• Title/Summary/Keyword: Public office building

Search Result 168, Processing Time 0.024 seconds

A COST DATA-BASED ESTIMATING MODEL FOR FINISHES IN THE KOREAN PUBLIC OFFICE BUILDING PROJECTS

  • Joon-Oh Seo;Sang H.Park;Choong-Wan Koo;Jong-Hoon Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.685-691
    • /
    • 2009
  • Recently, public office building projects are being recognized by many construction engineers and researchers, as the critical projects in the construction industry. The project budgets have sometimes exceeded due to the lack of core knowledge, experiences, skills and experts concerned in cost planning and estimating in the pre-construction stage. It has been highlighted that planning and estimating effectively the cost of public office building projects as critical in the design stage. Within this context, some cost data books and systems, such as RSMeans cost data systems and Spon's price book, have been systematically developed and used by many construction cost managers and organizations in order to effectively estimate and use their project budgets. As a result of this research, a cost estimating model for finishes has been developed, considering the cost data used in public office building projects.

  • PDF

A Study on the Interior Design Method of Public-Toilet in Office Building (사무소 건축의 공공화장실 실내설계 기법에 관한 연구)

  • 김정범;김은중
    • Korean Institute of Interior Design Journal
    • /
    • no.16
    • /
    • pp.16-21
    • /
    • 1998
  • This study aims at developing the interior design method of Public Toilet in office building. There needs new concepts in Public Toilet where we felt dirty smelling and dismal in the past. And the behavior in the Public Toilet become various such as combing the hair making-up changing the clothes rinsing out mouth and so on. Nowadays The Public Toilet of office building shows indirectly the hierarchy and the management philosophy of its enterprise, This study treats with the design items such as unit space zoning plan lighting plan and air-conditioning plan and construction method of Public-Toilet in office building. As a result of this study the interior design methods of Public Toilet must reflect use of fitting material lighting plan user's needs and functional divide.(Powder Zone and Physiology Zone) These result will become basic data of future interior design in Public Toilet.

  • PDF

A Study on Design Tendencies in Office Buildings of Public Institutions after Reinforcement of the Building Energy Performance Criteria in Korea (건물에너지성능기준 강화 이후 국내공공기관 업무용 건축물의 디자인경향)

  • Lee, Ah-Young
    • KIEAE Journal
    • /
    • v.11 no.6
    • /
    • pp.139-149
    • /
    • 2011
  • This study focuses on design tendencies in office buildings of public institutions after tightening up Korea's building energy performance criteria. Important office design criteria and recommendations pay attention to the issues such as building orientation, greening buildings, building form, space and envelop by intensifying building energy performance related laws, government guidelines and evaluation systems. The design tendencies explored in this research are as follows. Office buildings mainly face south and have various types of indoor and roof green spaces not for ecological reasons but for the rest. Building depth becomes thinner and atria are inserted into office buildings to improve daylighting and natural ventilation. Building cores are located on north or west and east sides acting as buffer spaces to reduce heat loss and to block solar radiation. Office building envelop design includes various creative ideas to control or utilize solar energy as like three dimensional or double structured skin and window size variation to cope with the intensity of solar radiation. Further, solar energy generation systems are integrated with building component such as roofs, sun screens and windows. This study demonstrates that government's reinforcement of the building energy performance criteria drives the change in design methods and approach.

Analysis of Annual Operation Status of Central Heating and Cooling System in a Public Office Building (공공건물 중앙식 냉난방시스템의 연간 운영 사례 분석)

  • Ra, Seon-Jung;Aum, Tae-Yun;Son, Jin-Woong
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.2
    • /
    • pp.175-180
    • /
    • 2020
  • The purpose of this study was to clarify precautions during the design and operation phases for energy reduction in a public office building. To check the operation status of the building, we measured the indoor temperature and humidity in the office space of the building installed central heating and cooling systems. And we analyzed these data and annual BEMS data. As a result, we found six problems related to decreasing system efficiency. Based on these, we presented the information to improve the efficiency of the system from the design and operation phase. Also, we present the need for a system to support the decision-making of operational managers in real-time for the energy efficiency of the building.

