• Title/Summary/Keyword: Quarry mine

Search Result 16, Processing Time 0.027 seconds

Promoting the Quarry Workers' Hazard Identification Through Formal and Informal Safety Training

  • Bae, Hwangbo;Simmons, Denise R.;Polmear, Madeline
    • Safety and Health at Work
    • /
    • v.12 no.3
    • /
    • pp.317-323
    • /
    • 2021
  • Background: The surface mining industry has one of the highest fatality rates among private industries in the United States. Despite recent decreases in the fatality rates of comparable industries, the fatality rate in the surface mining industry has increased. Meanwhile, a lack of safety research in surface mining has hindered efforts to improve safety strategies in the surface mining workplace. Method: This study examined quarry workers' hazard identification skills by conducting a case study of a surface mining facility in the Mid-Atlantic region of the United States. Semistructured interviews were conducted with eight quarry workers who were employed at the mine facility. In addition to the interviews, data were collected through field notes, notes from an expert meeting with safety managers, and site photographs to explore quarry workers' safety behaviors in the workplace. Results: The results showed that quarry workers identified hazards and improved their safety performance by translating safety knowledge learned from training into practice, acquiring hands-on work experience, learning from coworkers, and sharing responsibilities among team members. Conclusion: This study contributes to understanding quarry workers' safe performance beyond what they have learned in safety training to include their interaction with other workers and hand-on experience in the workplace. This study informs practitioners in the surface mining industry to build a safe work environment as they design effective safety programs for employees.

Environmental Contamination and Best Management of Stone-dust from Quarry Mine (석산개발에 따른 주변 환경오염 및 석분토 처리를 위한 연구)

  • Lee, Pyeong-Koo;Youm, Seung-Jun;Kang, Min-Ju
    • Economic and Environmental Geology
    • /
    • v.43 no.4
    • /
    • pp.315-332
    • /
    • 2010
  • All of the water and stone-dust samples with or without flocculant, in and around quarry mines, were analyzed for total concentrations of heavy metals, cyanide(CN), toxic organic compounds and organic phosphorus. Extraction experiments on stone-dust by EDTA and various pH solutions were also carried out, in order to evaluate the contaminant leaching from the long-term heaped stone-dust within quarry mines. The concentrations of $Cr^{6+}$, Hg, CN, TCE/PCE and total phosphorus in all samples (water and stone-dust) were under detection limits, confirming no environmental contamination from stone-dust in quarry mine areas. Lead and cadmium were not detected in all water samples. Copper and zinc were found in some water samples, and arsenic was detected in a few water samples. But they also showed levels much lower than the drinking water standard. Results of the extraction experiments by EDTA and pH solutions showed that Pb, Cr, Cd, Cu and Zn were leached out in less amounts or under detection limits. Arsenic was detected only at pH 3. From above results, we suggested that environmental contamination by quarry mine development is likely to be minor or negligible.

APPLICATION OF TELEVIEWER AND COLOR-CORESCANNER FOR THE ESTIMATION OF GNEISS STONE RESOURCES OF HADONG, KYEONGSANNAMDO PROVINCE (하동지역 편마암 석재의 품질 평가를 위한 텔레뷰어 및 칼라 코어스캐너의 응용)

  • Hyun, Hye-Ja;Kim, Jung-Yul
    • Journal of the Korean Geophysical Society
    • /
    • v.7 no.4
    • /
    • pp.255-267
    • /
    • 2004
  • Analysis of fracture system in a stone quarry mine is a critical importance in assessing the recoverable amounts of building stones as well as in establishing the systematic and efficient development plan. Rock formation comprising vein structure, degree of weathering, and compositon of minerals, is a critical factor of estimating the stone quality. The aim of this study is to provide desirable informations about both fracture pattern and rock formation by using Televiewer and Color-corescanner. Televiewer measurement were conducted at 7 boreholes in the gneiss quarry mine, Hadong, Kyeongsangnamdo province and the corresponding cores were scanned using Color-corescanner at the same place. In Televiewer images, all kinds of fractures were clearly observed and a better discrimination of stone quality can be identified. Meanwhile, the core images with high resolution (max. 20 pixels/mm) provided detailed informations on rock formation such as features of particles and fissures that can be nearly undetected by Televiewer.

  • PDF

Stability Analysis for Mine Openings by a Three Dimensional Boundary Element Method-BEAP3D (三次元 境界要素法 BEAP3D에 의한 採掘空洞 安定性 評價)

  • 정소걸;김임호;조영도
    • Tunnel and Underground Space
    • /
    • v.8 no.2
    • /
    • pp.118-129
    • /
    • 1998
  • A three dimensional boundary element method-BEAP3D was applied to the stability analysis of the mine openings not only to improve the stability during mining operations but also to serve the evaluation of the mine openings for further utilization. Stability analysis on the stability of the room-and-pillar stopes underneath of the old mine openings and the openings to be created by the newly proposed sublevel stoping method at the Nowhado Pyrophyllite Mine, showed that rock mass around the old and new stopes would be stable. Six stopes of a sublevel stoping designed for the Choongmu Limestone Quarry would be stable, too. A sublevel stoping method consisting of six stopes was similarly suggested for the Keumpyung Quartzite Mine. The stability can be guaranteed through out six stopes. Since mining starts from the bottom 1st sublevel to the uppermost sublevel, the safety of the stopes will improve together with the mining process. It would highly be recommended to investigate in-situ rock properties and the rock stresses for future studies. Even though the rock around the uppermost part and bottom of all the stopes have a very high factor of safety, spot reinforcements such as rock bolting would be recommended to mitigate the intermediate and minor principal stresses acting in a tensile mode.

