• Title/Summary/Keyword: RBI(Risk Based Inspection)

Search Result 47, Processing Time 0.034 seconds

Risk Assessment of Petrochemical Equipments Using Enhanced RBI Technique (개선된 RBI 기법을 이용한 석유화학설비의 위험도평가)

  • Lee Sang-Min;Song Ki-Hun;Chang Yoon-Suk;Choi Jae-Boong;Kim Young-Jin;Han Sang-In;Choi Song-Chun
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.29 no.10 s.241
    • /
    • pp.1392-1398
    • /
    • 2005
  • API 581 guideline provides a methodology for calculating the risks of equipments in refinery or petrochemical plant. However, especially in part of the consequence of failure, there is a major limitation of its application to the petrochemical plant directly since only a representative material is considered in calculating the risk while the equipment is composed of numerous materials. The objectives of this paper are to propose an enhanced risk-based inspection (RBI) technique to resolve shortcomings inclusive of the above issue and to assess the risks of typical petrochemical equipments. In this respect, a program incorporating material database was developed to fully incorporate the characteristics of different materials. The proposed RBI program consists of qualitative, semi-quantitative and quantitative risk evaluation modules in which toxic materials as well as representative materials were selected automatically for comparison to those in the current guideline. It has been applied to assess the risks of equipments in ethylene facilities of petrochemical plants. Thereby, more realistic evaluation results were obtained and applicability of the proposed RBI program was proven.

A Quantitative Risk Analysis of Related to Tower Crane Using the FMEA (타워크레인의 정량적 위험성 평가가법에 관한 연구(FMEA 기법 위주))

  • Shim, Kyu-Hyung;Rie, Dong-Ho
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.34-39
    • /
    • 2010
  • The purpose of this study is to suggest objective evaluation model as a plan to utilize as opportunity in establishing judgment standard of mutual inspection criteria and to upgrade inspection ability by reviewing and analyzing level of danger and importance in advance based on inspection results of inspection institutions regarding tower cranes used in construction fields. Tower crane is a mechanical device transporting construction supplies and heavy materials to places over 20~150M high from the ground for the period ranging from a short time of 2~3 months to two years after being installed in construction sites in vicinity of buildings or structures and is an important facility indispensable for construction sites. However, since use period after installation is short and professional technical ability of technicians working on-site about of tower crane is poor, systematic and quantitative safety management is not carried out As a part of researches on procedure of RBI(Risk Based Inspection) possible to apply to Knowledge Based System based on knowledge and experiences of experts as well as to tower cranes for solving these problems, quantitative RPN(Risk Priority Number) was applied to RPN utilizing technique of FMEA(Failure Mode and Effect Analyses). When general RBI 80/20 Rule was applied parts with high level of risks were found out as wire rope, hoist up/down safety device, reduction gear, and etc. However, since there are still many insufficient parts as risk analyses of tower crane were not established, it is necessary for experts with sufficient experiences and knowledge to supplement active RBI techniques and continuous researches on tower cranes by sharing and setting up data base of important information with this study as a starting point.

Reduction Method for the Risk of the Chemical Facilities by KS-RBI Program Supporting the Quantitative Cause Analysis (정량적 원인분석이 가능한 위험기반검사(KS-RBI)에 의한 화학설비의 위험도 경감방안)

  • Kim, Tae-Ok;Lee, Hern-Chang;Jo, Ji-Hoon;Kim, Kyu-Jung;Kwon, Hyuck-Myun
    • Journal of the Korean Institute of Gas
    • /
    • v.12 no.2
    • /
    • pp.110-117
    • /
    • 2008
  • The risks of the chemical facilities were estimated by the KS-RBI(Ver. 3.0) program supporting the quantitative cause analysis, and reduction method for the risks of the facilities was investigated. As a result, we could find that the risks of the facilities decrease with reducing the likelihood of failure (LOF) affected by demage mechanism, inspection number and effectiveness of inspection, and with reducing the consequence of failure (COF) affected by the ratings of the detection, isolation, and mitigation systems. Furthermore, high risks of the facilities would be decreased by reduction of the LOF and the COF simultaneously. Accordingly, the applied plant would be able to achieve the decrease of inspection and labor costs because of the decrease of consequences and inspection intervals through the reduction of risks.