Stepwise Technique for Improving Building Energy Efficiency Rating Utilizing Quantified Simulation Model (정량화 시뮬레이션 모델을 활용한 단계적인 건축물에너지효율등급 향상 방안)

  • Kim, Gi-Seok;Kim, You-Min;Kim, Jong-Seung;Oh, Se-Gyu
    • KIEAE Journal
    • /
    • v.14 no.6
    • /
    • pp.65-73
    • /
    • 2014
  • Due to the Climate change and resource shortage by global warming, various problems are rising and getting worse around the world. Many countries are doing the considerable efforts to reduce greenhouse gas emissions. The government of South Korea also plans to decrease greenhouse gas emission, the various pilot projects are underway, which includes obligation of energy efficiency 1st rating and greenhouse gas target management system of public buildings. In particular, luxurious government office buildings and energy-wasting public building have issued and emerged as a social problem. Energy efficiency improvement of the existing public office buildings are becoming an important issue recently. This study is proposed the step-by-step energy improvement model according to the building energy efficiency rate in order to reduce the energy consumption. To attain this end, I set up a base model by analyzing the current architectural conditions of the existing public office buildings and grasped the specific properties of building energy consumption through energy simulations. Furthermore, I suggested phased reduction prototypes for the reduction target of energy consumption by applying the methods of the zero energy building plan. This study is expecting that prototypes would give directions when it comes to planning the implementation policy of phased building plan factors, according the building energy consumption reduction goal in the existing public office buildings which are the subject of building energy target management system.

A Study on the Plannig Characteristics & Improvement of Citizen Cultural Space in Public Building in terms of Cultural Administration - Focused on the Cases Since 2000's - (문화행정의 관점에서 본 공공청사 시민문화공간 공간계획 특성 및 개선방안에 관한 연구 - 2000년 이후의 사례를 중심으로 -)

  • Kang, Eun-Jin;Choi, Sang-Hun
    • Korean Institute of Interior Design Journal
    • /
    • v.23 no.2
    • /
    • pp.174-181
    • /
    • 2014
  • The purpose of the study for this thesis is to look into the status and issues of government office buildings since the self-government policy through comparing and analyzing government office buildings, between domestically and to provide improvement plans of the citizen cultural space and with the self-government budget, enhance the utility and efficiency of the government office buildings and to take a role of a reference in the future when citizen cultural space is formed in the government office buildings. As the result of the study, the space planning characteristics of government office building's citizen cultural space in terms of cultural administration is as follows. First, percentage of room to strengthen the sense of community is small. Therefore, the place where residents can argue there is a need. Second, it is necessary to expand the venue and art collection that are missing in public government buildings. Third, since the lecture room for lack of civic education, it should be taken into account when making cultural space for the citizens. Fourth, thread observatory and souvenir shops, providing information is not enough, it is to be further expanded. Fifth, rented facility for public is hall be provided with a diversity.

Analysis of New & Renewable Energy Application and Energy Consumption in Public Buildings (공공건축물의 신재생에너지 적용과 에너지 사용량 분석)