  • PDF

Effects on Water Quality in the Development and the Comparative Analysis of Water Quality Results in Post-environmental Impact Investigation - Focused on a Quarry Mine and Sports Facilities - (개발 사업에 의한 수질영향조사 및 사후환경영향조사 수질결과에 대한 비교·분석 -토석채취사업 및 체육시설 조성사업을 중심으로-)

  • Lee, Seyong;Roh, Younghee;Cho, Hanna;Maeng, Junho
    • Journal of Environmental Impact Assessment
    • /
    • v.26 no.6
    • /
    • pp.524-537
    • /
    • 2017
  • Post-Environmental impact investigation(Post-EII) plays an important role in investigating and reducing the environmental impacts of construction operations in South Korea. To date, it has been estimated that the results for Post-EII showed the low reliability; however, understanding those reliability has rarely been studied. We investigated the effect on water qualities by construction operations of the quarry mine, training center, and golf club in South Korea. In addition, the results of water quality analysis in this study were compared and analyzed with those in Post-EII. Treated wastewater in a quarry mine showed high concentrations of biochemical oxygen demand(BOD), suspended solid(SS), total nitrogen(T-N), and total phosphorus(T-P). Compared with the water quality results between this study and Post-EII, the concentrations of BOD, SS, T-N, and T-P in the treated wastewater were higher than the interquartile range(IQR) as well as the range of the results from minimum to maximum in Post-EII(p<0.05). The concentrations of BOD, SS, T-N, and T-P in treated wastewater were high under constructions in a training center. The concentrations of BOD and SS exceeded the consultation standard for the treated wastewater. These concentrations showed the significant difference with the IQR and the range from minimum to maximum of the water quality results in Post-EII(p<0.05). Therefore, the management and monitoring for water quality should be conducted in the treated wastewater by of construction operations. In addition, the alternative to enhance the reliability for the water quality results should be sought in Post-EII.

Application of Radar Survey to a Granite Quarry Mine (화강암 석산 지역에서의 레이다 탐사의 적용)

  • Seol Soon-Jee;Kim Jung-Ho;Cho Seong-Jun;Yi Myeong-Jong;Chung Seung-Hwan
    • Geophysics and Geophysical Exploration
    • /
    • v.4 no.1
    • /
    • pp.8-18
    • /
    • 2001
  • To delineate the inhomogeneities including fractures and to estimate the freshness of rock borehole radar consisting of the reflection and tomography methods, and GPR surveys were conducted at a granite quarry mine. The borehole reflection survey using the direction finding antenna was also conducted to get the spatial orientations of reflectors. 20 MHz was adopted as the central frequency for the borehole radar reflection and tomography surveys and 100 MHz was for GPR. Through the interpretation of borehole reflection data using dipole and direction finding antenna as well as GPR images, which are good agreement with each other, we could determine the orientation of the major fractures in three dimensional way. Parts of travel time curves of tomography data showed the anisotropy, which is uncommon in granite quarry. By comparing the tomography data and TeleViewer images, the anisotropy effect in this area are closely related to fine fissures aligned in the same direction. The area confined by the two fractures, MF2 and MF5, might consist of the most fresh granite in the surveyed area, which was concluded from the borehole radar tomography, and GPR images as well as the distribution of anisotropy.

  • PDF

A Case Study About Applying Electronic Detonator on Downtown Tunnel Construction Area (도심지 터널에 대한 전자뇌관 적용 시공 사례)

  • Hwang, Nam-Sun;Heo, Eui-Haeng;Kim, Kyung-Hyun;Kim, Jeoung-Hwan;Seong, Yoo-Hyeon;Kim, Nam-Su
    • Explosives and Blasting
    • /
    • v.40 no.1
    • /
    • pp.29-38
    • /
    • 2022
  • Electronic detonators are now widely used in various construction sites and quarry mines. Including the sites where safety-thing is located nearby, Cases of using electronic detonators are increasing to maximize operational efficiency by improving blast fragmentation or reducing the cost of secondary blasting. This case study is about applying for electronic detonators on zone 00 construction site, which is the part of urban area metropolitan express rail A line project. Although the project was initially planned to utilize non-electric detonators, Electronic detonators are considered as the solution not only for safe and fast excavation, but also to minimize civil complaint and the damage of safety-thing. By applying electronic detonators, we were able to satisfy environmental regulations standards and prevent nearby safety-thing from getting damaged.

