• 제목/요약/키워드: Public construction projects

검색결과 546건 처리시간 0.028초

Modification of Public-Private Partnership in Japan

  • Kaneta, Takashi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.153-158
    • /
    • 2017
  • Procurement system of public construction projects in Japan is changing with diversity in rapid pace. The quality assurance and risk management of construction projects should be more certain as the projects are turning into larger scale and more complexed. The clients in the public sector will want to make the relation of responsibility among the client, the designer (architects and engineers), and contractor clearer in terms of role and risk. Public-Private Partnership (PPP) is one of the methods for collaboration of the public sector and the private sector in public construction projects where the public utilizes the ability and suggestion of the private. Private Finance Initiative (PFI), Design-Build-Operate (DBO), market testing, designated manager system, outsourcing of tasks in local governments are well-known as examples of PPP in Japan. Indeed, there is an obvious trend that Design-Build (DB) is adopted in public construction projects in many countries including Japan. In this paper, the public construction projects in various procurement systems are surveyed and analyzed. They are not limited within the traditional procurement, Design-bid-Build, a separate order system of design and construction. Design-Build or PFI are adopted. In particular, contract by wide range including maintenance of equipment can be found. On the other hand, modification from originally typical PFI is taking place, such as concept design and project finance are removed from the roles and the tasks of the special purpose company (SPC) in PFI. Standard roles and tasks in a construction project are modeled in this paper.

  • PDF

AN ANALYSIS ON FACTORS AFFECTING SCHEDULE PERFORMANCE OF PUBLIC HOUSING PROJECTS: CASE OF SINGAPORE

  • Bon-Gang Hwang;Xianbo Zhao;Si Yi Ng
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.412-418
    • /
    • 2013
  • With the increasing demand for public housing, the Singapore government decided to reduce the waiting time of future public housing owners, which requires these projects to be completed on time. As a result, this study aims to identify the frequent and impactful factors affecting schedule performance of public housing projects in Singapore. The survey conducted with 36 industry experts revealed that "site management", "coordination among various parties", "design changes by owner during construction", "availability of laborers on site", "availability of material", and "availability of staff to manage projects" were the six factors that should be emphasized to assure the schedule performance of public housing projects. In addition, there was statistically significant agreement between public housing projects and other building projects on both the frequency and impact ranks of the factors. The findings from this study will help practitioners involving public housing projects to take measures to assure the achievement of project schedule objectives.

  • PDF

Critical Factors Affecting No-dispute Performance: A Case of Ethiopian Public Construction Projects

  • Sinesilassie, Ephrem Girma;Tabish, Syed Zafar Shahid;Jha, Kumar Neeraj
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권4호
    • /
    • pp.24-34
    • /
    • 2016
  • Disputes seem to be synonymous with large-scale construction projects in Ethiopia. The purpose of this study is to determine the factors responsible for impacting the performance of Ethiopian public construction projects. To this end, 35 success and failure attributes responsible for impacting the performance of the projects were identified and presented to Ethiopian construction professionals in the form of a structured questionnaire, and responses were collected. The factor analysis conducted on the success and failure attributes influencing no-dispute performance separately resulted in six success factors and five failure factors. Further analysis using stepwise multiple regression indicates that owner competence and interaction among project participants have a positive impact on no-dispute performance. However, conflict among project participants has a negative impact on the no-dispute performance of Ethiopian public construction projects. Although Ethiopia-specific, the results reflect construction management problems common to both developed and developing countries. The findings are expected to help researchers and practitioners gain a better understanding of critical success and failure factors and to help them take proactive measures to avoid disputes in public construction projects.

A COST DATA-BASED ESTIMATING MODEL FOR FINISHES IN THE KOREAN PUBLIC OFFICE BUILDING PROJECTS

  • Joon-Oh Seo;Sang H.Park;Choong-Wan Koo;Jong-Hoon Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.685-691
    • /
    • 2009
  • Recently, public office building projects are being recognized by many construction engineers and researchers, as the critical projects in the construction industry. The project budgets have sometimes exceeded due to the lack of core knowledge, experiences, skills and experts concerned in cost planning and estimating in the pre-construction stage. It has been highlighted that planning and estimating effectively the cost of public office building projects as critical in the design stage. Within this context, some cost data books and systems, such as RSMeans cost data systems and Spon's price book, have been systematically developed and used by many construction cost managers and organizations in order to effectively estimate and use their project budgets. As a result of this research, a cost estimating model for finishes has been developed, considering the cost data used in public office building projects.

