shear bond strength (SBS) of bulk-fill resin composites (RCs) to dentin and their micro-leakage. One high-viscosity bulk-fill RC and 2 low-viscosity bulk-fill RCs were compared with 1 conventional RC. 7thgenerationbondingagentswereused. In order to evaluate SBS values, 40 permanent molars were selected and divided into 4 groups. The bulk-fill RCs were applied in 4 mm thickness, whereas the conventional RC was applied in 2 mm thickness. In order to evaluate micro-leakage, class I cavities ($5{\times}2{\times}4mm$) were prepared in 32 permanent molars. The teeth were divided into 4 groups and restored with resin composites in an increment of 4 mm for the bulk-fill RC and in 2 horizontal increments of 2 mm for the conventional RC. The mean SBS value of conventional RC showed no statistically significant difference when compared with those of low-viscosity bulk-fill RCs. However, the mean SBS value of high-viscosity bulk-fill RC was significantly lower than that of conventional RC (p < 0.05). There were no statistically significant differences in micro-leakage between the 4 groups. For SBS and micro-leakage, the use of low-viscosity bulk-fill RCs might help clinicians simplify the procedure.

An Experimental Study on Concrete Filled Steel Tube Column of Mock-up test take advantage of the High Strength Concerete(over the 80MPa) (초고강도 콘크리트(800kgf/$\textrm{cm}^2$ 이상)를 이용한 콘크리트충전 강관기둥에 대한 실물대 실험)

  • 이장환;공민호;전판근;정근호;이영도;정상진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.21-25
    • /
    • 2004
  • The column for Steel Framed Reinforced Concrete Structure (SFRCS) and the column for Reinforced Concrete Structure (RCS) could be the most common building structure. The increasing of the need for massive space hasaffected the size of building components for supporting the massive structure. However, the changing of components size makes inefficient space of building. Hence, to meet the need for acquiring efficient space comparing the budget and cost the new structure method, Concrete Filled Tube Steel (CFT), was developed. CFT is the structure for which steel tube instead of other materials such as wood for holding concrete is used. The most benefit of this one is to help in reducing the size of the building components and local buckling because of tube steel holding concrete. For this reason, this research will examine the probability of applying CFT on construction sites by using the concrete (800kgf/$\textrm{cm}^2$) especially for CFT through the data from the real size mock-up.

  • PDF