  • PDF

Qualitative RBI Analysis in Considered with Uncertain Variables by Probabilistic Distribution (확률분포에 따른 불확실한 변수를 고려한 위험도기반의 정성적 평가)

  • Heo, Ho-Jin;Jeong, Jae-Uk;Kim, Joo-Dong;Choi, Jae-Boong;Choi, Song-Chun;Hwang, In-Ju
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.25 no.2
    • /
    • pp.70-78
    • /
    • 2013
  • Plants which are having conditions of high temperature and pressure always are exposed to danger. In order to prevent unexpected accidents, safety management that can effectively and appropriately examine facilities is required in plant operation. RBI(Risk-Based Inspection) technology in API 581 is one of standard management technique for evaluating risk on petroleum plants. There are qualitative and quantitative assessments in RBI methodology. Quantitative evaluation step is complex and required much information, so high-risk facilities in plant are selected firstly by qualitative method. Qualitative RBI is performed by choosing the answer in prepared questionnaire. However, it is difficult to believe thoroughly results from survey including ambiguous information. In this study, the procedure of qualitative RBI analysis with considering probability distribution concept were proposed by using Monte Carlo simulation method in order to increase reliability in spite of uncertain factors. In addition, qualitative risk of cooling system for LNG plant was evaluated using proposed procedure. Although 20 items of total 39 assessment items are applied to uncertain factors, risk section of high probability(89%) were verified. The detailed results were described in manuscript.

Research on Risk-Based Piping Inspection Guideline System in the Petrochemical Industry

  • Tien, Shiaw-Wen;Hwang, Wen-Tsung;Tsai, Chih-Hung
    • International Journal of Quality Innovation
    • /
    • v.7 no.2
    • /
    • pp.97-124
    • /
    • 2006
  • The purpose of this research is to create an expert risk-based piping system inspection model. The proposed system includes a risk-based piping inspection system and a piping inspection guideline system. The research procedure consists of three parts: the risk-based inspection model, the risk-based piping inspection model, and the piping inspection guideline system model. In this research procedure, a field plant visit is conducted to collect the related domestic information (Taiwan) and foreign standards and regulations for creating a strategic risk-based piping inspection and analysis system in accordance with the piping damage characteristics in the petrochemical industry. In accordance with various piping damage models and damage positions, petrochemical plants provide the optimal piping inspection planning tool for efficient piping risk prediction for enhancing plant operation safety.

API-RBI BRD에 따른 RBI 소프트웨어의 개발

  • 송정수;김주호;이승재;최송천;김지윤;윤기봉
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2001.11a
    • /
    • pp.381-386
    • /
    • 2001
  • RBI(Risk-Based Inspection)는 각각의 설비별로 위험등급 또는 위험도를 산정하고 이에 따라 검사의 우선 순위, 방법, 주기 및 일정계획 등을 수립하여 기술적인 근거에 의해 종합적이고 체계적인 검사를 수행하는 것이다. 이와 같이 RBI는 위험도를 정성적/정량적으로 평가하여 위험의 대부분을 내포하고 있는 30% 내외의 소수의 설비를 찾아내어 이에 대해 최적의 방법으로 인적, 물적 자원을 집중적으로 투입함으로써 안전성 확보와 함께 경제성을 추구하는 효율적인 기법이라 할 수 있다.(중략)

  • PDF

Prediction of Maintenance Period of Equipment Through Risk Assessment of Thermal Power Plants (화력발전설비 위험도 평가를 통한 기기별 정비주기 예측)

  • Song, Gee Wook;Kim, Bum Shin;Choi, Woo Song;Park, Myung Soo
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.37 no.10
    • /
    • pp.1291-1296
    • /
    • 2013
  • Risk-based inspection (RBI) is a well-known method that is used to optimize inspection activities based on risk analysis in order to identify the high-risk components of major facilities such as power plants. RBI, when implemented and maintained properly, improves plant reliability and safety while reducing unplanned outages and repair costs. Risk is given by the product of the probability of failure (POF) and the consequence of failure (COF). A semi-quantitative method is generally used for risk assessment. Semi-quantitative risk assessment complements the low accuracy of qualitative risk assessment and the high expense and long calculation time of quantitative risk assessment. The first step of RBI is to identify important failure modes and causes in the equipment. Once these are defined, the POF and COF can be assessed for each failure. During POF and COF assessment, an effective inspection method and range can be easily found. In this paper, the calculation of the POF is improved for accurate risk assessment. A modified semi-quantitative risk assessment was carried out for boiler facilities of thermal power plants, and the next maintenance schedules for the equipment were decided.