  • PDF

A Descriptive Analysis of Project Participants' Perception about Complaint in Public Construction Projects

  • Lee, Changjun;Lee, Ju-Hui;Yun, Sungmin;Han, Seung Heon
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.111-118
    • /
    • 2022
  • Conflicts in public construction projects become more serious and complex so that they have a negative effect on performance of projecets. Conflicts in public construction projects are defined as expanding in complaints. This study analyzes the relationship structure and effect on performance between complaints and conflicts. First of all, 219 survey data collected from industry experts were used to derive complaints arising from the project and to understand the characteristics of each complaint. In the case of environmental damages, rather than environmental damage during construction, harmful substances or effects that can occur in completed facilities cause complaints from local residents, and opposition from environmental groups has a great effect on time and cost increase. As for safety damage, civil complaints related to prevention and countermeasures for safety accidents occur frequently, and additional construction affects cost increases. Through this study, it is possible to understand the serious complaints that are prone to conflict in public construction projects, their frequency, and the performance of the project.

  • PDF

온라인 뉴스 기반 공공건설사업 갈등지수 산정에 관한 기초연구 (A Study for Conflict in Public Construction Projects Based on Online News)

  • 백승원;한승헌;윤성민;임종록;남지현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.277-278
    • /
    • 2021
  • Conflict in public construction projects has increased for the last decades. It not only entails enormous social and economic costs but also makes stakeholders suffer from unnecessary expense and time waste. This study defines the the conflict index for public construction projects based on news data, and calculates conflict index for representative past and current public construction projects that has been deepened conflicts at the national level. The result indicates that the major conflict issue of the 2nd Jeju Airport Project are the environment and location whereas that of the Gaduk New Airport Project are the safety, location and necessity. This approach is expected to enable construction project managers to manage conflicts quantitatively based on comparing with past cases.

  • PDF

주요개발사업의 환경영향평가서 분석을 통한 사회경제항목평가의 문제점과 개선방안 (Analysis of Problems and Improvement of Environmental Impact Assessment in Social-Economic Items Based on 19 Major Large Scale Development Projects)

  • 이상돈
    • 환경영향평가
    • /
    • 제13권4호
    • /
    • pp.165-185
    • /
    • 2004
  • Assessment in Socio-economic items should be used to estimate social influence when policies and projects were introduced. To estimate current situation of socio-economic items 19 Environmental Impact Statement (EIS) of large scale projects were analyzed. The projects were selected based on magnitude of social impact when the projects were implemented. Environmental Impact Statement was categorized into line projects(road construction, railroad construction, stream development, etc), and surface projects(energy development, wetland reclamation, recreation and sport development, and housing and residential development, etc) thus being chosen for 19 projects in each categories. This report was based on the analysis of 7 items in socio-economic environmental items(i.e., population, residents, industry, public facilities, education, transport and historical monument). Most EIS did not follow the regulation suggested by Ministry of Environment, and only current circumstances were briefly described. Indifference of in-depth analysis of socioeconomic environmental items would influence the process of social and environment impact negatively in the midst of construction of National Projects such as Outer Circle Seoul Highways, Saemankeum Reclamation Projects, etc. This abrupt halt of construction was mostly based on a lack of public hearing or public participation. Socio-economic items are also very much lacking in quantitative method and strengthening socio-economic environmental items is needed via checklist or matrix that brings decision-makers better ideas objectively.

Construction of Time - Cost Model for Building Projects in Vietnam

  • Long, Le-Hoai;Lee, Young-Dai;Cho, Jeong-Wook
    • 한국건설관리학회논문집
    • /
    • 제10권3호
    • /
    • pp.130-138
    • /
    • 2009
  • Bromilow's time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and 0.377 mean that the BTC regression lines moderately fit the data set.

Requirements for Effective Program Management of Public Owners

  • Song, Sanghoon;Bang, Jong-Dae;Sohn, Jeong-Rak;Cho, Gun-Hee
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.58-59
    • /
    • 2015
  • As the business environment for construction enterprises has been worse, the level of their dependence on public projects increases. Under these circumstances, the public owners should pursue more efficient management process and make continuous efforts to establish strategic project-oriented organizations. There are growing concerns on owners' role with the recognition that the public owners are the key stakeholders to improve effectiveness in public sectors and reinforce competitiveness of entire industry. This study reviewed the characteristics of public construction projects with the concept of program, evaluated the current status of program management capabilities, and discussed the requirement for effective program management.

  • PDF

건설공사 발주 공공기관의 안전점검 체계구축에 관한 연구 (Establishment of a Safety Inspection System for Public Institutions Ordered Construction Projects)

  • 박응호;이수동;정기효
    • 대한안전경영과학회지
    • /
    • 제25권3호
    • /
    • pp.55-62
    • /
    • 2023
  • Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.