• Title/Summary/Keyword: Public Procurement Service

Search Result 80, Processing Time 0.033 seconds

A Study on the Effect of Quality Certification Incentives on Enterprise Management Performance - focusing on Office Furniture for the Public Procurement Service of Korea (품질인증(品質認證) 인센티브제도의 운영이 기업경영성과(企業經營成果)에 미치는 영향(影響) : 조달청 사무용 가구 중심으로)

  • Kim, Kwang Soo;Kwak, Soon Jin;Chung, Soon Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.1
    • /
    • pp.159-168
    • /
    • 2014
  • This paper study is to identify the effect of quality certification incentives regulations to a firm. The pur purpose of this study is to propose the right way of improvement and policy by conduct research for quality certification incentives regulations, which applied by public procurement service for office furniture. For more accuracy, this study analyze the result of questionnaire, visiting, telephone survey conducted by office furniture manufacturer those are registered in MAS (Multiple Award Schedule System).

Endemic Corruption in Supply Chain and Procurement in the Local Sphere of Government in South Africa

  • Odeku, Kola O.
    • Journal of Distribution Science
    • /
    • v.16 no.9
    • /
    • pp.43-52
    • /
    • 2018
  • Purpose - This article accentuates that there is pervasive corruption in the supply chain and procurement of goods and services in the South African public sector, particularly in the local sphere of government. Consequently, the poor and the indigents who are supposed to receive quality services are affected. Therefore, the article emphasizes the need to strengthen compliance in the supply chain and procurement processes in order to combat corruption. Research design, data, and methodology - This article extensively utilized qualitative literature review approach to address and solve the problem of endemic corruption in the supply chain and procurement being perpetrated by local government officials. Results - The synthesis shows that by strengthening compliance of supply chain and procurement strategies, measures and frameworks, the likelihood of corruption will be drastically reduced if not totally eradicated. It demonstrates that the poor and the indigents who are supposed to receive quality services are being denied due to corruption. It also shows that failure to comply should result to enforcement of punitive sanctions against perpetrators. Conclusions - This study indicates that effective and efficient implementation of supply chain and procurement strategies, measures and frameworks are panacea for curbing corruption in South Africa public sector especially at the local sphere of government.

Improvement of Architecture-Engineering Service Procurement System for Public Construction Project (건설기술용역 발주 및 입·낙찰 방식의 문제점 및 개선방안)

  • Kim, Sung-Il;Chang, Chul-Ki;Park, Dae-Keun;Bae, Yu-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.61-70
    • /
    • 2014
  • Various procurement systems for Architecture-Engineering service for public construction project are currently established by construction-related law. However, comprehensive framework and criteria for the selection of Architecture-Engineering firm are in absence. Even though various selection methods for Architecture-Engineering service are currently established by law, cost-based selection method is mainly used in selecting Architecture-Engineering firm for the service. This paper examined current use of procurement system for Architecture-Engineering service and drew problems in practice. Through analysis of problems and bench-marking of those systems in advanced countries and international organizations, several strategies to improve performance of Architecture-Engineering service and to maximize the efficiency were suggested. The suggestions include framework and guideline to select a procurement method for the service which is being considered for the project and way of improving current procurement system. These suggestions will be a foundation for utilizing appropriate procurement system for the specific project and can make domestic Architecture-Engineering firm more competitive in the global market by breaking form the cost-based selection method in the selection of Architecture-Engineering firms.

SNA Pattern Analysis on the Public Software Industry based on Open API Big Data from Korea Public Procurement Service (조달청 OPEN API 빅데이터를 활용한 공공 소프트웨어 산업의 SNA 패턴 분석)

  • KIM, Sojung lucia;Shim, Seon-Young;Seo, Yong-Won
    • Informatization Policy
    • /
    • v.24 no.3
    • /
    • pp.42-66
    • /
    • 2017
  • This study investigated the ecological change of public software industry, comparing the pre and post structure of industry network based on the application of the regulation restricting large company participation in public software market. For this purpose, we used big data of the software market from Korea Public Procurement Service and used the SNA(Social Network Analysis) methodology which is being actively used in the area of social science recently. Finally, we highlighted the contribution of open public data. By analyzing order and contract data of the public software industry for 3 years - from 2013 to 2015 - we found out two main things. First, we observed that Power Law distribution had been going on in the public software industry, regardless of the external impact of regulation. Second, despite the existence of such Power Law distribution, we also observed the ecological change of industry structure from year to year. We presented the implication of such findings and discussed the advantage of open public data as the original motivator of this study.

