• 제목/요약/키워드: Public Secter

검색결과 3건 처리시간 0.016초

물가변동에 의한 계약금액 조정방안 개선 기초연구 (Improvement contract sum adjustment method caused by price fluctuation)

  • 조훈희;서장우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2004년도 학술대회지
    • /
    • pp.83-86
    • /
    • 2004
  • Index adjusted ration method has been widely utilized in public construction secter for contract sum adjustment by price fluctuation. In this method. the Production Price Index are used for calculating the base ratio. but the PPI can't reflect the property of construction project in respect of the selected item and weight structure. In this research we prove the problem of using the index adjusted ration method in contract sum adjustment by price fluctuation. and improve it by using the construction cost index. which has the property of construction project. And the result. we figure out the difference between the PPI and CCI by $6.7\%$ in maximum value.

  • PDF

공공부문 시공책임형 CM 사업의 시공이전단계 성과분석 (Performance Analysis of Pre-Construction Phase of CM at Risk Project in Public Sector)

  • 박보성;김옥규
    • 한국건설관리학회논문집
    • /
    • 제22권2호
    • /
    • pp.97-105
    • /
    • 2021
  • 발주제도 혁신을 통한 국내 건설산업의 글로벌 경쟁력 강화를 목적으로 시작된 시공책임형 CM 사업이 공공부문에서 시범사업의 형태로 시행되고 있다. 그러나 정식 발주제도로 나아가기 위한 관련 법령 제정까지는 시간이 필요해 보이며, 사업에 대한 성과분석도 아직까지 미진한 상황이다. 이에 본 논문에서는 현재 시행되고 있는 4개의 시범사업의 사업이전단계사업관리(Pre-Construction Service)에 대한 성과분석을 통해 사업의 효과와 신뢰성을 검증하고자 하였다. Team Building, 설계도서 정합성, 공기검토, VE, BIM 활용 등 총 5개의 분야에 대해 성과분석을 진행했으며, 참여자 면담조사를 통해 문제점을 확인하고 그에 대한 개선안을 제시하였다. 본 연구의 결과는 향후 이루어질 발주제도 법제화에 대한 기초자료로 활용될 수 있을 것으로 기대한다.

조경계획.설계 기술용역의 수행실태에 관한 조사연구 (A Study on the Practices of Landscape Planning & Design Services in Korea)

  • 권오준;심경구;김유일;고동완
    • 한국조경학회지
    • /
    • 제21권4호
    • /
    • pp.113-129
    • /
    • 1994
  • This study is designed to analyze the trends of professional services in Landscape Architecture during the past 5 years(1987-1991) in Korea. The data were collected from 1,117 projects from 56 engineering and landscape architecture firms. The findings are summarized as follows: 1) The projects have been increased annually by 19 percent in numbers and by 47 percent in money terms. 2) The main sources of projects are local governments and corporations. However the private sector comprise 31 percent in projects number and 46 percent in money terms. 3) The public park and tourism site development comprise a half of the projects. Recently recreational forest, golf, amusement and large housing site development have increased very rapidly. 4) In terms of workscope they are devided by 'complex' project which include extensive engineering works and 'simple' project which contain mostly planting design. The former include receational project with average 5 or 6 months contract period, and the later include housing and building site design with 2 or 3 months period. 5) Two types of consulting firms are typical. One is comprehensive engineering firms with urban planning section and few landscape section. The other is specialized professional firms with urban planning or landscape architecture. 50 percent of the project was done by comhensive engineering firms and 60 percent was done by urban planning section. The implication of these findings are broad: Firstly, We have to meet the demands in private secter mostly in recreation and leisure related projects. Secondly, landscape architects and project managers need more professional skills and coordination ability to deal with 'complex' projects. Thirdly, to enhance the quality of professional services it is required to have enough work time and higher service fee through legal and institutional enforcements.

  • PDF