• 제목/요약/키워드: Pumped-storage

검색결과 126건 처리시간 0.027초

응축기용 낮은 핀관의 내부 나선 홈에 의한 응축 열전달 성능과 압력손실에 관한 연구 (A Study on the Condensation Heat Transfer and Pressure Drop in Internally Grooved Tubes Used in Condenser)

  • 한규일;조동현
    • 수산해양기술연구
    • /
    • 제34권2호
    • /
    • pp.212-222
    • /
    • 1998
  • Heat transfer performance improvement by fin and groovs is studied for condensation of R-11 on integral-fin tubes. Eight tubes with trapczodially shaped integral-fins having fin density from 748 to 1654fpm(fin per meter) and 10, 30 grooves are tested. A plain tube having the same diameter as the finned tubes is also used for comparison. R-11 condensates at saturation state of 32 $^{\circ}C$ on the outside tube surface coded by inside water flow. All of test data are taken at steady state. The heat transfer loop is used for testing singe long tubes and cooling is pumped from a storage tank through filters and folwmeters to the horizontal test section where it is heated by steam condensing on the outside of the tubes. The pressure drop across the test section is measured by menas pressure gauge and manometer. The results obtained in this study is as follows : 1. Based on inside diameter and nominal inside area, overall heat transfer coefficients of finned tube are enhanced up to 1.6 ~ 3.7 times that of a plain tube at a constant Reynolds number. 2. Friction factors are up to 1.6 ~ 2.1 times those of plain tubes. 3. The constant pumping power ratio for the low integral-fin tubes increase directly with the effective area to the nominal area ratio, and with the effective area diameter ratio. 4. A tube having a fin density of 1299fpm and 30 grooves has the best heat transfer performance.

  • PDF

양수발전댐의 홍수기 운영 기법 (PDH Matrix) 개발 (Development of flood operation technique (PDH Matrix) of pumped storage power plant dam)

  • 정창삼;김시영;이승오;이동엽
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2022년도 학술발표회
    • /
    • pp.120-120
    • /
    • 2022
  • 우리나라 친환경 에너지 생산의 주요 축을 담당하고 있는 양수발전댐의 홍수 시 정교한 수계운영을 위한 방안으로 강우-유량-댐 수위 매트릭스(이하, PDH Matrix)를 개발하고 양수발전소상-하부댐 연계 운영에 따른 홍수 영향을 분석하였다. 연구 대상지역은 강원도 양양군 서면에 위치하고 있는 국내 최대 양수발전소인 양양양수 발전소로 총 저수용량 92만 m3의 콘크리트 중력식댐으로 유역면적은 약 125 km2이다. 양양양수 발전댐의 수계운영을 위한 PDH Matrix는 지속기간별 강수량 규모에 따른 홍수량 및 댐 최고수위 추정치를 판단할 수 있는 조견표로 강우규모 30 - 360 mm (30분 간격, 12개 강우규모) 및 지속기간 1-24시간 (1시간 간격, 24개 지속기간)인 총 288개의 강우조건별 홍수수문곡선을 개발하였다. 개발된 홍수수문곡선을 입력자료로 기존 댐 운영 방식인 AutoROM을 적용하여 저수지 홍수추적을 HEC-ResSim 모형으로 수행하고 최종적으로 개별 강우사상에 대한 강수량-유량-댐 수위 테이블을 작성하였다. 홍수기 댐 운영에 따른 최고수위는 초기 댐 수위조건에 따라 변동되므로 초기 댐 수위 조건(EL. 115 - 117 m, 1 m 간격)별 PDH Matrix를 각 각 개발하였다. 또한, 양수발전소의 특성상 상부댐으로 양수 또는 발전 방류에 따라 홍수 시 댐의 치수안전성에 미치는 영향이 크므로 상, 하부댐 운영에 따른 홍수영향 분석을 수행하였다. 구체적으로 하부댐에서 상부댐으로 양수 시 시간에 따른 하부댐 저수지의 수위변화 양상을 추정하였으며 극한적 홍수상황을 고려하기 위하여 상부 저수지가 만수인 상황에서 불가피하게 하부댐으로 방류가 필요한 상황에 대비한 홍수기 운영방안을 제안하였다. 본 연구는 하부댐-상부댐을 연계하여 운영하는 양수발전댐의 홍수기 수계 운영 방안을 수립한 첫 연구로 향후 연구에서 개발한 강우-유량-댐 수위 매트릭스(PDH Matrix) 작성 기법을 타 양수발전소 수계 운영 시 활용할 수 있을 것으로 기대된다.

