• Title/Summary/Keyword: Public Private Partnership Projects

Search Result 62, Processing Time 0.028 seconds

Development of Competency Evaluation Model for Public Private Partnership to Establish Strategies for Overseas Expansion (해외진출 전략 수립을 위한 민관합작투자사업의 역량평가모델 개발)

  • Park, Hwan Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.391-402
    • /
    • 2022
  • With the number of social overhead capital(SOC) projects that introduce private capital on the rise, overseas construction global companies today need to establish and advance their overseas order strategies. In this context, the purpose of this study is to develop the public private partnership(PPP) capacity evaluation model for developing countries and use it for domestic overseas construction companies to establish strategies for overseas expansion. The PPP competency evaluation model analyzes the importance of PPP competency evaluation items and infrastructure environment competency evaluation items through a review of previous studies and an interview survey with overseas construction experts. Through the above analysis results and expert surveys, problems that may occur when overseas construction companies enter the PPP market were derived, and improvement measures were proposed. Countries with a high probability of overseas construction companies entering the PPP market were determined to be those that have a mature PPP system, low risk in construction, and a good entry environment with a high infrastructure market size and growth rate. In addition, a lack of PPP investment experience, the absence of information on the infrastructure environment, and a shortage of PPP experts were identified as problems when entering the overseas construction PPP market. As an improvement measure, it was suggested to enter in cooperation with domestic and foreign companies. In addition, a plan was proposed to develop a curriculum to secure experts in areas such as PPP finance and contracts and to provide PPP information for each country. These findings are expected to contribute to overseas construction companies proposing strategies for entering the overseas construction market and using them for overseas expansion strategies and policy establishment.

Appropriate Roles of Project Participants for Public Partnership Projects of Railways through the Organizational Behavior Theory (조직행동론을 통해서 본 민간철도 투자사업의 참여자간 갈등유형 및 역할정립 방안에 관한 사례연구)

  • Kim, Byungil;Yun, Sungmin;Han, Seung Heon;Kim, Hyung Hwe
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.839-847
    • /
    • 2008
  • No proper system exists for private investment projects, and efficient project management is not being achieved due to entanglements of management. Recognizing these circumstances, this paper has diagnosed the hard facts that project management organizations and systems are facing, and presented solutions to the factors that are obstructing the establishment of efficient project management system. This paper carried out focus group interviews on the experts who had participated in the Incheon International Airport Railway construction project, using the methodology of an exploratory case study. The results were systematically analyzed according to organizational behavior and causes corresponding to each of the problems were deduced. Private investment projects were divided into task environments and project organizations based on social science methodology and analyzed, and a final improvement plan for each participating organization was presented. An improvement plan was presented, and it was compared with the case study of Incheon bridge construction project, which is recognized as a model of successful project management, and its appropriateness evaluated.

Problems and Solutions of LCC Analysis in BTL Project for Education Facilities (교육시설 BTL 사업에서 LCC 분석의 문제점도출 및 해결방안)

  • Kim, Chung-Yung;Hong, Tae-Hoon;Hyun, Chang-Taek;Lee, Hyun-Jong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.182-192
    • /
    • 2008
  • The purpose of this research is to identify problems and solutions of domestic Life Cycle Cost analysis in BTL(Build-Transfer-Lease), a PFI(Private Finance Initiatives) project. It is expected BTL would be quite effective delivery method for public construction introducing the private's major capital investments and technologies, and obviously LCC analysis is becoming more important factor for success of BTL projects. Nevertheless, there are still some complicated issues in LCC analysis, a technique for selecting the optimal VE(Value Engineering) proposals and estimating OM&R (Operation, Maintenance, & Repair) cost of the buildings, and has been applied limitedly. This research mainly focuses on educational facility, as most frequently delivered by BTL currently, especially with two levels (Alternative LCC and Building LCC) , which is occupied main potion in BTL project. In addition, it identifies four main problems and suggests their solutions through case studies focusing six major factors (WBS, Repair Information, Life Cycle, Time value of money, Repair Information Database, LCC Model) from three projects. Advanced development of this research requires closer partnership between the private / public sectors, and their long term strategies.

Characteristics and Implications of ANRU as a Governance-Type Urban Regeneration Promotion Organization in France (프랑스의 거버넌스형 도시재생 추진기구로서 ANRU의 특성과 시사점)

  • Wonseok Park
    • Journal of the Economic Geographical Society of Korea
    • /
    • v.26 no.3
    • /
    • pp.324-336
    • /
    • 2023
  • The purpose of this study is to examine the characteristics of ANRU, France's governance-type urban regeneration promotion organization, and to examine policy implications that can be used for domestic urban regeneration projects. The results of the study are summarized as follows. First, ANRU is established and operated as a national governance-type urban regeneration promotion organization in France, and ANRU is a central-led urban regeneration promotion organization, but it aims to operate a governance method in which various urban regeneration projects participate. Second, ANRU operates three urban regeneration programs nationwide: PNRU, NPNRU, and PNRQAD, and through administrative and financial support, it is promoting the improvement of the residential environment in the business district, diversification of urban functions, economic development, and social diversity. Third, it proposed the need for a national-level governance-type urban regeneration promotion organization for effective promotion and visible results of urban regeneration projects in Korea, the need for solidarity between local governments, and the use of public-private partnerships at various levels.