U.S. Architectural Engineering Service Procurement System for Public Construction Project and Its Implication (미국 공공건설사업에서의 건설기술용역 조달시스템 고찰 및 시사점)

  • Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.2
    • /
    • pp.215-225
    • /
    • 2020
  • In selecting a company of A-E service provider for a public construction project, public owners make widely use the evaluation method based on the quantitative criteria to emphasize transparency and fairness instead of putting more weighting on bidders' technical capability. The selection method and process to select technically better company has been in discussion to motivate company to build up their technical capability and better quality of service. This paper examined US laws and regulations related to evaluating and selecting an A-E company for public construction project in terms of principles, process, selection committee, evaluation methods, and contract management and so on. Then deduced several implications for domestic public owner to select the most adequate company for a certain architectural service through fair and efficient way. The major findings are technical capability based selection, emphasizing owner's role and responsibility, consideration of small and mid-sized company, debriefing, and post-service evaluation.

A Study on the Improvement Direction through the Analysis of the Legal System and Current Process of KONEPS (국가종합전자조달시스템의 제도 및 프로세스 고찰을 통한 개선 방향 연구)

  • Kim, Sang-Min;Lee, Hyun-Soo
    • Journal of Digital Convergence
    • /
    • v.15 no.11
    • /
    • pp.23-35
    • /
    • 2017
  • Since the beginning of 2002, KONEPS(Korea ON-line E-Procurement System) which is known with GePS(Government e-Procurement Service), has become a significant role in Korea public procurement service. This paper focuses on the amendments of the related laws and the practical improvement of inconveniences and inefficiencies in user's' position during the use of KONEPS. We analyzed the case of government procurement by major countries, the detailed process and function of KONEPS, and confirmed the revised procurement laws since the commencement of KONEPS. When a user of KONEPS makes an online purchase at the g2b shopping mall to purchase procurement goods, we analyzed focused on the inconvenience of option selection, user feedback after purchasing, unification of the purchase procedure, compared with general online shopping purchase. This paper suggests practical ways to improve the inconveniences and inefficiencies that arise in the process of procurement and use from KONEPS. It is necessary to study on the construction contracts and the empirical studies based on the questionnaire on the functions of procurement law and research model for the cases used in this study in the future.

Analysis on Procurement Auction System in Public Procurement Service (공공투자사업의 입·낙찰 분석)

  • Kim, Jungwook
    • KDI Journal of Economic Policy
    • /
    • v.32 no.2
    • /
    • pp.144-170
    • /
    • 2010
  • This paper considers the effect of various types of procurement auction system on competition focusing on the rate of successful bidding. We analyze the number of bidders and the rate of successful bids using online procurement data of the Public Procurement Service. The average number of bidders is 301 and the average rate of successful bids is 87.42% while the weighted average rate is 75.13%. These numbers show that there is quite strong competition among bidders and the rate is lower as the expected price is higher. When we analyze the data of price procurement auction, the rate is also shown to be lower as the expected price is higher. Furthermore, the rate decreases as the number of bidders increases which naturally makes the competition stronger. Meanwhile, the analysis finds that the inclusion of the onsite bidding, the PQ(Pre-Qualification) result, or major-10 winning companies cannot explain the rate much in our data. In case of turnkey-alternative, the average rate of successful bidding for 484 cases record 90.20%. The average is 84.89% with 120 alternatives and 91.97% with 364 cases of turnkey. The reason why the rate of turnkey-alternative is lower than that of price procurement auction is the lack of competition as well as the systematic difference. By setting up a model, we are able to explain the difference in rate caused by the respective reason. When we suppose there are 3 bidders in case of price procurement auction for a project that exceeds 100 billion won, the rate is expected to be around 64%. This implies that difference of 26% is caused by the systemic difference and 3% by the lack of competition. Therefore, we conclude that the difference in rate between turnkey-alternative and price procurement auction is caused mainly by the systemic difference. In case of PPP(Public Private Partnership) projects, among 154 projects in total, only 40% has more than 2 bidders that compete. The average number of bidders is 1.88 which is less than 2, and the average rate of successful bids is 90%. In sum, under the price procurement auction, there is strong competition which is reflected by the rate of successful bids. However, there is room to decrease the rate by strengthening the competition under the turnkey-alternative. Also with PPP projects, we expect the rate can be steadily reduced with revived competition among bidders.