The Application of Gassed Bulk Emulsion to Quarry Blasting in Limestone Mine (석회석 광산 채석발파에서 Gassed Bulk Emulsion의 적용)

  • Min, Hyung-Dong;Jeong, Min-Su;Park, Yun-Seok;Lee, Eung-So;Lee, Won-Wook
    • Explosives and Blasting
    • /
    • v.25 no.2
    • /
    • pp.61-70
    • /
    • 2007
  • Korean large limestone mines started to employ bulk emulsion explosives to improve the productivity in early 2000s. As the application of the bulk emulsion explosives became common in the mid 2000s, the bulk emulsion application increases overall performance but it tends to decrease the moving and heaving because it lacks in gas volume and heat energy. Therefore, the chemical gassing technique was introduced to improve the blasting efficiency of the existing bulk emulsion explosives. The chemical gassing is a technique to replacing GMB(Glass Micro Balloon), which is used for a sensitizer, with gassing agent to chemically sensitize it. This paper introduces the case of successful application of chemical gassing in a Korean large limestone mine. We also compared and evaluated the blast and work efficiency between bulk emulsion GMB & gassing agent (chemical gassing). The results indicate that the replacement of GMB with gassing agent improved fragmentation in the upper part and toe of a bench as well as moving efficiency of the material.

Damage Conditions of the Slope Structures due to ARD (산성암반배수에 의한 사면구조물의 피해 현황)

  • Park, Sam-Gyu;Kim, Jae-Gon;Lee, Jin-Soo;Kim, Tong-Kwon;Ko, Kyung-Seok;Lee, Gyoo-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.878-883
    • /
    • 2005
  • This paper describes the effect of acid rock drainage(ARD) produced from the cut slope on the slope structures. Acid rock drainage is originated from a rock quarry located in coal mine zone and mineralization belt of Chosen Supergroup and Ogcheon group, andesite with the pyrite, and acid sulfate soils of Tertiary in Korea. The cut slope, where acid rock drainage comes out, almost has been constructed by shotcrete and planting works. According to the field observation results, in most cases, the acid rock drainage has an adverse effect on slope structures. The shotcrete, anchors and rock bolts produced corrosive action, and bad germination and growth diseases of covering plants of the slope planting construction due to ARD.

  • PDF

미국 및 일본의 석회석 광산 견학보고

  • 임광규
    • Cement Symposium
    • /
    • no.5
    • /
    • pp.50-51
    • /
    • 1977
  • $\cdot$ 일에서 기 개발 운영되고 있는 대형 노천 광산 및 광산 장비 제작 공장에 대한 전반적인 실태 파악을 통하여 향후 대형화로 국제 규모화될 당사 석회석 광산의 운영 및 기술적인 방향을 모색코저 함이 금번 출장의 목적이었다. 이에 당사 광산분야 기술자 6명으로 team을 구성, 76년 하반기에 약 1개월은 미국에서, 약 1개월은 일본에서 양국 굴지의 10여 open pit mine 및 3개 장비 메이카를 방문 견학하였다. 금번 방문결과 다음과 같은 점을 느꼈다. 첫째 금번 당사의 560만톤 증설은 사실상 미 $\cdot$ 일을 앞지르고 국제적으로 굴지의 규모임을 확인할 수 있었고 둘째 광상의 지리적 여건 비교에서는 미국의 것에는 뒤지나 일본의 조건에 비해서는 우리의 것이 결코 악조건이 아니며 세계 특히 일본 석회석 광산업계가 안고 있는 제반문제점의 심각성(광구 경계 인접에 따른 분쟁, 시가지 인접에 따른 공해문제, 개발 여건의 불량 등)에 비추어 볼 때 국내광산 기술자들의 노력 여하에 따라 일본은 충분한 경쟁대상이 될 수 있으며 국내 시멘트업계, 광산의 지리적 지질적 여건상 일본광산보다 더욱 우수한 광산을 만들 수 있다는 자신감을 얻었다. 그러나 첫째 장기적인 측면에서의 광산 개발의 결여, 둘째 맥석과 폐토 처리 및 quarry QC의 불가피성, 셋째 사회적 요소의 낙후(M.S 뇌관부재, 메이카 출장에 의한 장비의 수리, 화약류의 산원(山元) 혼합사용 등) 등은 두드러진 우리의 결함이라고 느꼈으며 이들 결함의 시정, 보완을 위해서 사내외적으로 기존질서의 재검토가 이루어져야 할 것으로 생각된다. 미 $\cdot$ 일 광산에서 일반화되어 있는 radio(walkie-talkie) system 및 electric shovel, 주우시멘트사 산구사무소에서 시도된 belt반전장치, 인력의 확대관리 등은 조기도입하여 실용화 할 수 있는 대상이라 생각하며 일철의 조형산개발(72년 생산 개시, 광산 개발비 200억원, 년산능력 800만톤)은 괄목할만한 것이었다. 또한 앞으로 국내업계 여건이 허락하는 한 광산 기술자의 해외파견 회수를 증가시켜 더 많은 사람들이 직접 보고 느끼어 우리의 것을 개선 창조해 나갈 수 있는 기회를 많이 가져 국내는 물론, 국제 경쟁에 대처할 수 있는 업계 기술자의 자질 향상을 바란다.

  • PDF