A Study on Key Issues of Vitalizing the Governance of Rural Area Development and Policy Improvement Plans: Focusing on the Case of Regions in Chungcheongnam-do with Privately Entrusted Intermediary Support Organizations for the Community building Established (농촌 마을만들기 거버넌스의 활성화를 위한 주요 쟁점 및 정책 개선방안에 관한 연구: 충남지역 내 민간위탁형 마을만들기 중간지원조직 설치 지역을 사례로)

  • Ko, Kyoung-Ho
    • Korean Journal of Organic Agriculture
    • /
    • v.29 no.1
    • /
    • pp.51-73
    • /
    • 2021
  • This study is intended to derive the key issues on vitalization of the governance of rural area development for 6 cities and counties in Chungcheongnam-do where privately entrusted intermediary support organizations have been established and to present their improvement plans of policy. The findings of the study have shown the governance for the case regions is still being characterized with a very formal governance being dominated by the strong administrative initiative and expediency. What have been presented as the improvement plans of policy are as follows: First, core provisions of the ordinances must be strengthened to mandatory regulations, and some ways to check and supplement such as monitoring, policy forums by public-private partnership, etc. are required for the sake of the effective operation of the ordinances. Second, in relation to the bases of competence according to the roles of core governance players, it is necessary to overcome the limitations of job rotation system, align the administrative support systems, expand the functions of a policy committee based on public-private cooperation and operate it effectively in the case of administration, and to strengthen a footing of a civilian community and the perspectives of political incubation in administration and provide support projects contributing to the growth of the corporations in the case of the entrusted corporation, and to align the operating systems of the centers, review the introduction of a system with a full-time center head, continuously provide specialized education and improve the working environment in the case of the support centers.

Simulation and Feasibility Analysis of Aging Urban Park Refurbishment Project through the Application of Japan's Park-PFI System (일본 공모설치관리제도(Park-PFI)의 적용을 통한 노후 도시공원 정비사업 시뮬레이션 및 타당성 분석)

  • Kim, Yong-Gook;Kim, Young-Hyeon;Kim, Min-Seo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.5
    • /
    • pp.13-29
    • /
    • 2023
  • Urban parks are social infrastructure supporting citizens' health, quality of life, and community formation. As the proportion of urban parks that have been established for more than 20 years is increasing, the need for refurbishment to improve the physical space environment and enhance the functions of aging urban parks is increasing. Since the government's refurbishment of aging urban parks has limitations in securing financial resources and promoting attractiveness, they must be promoted through public-private partnerships. Japan, which suffered from the problem of aging urban parks, has successfully promoted several park refurbishment projects by introducing the Park-PFI through the revision of the 「Urban Park Act」 in 2017. This study examines and analyzes the characteristics of the Japan Park-PFI as an alternative to improving the quality of aging domestic urban park services through public-private partnerships and the validity of the aging urban park refurbishment projects through Park-PFI. The main findings are as follows. First, it is necessary to start discussions on introducing Japan's Park-PFI according to the domestic conditions as a means of public-private partnership to improve the service quality and diversify the functions of aging urban parks. In order to introduce Park-PFI social discussions and follow-up studies on the deterioration of urban parks. Must be conducted. The installation of private capital and profit facilities and improvements of related regulations, such as the 「Parks and Green Spaces Act」 and the 「Public Property Act」, is required. Second, it is judged that the Park-PFI project is a policy alternative that can enhance the benefits to citizens, local governments, and private operators under the premise that the need to refurbish aging urban parks is high and the location is suitable for promoting the project. As a result of a pilot application of the Park-PFI project to Seyeong Park, an aging urban park located in Bupyeong-gu, Incheon, it was analyzed to be profitable in terms of the profitability index (PI), net present value (FNPV), and internal rate of return (FIRR). It is considered possible to participate in the business sector. At the local government level, private capital is used to improve the physical space environment of aging urban parks, as well as the refurbishment of the urban parks by utilizing financial resources generated by returning a portion of the facility usage fees and profits (0.5% of annual sales) of private operators. It was found that management budgets could be secured.

