Journal of the Korean Regional Science Association
/
v.8
no.1
/
pp.31-50
/
1992
The aim of this paper is to define major factors influencing land development of each of major uses (residential, commercial, industrial) in the process of rapid urban expansion. The main hypothesis of this study is that land use changing patterns are directed by supply side of land managed to public policies rather than demand side. The graphic analysis is applied to relationships between urban growth and land development process of each use and between land development project managed to public policies and land development process. Public and land development projects and zonning protection seem to be major roles of land supply and main determinants of urban spatial structure. Location factors for land development of each uses are selected in 23 variables. Factor analysis is applied to test correlation between variables in 1971 and 1981. Factor structure between two years is similar, but progressive processing of functional separation is derived such as intensive land use is grouped, different location between residential and industrial use is deep. Dependent variables are standardized to logarithm of land development of each use per unit vacant land in two periods, between 1971 and 1980 year and between 1981 year. Correlation analysis between 6 dependent variables and 23 location factors in each years are applied. Major factors of each use are selected in criteria such as high correlation with dependent variables, low correlation between independent variables and common application in two periods. As the result, major factors for residential land development are Land Readjustment Project (LRP), percent of total zoned area in residential zone, residential floor space density per available area, percent of total area in industrial use; for commercial development is distance to CBD, percent of total area in commercial use, residential floor space density per available area in each year, and volumn rate of industrial use; for industrial use is percent of total area of industrial use is percent of total area of industrial use, Industrial Estate Project (IES), LRP, and distance from CBD. Land development pattern of each use between two periods are slightly different. So 6 equation is derived from appling backward method of regession. Adjusted multiple R squares of all is more than 0.5 and those equation is statistically significant and valuable to assist urban land use forecasting.
This study explores the outcome of the current Land Compensation Act for the indigenous residents of DAEIM Public Development Project Zone in Gyeongsan City. The purpose of the law is to return part of the development gains to the native residents and to support the re-settlement of the native residents. As the Land Compensation Act applies to each area with different standards, the monetary terms of land compensation which the native residents eventually receive varies across the region and development sites. That means the development gain is not fairly shared with the native residents of the redevelopment area and it does not necessarily support the settlement of the existing residents. It is supposed that the actual compensation for the native residents should be in full cash value but it is not in reality. The study demonstrates the outcomes of the land compensation that the residents received are far from the original purpose of the Compensation Act using the case example of DAEIM Public Development Zone in Gyeongsan, Gyeongsangbukdo. Only a small proportion of the natives managed to achieve the development gains. Accordingly the majority of the native residents has lost re-settlement opportunity. It suggests that the Compensation Act and the implementation procedure should be reviewed and revised accordingly. The details of compensation plan should be tested and set up in line with the characteristics of the project area. In particular, the compensation details in terms of the size and types of land, average value of land for indigenous residents receive, and the amount of compensation per household should be clearly demonstrated to the resident.
International journal of advanced smart convergence
/
v.13
no.3
/
pp.259-266
/
2024
One of the most time consuming issues in a city development is the identification of suitable areas for urban infrastructures and proper land uses. Suitability analysis is the process and procedures to find the best available land in given area -that is, the ability of a system to select the needs of users in land use. This paper studied the usage of Geographic Information System technique and methods for the selection of the most appropriate sites for public park in the city of Gwangju. GIS was used as a standard technique to find the best available sites for development in urban areas. For this cause, digital elevation model and spatial data were used to produce different thematic layers by using software Idrisi. Criteria for finding the suitable site for park development were decided to evaluate the land and the followings 4 criteria were selected: on land with less than 3 degrees in slope, outside a 200m buffer around lakes, on land currently designated as forests, and 20ha or greater in size. To meet and measure each criterion, distance and context operators were applied to reclassify the importance of certain weight and Boolean images were generated to meet the criteria. These weights and maps has been combined using ArcGIS tools and the final map was prepared showing the most suitable sites. We may assist city planners and government officials in future development of public facilities including parks and related land use plans at urban level and act as to ensure proper land use planning and management of the urban areas.
Journal of Agricultural Extension & Community Development
/
v.9
no.1
/
pp.43-60
/
2002
Recently the North Korea has been suffered from the grain shortage, and the fundamental reason was in the socialistic land regulations and collective production which restrain farmers' labor desire. So one of the key in solve the problem may be in the reformation of the socialistic land regulations and collective production, however, the capitalistic land regulations may not work as the reformational alternative in the North Korea. The third alternative for land should consider efficiency and equality of reformation itself as well as environmental problems. The purpose of the study was to discuss the possible application of the Public Land Lease from Henry $George(1839{\sim}1897)'s$ theory. The basic idea of the Public Land Lease was that the government has the right of sentence and the right of profit for the land, and the individual has the right of use for the land. Under the Public Land Lease, the individual must pay the land rent for the period of the use for land, and must return the land when the contract is over. If the North Korea's rural land regulations reformed into the Public Land Lease, it would be the first reformational model beyond china.