  • PDF

전주시 덕진연못의 수생태 복원을 위한 용수확보방안 연구: 도시 저수지 복원의 새로운 패러다임 (A Study on Obtaining Waters to Restore the Water-ecosystem of Deokjin Pond in Jeonju: New Paradigm for Restoration of Urban Reservoirs)

  • 최승현;김석휘;이진원;김강주;오창환
    • 자원환경지질
    • /
    • 제48권6호
    • /
    • pp.467-475
    • /
    • 2015
  • 덕진연못은 전주를 대표하는 명소이나, 수질이 불량한 상태이다. 본 연못은 저수량 $88,741m^3$$3.77km^2$의 집수유역을 가진다. 그러나 무분별한 도시화로 인하여 덕진연못으로 유입되는 과거 하천이 차단되었고, 상류에서 양수되는 지하수와 수면에 내리는 강우로만 유지되고 있는 실정이다. 양질의 물갈이용수 부족은 호저에 쌓인 유기퇴적물과 함께 덕진연못 수생태환경 악화의 주범으로 지목되고 있다. 본 연구에서는 덕진연못 수생태 유지용수확보방안에 대하여 고찰하였다. 본 연구결과, 현재의 배수시스템을 개발이전으로 복원한다면 강우유출량만으로도 덕진연못을 연간 32회 물갈이 할 수 있는 것으로 분석되었다. 이와 같은 논리를 뒷받침하기 위하여, 양호한 수질상태를 보이는 인근의 오송지의 상태와 비교하였다. 오송지는 집수구역면적은 $0.535km^2$으로 덕진연못의 약 1/7에 불과하지만, 저수량은 $47,200m^3$으로 덕진연못의 반이 넘는다. 작은 집수구역으로도 오송지가 건강한 수생태환경을 보이는 이유는 강우의 상당부분이 땅으로 침투되어 오송지로 서서히 유입되는 자연배수시스템을 갖추고 있기 때문이다. 저영향개발(LID)은 물순환상태를 개발이전의 상태로 복원하는 도시개발기법이다. 덕진연못 유역 내에 내린 강우가 자연적인 방식으로 배수될 수 있도록 LID기법을 응용한다면 덕진연못 물갈이용수 확보는 충분히 가능할 것으로 보인다.

지상레이저스캐너를 이용한 댐의 변위관측 (Deformation Measurements of Dam using Terrestrial Laser Scanner)

  • 박세훈;최득화;한동엽
    • 한국측량학회지
    • /
    • 제27권1호
    • /
    • pp.645-655
    • /
    • 2009
  • 삼랑진 양수발전소 상 하부댐 시설물에 매설되어 있는 기준점을 이용하여 댐의 변위에 대한 모니터링이 이루어지고 있다. 1997년, 2002년, 2007년에 이루어진 수직 및 수평 변위 관측방법은 기준점에 대한 비교분석을 통해 댐의 거동을 파악하였다. 전통적 측량방법으로는 댐체의 전체적인 거동을 세밀하게 분석하기 어려운 문제가 있으므로 본 연구에서는 지상레이저스캐너를 이용하여 댐체 표면을 관측하여, 스캔성과와 설계단면과의 비교분석을 통해 준공이후 현재까지의 댐체 변형을 추정하였다. 상부댐의 설계대비 수직변위량은 댐마루의 중간부분인 최대단면부에서 최대 1.5 m가 발생하였고, 하류사면에서는 중앙과중하위 부분인 SP4-2 부근에서 0.75 m, SP4-4 부근에서 0.5 m가 발생하였다. 하부댐의 설계대비 수직변위량의 최대 침하는 댐마루와 상류사면 상단부에서 발생하였고 침하량은 $-0.4\;m{\sim}-1.0\;m$ 범위로 분석되었다. 본 연구의 성과는 향후 댐체의 전체적인 거동을 분석하기 위한 초기치 설정 관측으로 이용될 수 있다.