Strategies for Multilateral Development Banks Utilization to Enhance International Construction Competitiveness (해외건설 수주경쟁력 강화를 위한 다자간개발은행 활용 방안)

  • Sohn, Tae-Hong;Jung, Chang-Goo;Jang, Hyoun-Seung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5D
    • /
    • pp.493-498
    • /
    • 2012
  • Korean construction companies have maintained stable market share based on high technology and cost competitiveness although international construction market has been stalled due to increasing global economy uncertainties. However, Korean construction companies have relied heavily on the general types of projects in Middle East and Asia although the portion of different types of projects such as Build-Transfer-Operate (BTO), Build-Transfer-Lease (BTL), and Public-Private-Partnership (PPP) has been increasing in the market. When delivering huge projects requiring contractors deal with activities from project planning to operation, securing finance sources and profitability is deemed critical. Therefore, Korean construction companies need more attentions on the construction market supported by Multilateral Development Banks. However, Korean construction companies have not utilized effective strategies for the market entry and also government supportive policies are not useful enough to help construction companies. This study aims both to analyze the contract structure of Korean construction companies for presenting critical factors that need to be prepared and to suggest various methods that can be applied to support construction companies that have much interest in the Multilateral Development Banks. According to the results of study, it is important that Korean government provide structural information system, make a specialized organization, prevent over-heating among Korean construction companies, and collaborate with Official Development Agency. In addition, it appeared that the fairness and financial stability of project have recognized main advantages of the Multilateral Development Banks.

Sustainability Appraisal of Chinese Railway Projects In Nigeria: Afoot

  • Awodele, Imoleayo Abraham;Mewomo, Modupe Cecilia
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.967-974
    • /
    • 2022
  • It is no news that Nigeria's infrastructure challenge is enormous. In the global ranking, Nigeria ranked low in quantity and quality of its infrastructural provision which has a great impact on the ease of business transaction. Low investments in transportation have brought about the current infrastructural deficit. Recently, the Nigerian government has made effort to address at least to some extent the infrastructural deficit through Public-Private Partnership, but this has not yielded the desired result. Moreover, the sustainability issues relating to railway projects such as, emissions, noise pollution, ecosystem, and other environmental issues calls for urgent attention. Hence, this necessitated consideration on sustainability appraisal for the Chinese rail project in Nigeria. This study reviews sustainability of railway projects built by the Chinese firm in Nigeria with particular emphasis on the environmental and social impact of these projects. The study further identified issues and challenges in project implementation with a particular focus on civil dialogue and community engagements. A detailed literature search was conducted on railway projects and infrastructure by systematically reviewing selected published articles.The analysis of the selected articles identified sustainability issues and potential for improvement of Chinese railway projects and how they contribute to or inhibit competitiveness in the Nigerian railway market. From the literature searched, some of the projects constructed by Chinese firm revealed that there is economic and social impact of railway projects delivered by the Chinese firm in terms of capacity development and knowledge transfer potentiality. For instance, in the just concluded Lagos-Ibadan railway projects, the study gathered that the project brought about 5000 jobs and local staff were trained by the Chinese company, this will boost man power and local content capability. Also, it will significantly improve Nigeria's infrastructure and boost its economic development. The study suggests that Nigerian government should ensure and provide an enabling environment that is conducive for investment on the continent. Peace, improved security, and decent governance are the best conditions for sustainable transportation growth.

  • PDF

도시개발에 있어서 중앙과 지방정부의 역할분담

  • 권원용
    • Journal of the Korean Regional Science Association
    • /
    • v.10 no.2
    • /
    • pp.7-16
    • /
    • 1994
  • With the advent of local autonomy in the 1990s, the polemic issue of decentralizing the central government power will undoubtedly come to the fore. The purpose of this study is to reconsider the government functions both at the central and local levels, paritcularly in the fields of urban planning administration. Those policy guidelines administration. Those policy guidelines employed such delegations include : 1) leaving detailed land use regulations to the discretion of local governments; 2) increasing role of local administrations and people regarding development projects; 3) promotion of urban developers as well as public and private partnership; 4) simplifying the procedure related to development applications. In this context, the role of the central government should be redefined; macro-scale policymaking to cope with on-going globalization trends; area-wide coordination among various local bodies ; providing planning standards and information; straining manpower and operation of urban development funds and subsidies.

  • PDF

Review on Rural Development Project in the United States and Its Application to Korea : Main Street Program (미국의 농촌개발사업 고찰과 시사점 - 메인 스트리트 프로그램을 중심으로 -)

  • Hwang, Han-Cheol
    • Journal of Korean Society of Rural Planning
    • /
    • v.15 no.4
    • /
    • pp.147-160
    • /
    • 2009
  • In 1977, the Main Street Program(MSP) of the United States was founded by the National Trust for Historic Preservation to revitalize downtowns which suffered major declines in their economy and population. This study analyzed the methodology of MSP such as the Four-Point Approach and the Eight Principles, history of MSP, local program organizational structure, local program budgets and funding, official designation and so on. Three successful cases were discussed the background of an introduction to MSP, implementations, results and revitalization statistics. To be able to apply rural development projects in Korea, this study showed the implications such as the need for a program's ethic and methodology, a strong public-private partnership, a dedicated organization, a full-time professional program manager, a commitment to good design and comprehensive work plan, and an educational program of ongoing training for staff, volunteers and other residents.