  • PDF

A Case Study on International Technology Transfer of Korean Public Information Systems and Recommendations for NTIS (국내 공공정보시스템의 국제기술이전 사례연구 및 NTIS 제언)

  • Lee, Eunji;Kang, Inje;Lim, Chulsu;Choi, Kiseok;Lee, Byeong-Hee
    • The Journal of the Korea Contents Association
    • /
    • v.16 no.10
    • /
    • pp.533-545
    • /
    • 2016
  • It is well known that international technology transfer(ITT) is relatively more difficult than the domestic technology transfer because of the difference in interest, technology level, culture and other various macro-environmental conditions. This study aims to derive recommendations for ITT of National Science and Technology Information Service(NTIS) of Ministry of Science, ICT and Future Planning(MSIP) by conducting case study of ITT in domestic public information systems. The cases are the national agencies that performed successfully in ITT. The cases are Korea Customs Service(KCS)'s customs administration system(UNI-PASS), Public Procurement Service(PPS)'s Korea On-Line E-Procurement System(KONEPS), and Korean Intellectual Property Office(KIPO). After studying on how the cases proceeded ITT, this paper suggests proper preparation strategies in the view point of information marketing.

Suggestions for Detection System of Bid-rigging in Public Construction Projects

  • Song, Sanghoon;Bang, Jong-Dae;Sohn, Jeong-Rak;Cho, Gun-Hee
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.712-713
    • /
    • 2015
  • In recent years, the bid-rigging in public construction markets has been treated as a critical issue in Fair Trade Commission. The investigation revealed that the collusion was implemented extensively in every area from the material supply to the construction service of general contractors. This study reviewed the causes of the bid-rigging in public construction projects, and proposed the improvement plan to eradicate bad practices. Firstly, the causes and purposes of bid-rigging were categorized into two types of internal factors from construction companies and external environment factors influencing business activities. Secondly, the system development method was explained to detect the signs of bid-rigging based on the technical proposal documents in open tender. The detection systems of repetitive public owner also provide the function of sharing data on the companies and cases to violate the fair trade regulation. In addition, the problems and improvement direction of public procurement policies were discussed.

  • PDF

A Study on the Effects of Government and Electronic Public Procurement on the Private Sector's Technical Inefficiency (정부 및 전자 구매의 기술적 비효율 효과(Technical Inefficiency Effects)분석)

  • Roh, Jae-Whak
    • The Journal of Society for e-Business Studies
    • /
    • v.16 no.2
    • /
    • pp.111-127
    • /
    • 2011
  • The aim of this study is to reveal the effects of government and public electronic procurement on the private sector's productivity and technical inefficiency. Three cases are analyzed. The first scenario is that the government just appears as a new consumer to enterprises. Simply participating as a new consumer to enterprises reveals that government does not contribute to the private sector's productivity or improve technical efficiency. The second case is one where the government publicly procures the private sector's service or goods using IT technologies. It is revealed that government contribute to improve the private sector's productivity and reduce inefficiency. The last case is where the government demands business to connect to governments using new IT technologies. The government demands to adopt the IT technology for connection results in improved productivity and efficiencies in the private sectors.