Journal of Korean Society of Environmental Engineers
/
v.38
no.7
/
pp.377-386
/
2016
The purposes of this research are to examine soil pollution in the nation and to explore the contaminated soil management of the public housing agency in public land for residential development. In so doing, the primary and secondary data were utilized, the former made use of the public data annually released by the Korea Ministry of Environment, and the latter relied on a self-administerd questionnaire survey conducted in the staff of the public housing agency, particularly those in charge of soil contamination in large-scale land, housing and urban development projects. The findings reveal that the national concentrations of 21 inorganic and organic soil contaminants (e.g., Cd, Cu, As, Hg, Pb, Cr, Zn, Ni, F, P, PCB, CN, Phenol, BTEX, TPH, TCE, PCE, Benzo(a)pyrene, and pH) in the land were extracted to be well below the risk level designated by the statutory guidance while industrial areas had them at a relatively modest level. In addition, the survey results indicate that the public housing agency didn't establish specific and clear guidelines for soil pollution and its remediation in the residential land development, so that contaminated sites have been primarily remediated by outsourcing companies. As the unexpected occurrence of contaminated sites causes the incurring expenses added to total project budget, the provision of both professional training and on-site manuals with the sufficient information on techniques and methods of soil contamination is critical to promptly and systematically deal with soil pollution.
Park, Joon-Young;Bae, Kang-Won;Kim, So Young;Jung, Kyung-Yoon
KIEAE Journal
/
v.16
no.1
/
pp.37-45
/
2016
Purpose: According to the characteristic of hanok public building, Planning criterion of structure, technology, efficiency, design is needed which can includes various type of new-hanok type public buildings. In this paper, we collect expert opinions to be used as a basis for developing models of New-hanok type Public Buildings. Method: This study was conducted in Research Study and expert surveys. The Part of reviewing Study looked at conception of new-hanok type public buildings model development and overview planning criterion set briefly. Expert surveys were targeted to professors and architects who are related in new-hanok type public buildings model development research. Result: In this study, we suggest improvement direction about planning criterion of new-hanok type public buildings model development based on opinions collected by expert surveys. In conclusion, first, In concept and legal status, it is necessary to adjust clearly than the term and legal status of new-hanok type. Second, various applicability is needed by using new materials and new construction method at the part of planning elements. Third, 'composed structure-convergence type' and 'composed structure-juxtaposed type' should be clearly classified or combined at the part of Setting of type. Forth, improvement on heat insulation, soundproof, waterproof efficiency is demanded to roof, wall, window systems. Fifth, arranging revitalization plan is important.
The Journal of Sustainable Design and Educational Environment Research
/
v.8
no.1
/
pp.34-46
/
2009
The purpose of this study was to analyze the school location decision direction for land use planning of public land development. And this research proposed the school location decision direction for urban amenity. So this research present the implication on urban planning and design for architecture, park-school complex. This study perform the relationship with land use planning out side environment of school land. This research proved the fact that the school land relationship with the park, the other school land etc. And this result will be used in decision-making-process of land use planning, public land development construction, urban design and city policy.
Agricultural land act was promulgated 1994, 12, 22. Now this is the time to evaluate present agricultural land related laws and its implications. Land problem is a conflict between private characteristics of ownership and public characteristics of utilization. Agricultural development aeras are the key areas where the conflict is intersected. Agricultural development aeras have many regulations to their use, so the price is relatively low. However to keep the food sufficiencies and public purposes, government have to keep agricultural development aeras. To compensate the owners of agricultural development aeras, I suggested some measures. One is direct payment to the owners of agricultural development aeras, the others are environmental subsidies.
International conference on construction engineering and project management
/
2015.10a
/
pp.712-713
/
2015
In recent years, the bid-rigging in public construction markets has been treated as a critical issue in Fair Trade Commission. The investigation revealed that the collusion was implemented extensively in every area from the material supply to the construction service of general contractors. This study reviewed the causes of the bid-rigging in public construction projects, and proposed the improvement plan to eradicate bad practices. Firstly, the causes and purposes of bid-rigging were categorized into two types of internal factors from construction companies and external environment factors influencing business activities. Secondly, the system development method was explained to detect the signs of bid-rigging based on the technical proposal documents in open tender. The detection systems of repetitive public owner also provide the function of sharing data on the companies and cases to violate the fair trade regulation. In addition, the problems and improvement direction of public procurement policies were discussed.
Parking lot within housing site contains public interest of relieving parking space shortage problem and subject to public restriction. If auctioned off at higher price by excessive competition in general competitive bid for land bidders, the development of parking lot will be made against its original purpose supply. The core issue is that a bid price is quite often to be blown out of proportion by 150%~ 250% due to extreme competition and, could face serious problem if a winning bidder runs sale business. If it is rental business, although about 30% of the total floor space of the whole building to be used as neighborhood facilities, too high winning bid price cause to lose transparency. In case of sale at aggregate buildings, most business operators would sell 30% of the neighborhood facilities, spare the parking lot and manages thereof separately. According to Aggregate Buildings Act, neighborhood facilities are allowed for individual registration and ownership of parking lot by business operator or designated person by business operator. In this case, the parking lot becomes 70% of the total floor space of the whole building and 70% of the land share which makes the mortgage very valuable and easier for business operator to get financial loan. There used to be many cases such as owners of neighborhood facilities (aggregate buildings partial owners) who run parking lot to repay their loan running parking lot to repay loan, but found that very tough and reached auction and relatively disadvantaged. For parking lot within housing site, it is recommend to exclude the public factors that land has and take into account of public restriction in area (housing site). Business opportunity for operators and protection of property rights for buyers in aggregate buildings, land supply method is recommended to replace from highest bid method into draw or private contract. In terms of price, supply at estimated price (construction price) and restriction on usage (Co-ownership of parking lot) proposals are submitted.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.