  • Lee, Yong-Ho;Seo, Sang-Hyun;Kim, Hyung-Jin;Cho, Young-Hum;Hwang, Jung-Ha
    • Journal of the Korean Solar Energy Society
    • /
    • v.32 no.3
    • /
    • pp.153-161
    • /
    • 2012
  • This study conducted a survey and field investigation on the application of the Public Obligation System for new & renewable energy in public buildings, as well as energy consumption of each building according to their uses. The findings are as follows: (1) Since the introduction of the Public Obligation System (until June 30, 2011), there was average 1.4 new & renewable energy facilities established at 1,433 places. Preference for solar energy facilities was the highest at 57.8%. (2) The revised act sets the obligatory supply percentage of new & renewable energy for each public building: it is 9.0% for a tax office, 4.2% for a dong office, 8.2% for a public health center, and 12.6% for a fire station. All the public buildings except for fire stations failed to meet 10% expected energy consumption, a revised standard. (3) Energy consumption of each public building was 120.6TOE for a tax office, 124.3TOE for a dong office, 166.4TOE for a public health center, and 174.6TOE for a fire station. The energy consumption was comprised of 80% electric power, 18% urban gas, and 1% oil. (4) Electric power consumption per person in the room was high at a dong office, and fuel consumption per person in the room was high at a public health center. In addition, electric power consumption per unit space was high at a public health center, and fuel consumption per unit space was high at a fire station. (5) In all the four public buildings, power load had the highest basic unit percentage at average 55%, being followed by heating load (21.2%), cooling load (15%), and water heating load (7%). A tax office and fire station had 2% load due to cooking facilities.

The Consciousness Research for Han-Ok Construction of Community Facilities in an Apartment Housing

  • Baek, Seung-Kwan;Kim, Young-Hoon
    • KIEAE Journal
    • /
    • v.14 no.5
    • /
    • pp.29-38
    • /
    • 2014
  • The Purpose of this study is to analyze the investigation of consumer's consciousness for Han-Ok construction of community facilities in an apartment housing. The contents of this study were largely composed of two parts; First was about concept and type of 'New Han-Ok type' public building. Second was about consciousness for Han-Ok construction of community facilities in an apartment housing. The result to this study is as following: 1) the concept of 'New Han-Ok type' public building should not only be defined in terms of cultural property or Han-Ok experience facilities but daily life and practical community. 2) the consciousness for Han-Ok construction of community facilities in an apartment housing was recognized affirmatively more than 75.9%. 3) the strengths of 'New Han-Ok type' public building was as following: daycare centers & small libraries & management office-use of eco materials, senior centers-traditional maintenance, community center-ease of daylight and ventilation. 4) Weaknesses of 'New Han-Ok type' public building was as following: daycare centers-security problem, senior centers-inconvenience of space, community facilities-inconvenience of facilities, small libraries-lack of storage space, management office-inconvenience of moving line. The conscious research for 'New Han-Ok type' public building should succeed for vitalizing for Han-Ok.

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

Changes of Gyeonggi and Chungbuk Provincial Office Buildings after Relocation during Japanese Colonial Period -focusing on Suwon and Chungju- (일제강점기 관찰부 이전(移轉) 후 관련건축물의 변화에 관한 연구 -수원과 충주를 중심으로-)

  • Choi, Ji-Hae;Harn, Dong-Soo
    • Journal of architectural history
    • /
    • v.30 no.4
    • /
    • pp.7-16
    • /
    • 2021
  • This study examines changes and features of provincial office buildings in Suwon and Chungju after relocation during Japanese occupation. Gyeonggi and Chungbuk provincial offices(Gwanchalbu) were relocated by Japan. Gyeonggi Provincial Office in Suwon used HwaseongHaenggung buildings and moved to Seoul in 1910. After relocation, most of HwaseongHaenggung buildings used for Suwon Governmental hospital(JaHye Uiwon). Suwongun Office, Suwon public elementary school, Japanese Military and Suwon Police station also used HwaseongHaenggung buildings with the Hospital. At first, Japan remodeled local government buildings for their use. Most of HwaseongHaenggung buildings had been destroyed to build new buildings since 1920s. Chungbuk Provincial office in Chungju used DongHeon building which is Chungju local government building and relocated to Cheongju in 1908. DongHeon building changed to Chungju county office after relocation. This building was renovated. Chungju county office moved to other site, this building was used for Chungju county conference room. During Japanese colonial period, Suwon local government buildings were destroyed and replaced with new Japanese style buildings. Chungju local government buildings were also renovated or destroyed.