관수온도 상승률 증가에 의한 발전용 보일러의 온간기동시간 단축에 관한 연구 (Warm Start Up Time Reduction Through the Increase of Boiler Water Circulating Pump Inlet Water Temperature Rate of the Thermal Power Plant)

  • 강희성;문승재
    • 플랜트 저널
    • /
    • 제10권1호
    • /
    • pp.47-53
    • /
    • 2014
  • 1887년 경복궁 건천궁에서 최초로 전기점등 행사를 시행한 이후 2012년 11월 기준의 대한민국 발전설비 용량은 81,737 MW, 그리고 2012년도 최대전력 수요는 71,230 MW로 이전기록을 경신한 바 있다. 이렇게 급속하게 증가하는 전력수요를 충족하기 위하여 정부에서는 대용량 유연탄 화력과 원자력발전소를 건설하여 운영 중에 있으나 전력수요는 주중에 집중되고 주말에는 급감하여 주말의 예비률이 40% 이상을 상회하고 있어 양수발전기를 이용하여 주말수요를 창출하는 한편 감소된 주말의 전력수요에 맞추어 서울화력발전소을 포함한 고원가 발전소에 대한 주말정지를 시행하고 있다. 서울화력발전소는 전력수요지의 중심지인 수도 서울에 위치하였음에도 발전원가가 높아 2008년도 이후 매년 30회 이상의 주말정지를 시행함으로 기동정지 과정에서 많은 비용을 지출하고 있어 본 연구에서는 1969년 준공하여 열병합설비로 개조한 서울화력발전소 제5호기를 대상으로 온간기동 과정에서 보일러 강제순환펌프 입구 관수온도 상승률을 증가시켜 온도상승 공정에 소요되는 시간을 약 35% 단축하고 기동시간 종합관리 프로그램을 구성하여 운영함으로써 전체적으로 온간기동 시간을 23% 단축할 수 있음을 확인하였다.

  • PDF

한국의 지역개발과 댐건설 (Regional Development And Dam Construction in Korea)

