A Study on the Chemical Cleaning Process and Its Qualification Test by Eddy Current Testing

  • Shin, Ki Seok;Cheon, Keun Young;Nam, Min Woo;Min, Kyong Mahn
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • v.33 no.6
    • /
    • pp.511-518
    • /
    • 2013
  • Steam Generator (SG) tube, as a barrier isolating the primary coolant system from the secondary side of nuclear power plants (NPP), must maintain the structural integrity for the public safety and their efficient power generation. So, SG tubes are subject to the periodic examination and the repairs if needed so that any defective tubes are not in service. Recently, corrosion related degradations were detected in the tubes of the domestic OPR-1000 NPP, as a form of axially oriented outer diameter stress corrosion cracking (ODSCC). According to the studies on the factors causing the heat fouling as well as developing corrosion cracking, densely scaled deposits on the secondary side of the SG tubes are mainly known to be problematic causing the adverse impacts against the soundness of the SG tubes [1]. Therefore, the processes of various cleaning methods efficiently to dissolve and remove the deposits have been applied as well as it is imperative to maintain the structural integrity of the tubes after exposing to the cleaning agent. So qualification test (QT) should be carried out to assess the perfection of the chemical cleaning and QT is to apply the processes and to do ECT. In this paper, the chemical cleaning processes to dissolve and remove the scaled deposits are introduced and results of ECT on the artificial crack specimens to determine the effectiveness of those processes are represented.

The Qualification Test of KSLV-I(NARO) Assembly Complex

  • Jin, Seung-Bo;Cho, Byoung-Gyu;Lee, Chang-Bae;Chun, Young-Doo;Seo, Dong-Chan;Chung, Eui-Seung
    • Bulletin of the Korean Space Science Society
    • /
    • 2009.10a
    • /
    • pp.49.1-49.1
    • /
    • 2009
  • Ground Complex, which is located at Naro Space Center, consists of Assembly Complex(AC) and Launch Complex(LC) which is necessary for successful launch of KSLV-I(NARO). AC consists of Assembly/Testing Building(ATB), Payload Processing Building(PPB), Kick Motor Building(KMB). The purpose of AC is accepting of KSLV-I components, testing, checkout, assembly(disassembly) of the launch vehicle(LV), readiness for transferring LV to LC, accepting of integrated Launch Vehicle(ILV) in case of launch cancellation and short/long time storage, and so on. Qualification tests(QT) for the total system at AC are carried out to check hardware used for operations with first stage unit mockup, upper stage unit Mockup and integrated mockup(GTV). The qualification tests is carried out according to program and procedures of QT. By course of this process, AC is certificated that all the systems and facilities of AC are guaranteed by the fulfillment of technological operations envisioned in the program of qualification tests during the work with the mock-up.