  • 안경모
    • 물과 미래
    • /
    • 제9권1호
    • /
    • pp.38-42
    • /
    • 1976
  • Because of differences in thoughts and ideology, our country, Korea has been deprived of national unity for some thirty years of time and tide. To achieve peaceful unification, the cultivation of national strength is of paramount importance. This national strength is also essential if Korea is to take rightful place in the international societies and to have the confidence of these societies. However, national strength can never be achieved in a short time. The fundamental elements in economic development that are directly conducive to the cultivation of national strength can be said to lie in -a stable political system, -exertion of powerful leadership, -cultivation of a spirit of diligence, self-help and cooperation, -modernization of human brain power, and -establishment of a scientific and well planned economic policy and strong enforcement of this policy. Our country, Korea, has attained brilliant economic development in the past 15 years under the strong leadership of president Park Chung Hee. However, there are still many problems to be solved. A few of them are: -housing and home problems, -increasing demand for employment, -increasing demand for staple food and -the need to improve international balance of payment. Solution of the above mentioned problems requires step by step scientific development of each sector and region of our contry. As a spearhead project in regional development, the Saemaul Campaign or new village movement can be cited. The campaign is now spreading throughout the country like a grass fire. However, such campaigns need considerable encouragement and support and the means for the desired development must be provided if the regional and sectoral development program is to sucdceed. The construction of large multipurpose dams in major river basin plays significant role in all aspects of national, regional and sectoral development. It ensures that the water resource, for which there is no substitute, is retained and utilized for irrigation of agricultural areas, production of power for industry, provision of water for domestic and industrial uses and control of river water. Water is the very essence of life and we must conserve and utilize what we have for the betterment of our peoples and their heir. The regional and social impact of construction of a large dam is enormous. It is intended to, and does, dras tically improve the "without-project" socio-economic conditions. A good example of this is the Soyanggang multipurpose dam. This project will significantly contribute to our national strength by utilizing the stored water for the benefit of human life and relief of flood and drought damages. Annual average precipitation in Korea is 1160mm, a comparatively abundant amount. The catchment areas of the Han River, Keum River, and Youngsan River are $62,755\textrm{km}^2$, accounting for 64% of the national total. Approximately 62% of the national population inhabits in this area, and 67% of the national gross product comes from the area. The annual population growth rate of the country is currently estimated at 1.7%, and every year the population growth in urban area increases at a rising rate. The population of Seoul, Pusan, and Taegu, the three major cities in Korea, is equal to one third of our national total. According to the census conducted on October 1, 1975, the population in the urban areas has increased by 384,000, whereas that in rural areas has decreased by 59,000,000 in the past five years. The composition of population between urban and rural areas varied from 41%~59% in 1959 to 48%~52% in 1975. To mitigate this treand towards concentration of population in urban areas, employment opportunities must be provided in regional and rural areas. However, heavy and chemical industries, which mitigate production and employment problems at the same time, must have abundant water and energy. Also increase in staple food production cannot be attained without water. At this point in time, when water demand is rapidly growing, it is essential for the country to provide as much a reservoir capacity as possible to capture the monsoon rainfall, which concentarated in the rainy seaon from June to Septesmber, and conserve the water for year round use. The floods, which at one time we called "the devil" have now become a source of immense benefit to Korea. Let me explain the topographic condition in Korea. In northern and eastern areas we have high mountains and rugged country. Our rivers originate in these mountains and flow in a general southerly or westerly direction throught ancient plains. These plains were formed by progressive deposition of sediments from the mountains and provide our country with large areas of fertile land, emminently suited to settlement and irrigated agricultural development. It is, therefore, quite natural that these areas should become the polar point for our regional development program. Hower, we are fortunate in that we have an additional area or areas, which can be used for agricultural production and settlement of our peoples, particularly those peoples who may be displaced by the formation of our reservoirs. I am speaking of the tidelands along the western and southern coasts. The other day the Ministry of Agriculture and Fishery informed the public of a tideland reclamation of which 400,000 hectares will be used for growing rice as part of our national food self-sufficiency programme. Now, again, we arrive at the need for water, as without it we cannot realize this ambitious programme. And again we need those dams to provide it. As I mentioned before, dams not only provide us with essential water for agriculture, domestic and industrial use, but provide us with electrical energy, as it is generally extremely economical to use the water being release for the former purposes to drive turbines and generators. At the present time we have 13 hydro-electric power plants with an installed capacity of 711,000 kilowatts equal to 16% of our national total. There are about 110 potential dams ites in the country, which could yield about 2,300,000 kilowatts of hydro-electric power. There are about 54 sites suitable for pumped storage which could produce a further 38,600,000 kilowatts of power. All available if we carefully develop our water resources. To summarize, water resource development is essential to the regional development program and the welfare of our people, it must proceed hand-in-hand with other aspects of regional development such as land impovement, high way extension, development of our forests, erosion control, and develop ment of heavy and chemical industries. Through the successful implementation of such an integrated regional development program, we can look forward to a period of national strength, and due recognition of our country by the worlds societies.

  • PDF