• Title/Summary/Keyword: Public Design Project

Search Result 408, Processing Time 0.026 seconds

A Study on the Building of Architectural Landscape Image in the Vulnerable Community - Focused on the villages of SaethulMaul Project - (취약지역 마을의 건축경관이미지형성에 관한 연구 - 새뜰마을사업 대상마을을 중심으로 -)

  • Chong, Geon-Chai
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.18 no.3
    • /
    • pp.17-24
    • /
    • 2016
  • The aim of this study is to build an architectural landscaping design ways of vulnerable community in rural area. I surveyed scenery structures, public buildings and single home forms, and fence types of house in twelve villages which have undertaken improving environment of rural community in four provinces. They all have an inferior surroundings to live in rural village, because they were isolated from the city, located on the mountain or island, and made a living under the slate materials of roof. The central government has been driving to reform the conditions with local office, so that they may increase their living qualities and village environment to get to the general level of rural area. There are three results of this study as follows: First, the scenery of the village surveyed has a remarkable views of locality and hierarchy of layers between field and mountain, which is very identified as a typical image of Korean rural topology. Second, the public buildings and single homes and outside wall of houses were personally designed or reformed as a various types like a flat slab style and different architectural structure, because they followed only to keep the architectural code rather than to make a harmony with other traditional style buildings. When they have to remodel it again through SaethulMaul project, they are needed to consider of both architectural code and design guideline for the local landscape design image. Third, to make a different landscape view of each village and improve housing conditions, it should be taken a people participation design way.

Design of maturity model for software project management level evaluation (소프트웨어 프로젝트의 관리 수준 평가를 위한성숙도 모형 설계)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.4
    • /
    • pp.609-615
    • /
    • 2011
  • In recent public institutions and banks to improve competitiveness in the integration of information systems projects are larger in size and may be the project's ever-growing need appropriate software project management plan. However, between the effect of the project management area for systematic research was scarce. Through this study, previous research in the important area of project management is developed, and "scope, schedule, quality, human resources, risk" of each area of impact analysis and the interaction between the progress of each area, the planning, execution, completion Performance levels were analyzed separately. Affected and Performance Analysis of the results to assess the level of the project management model is presented.

An Analysis of New Urbanism Urban Design Factors in New Town -Case Study on Eunpyung New Town District 1 in Seoul - (국내신도시 사례를 통해서 본 뉴어바니즘 도시설계요소 분석 -서울시 은평뉴타운 1구역을 중심으로-)

  • Na, In-Su
    • Journal of KIBIM
    • /
    • v.11 no.1
    • /
    • pp.31-38
    • /
    • 2021
  • The design principles of new urbanism (NU) have been adopted for new towns-in town projects for inner city neighborhoods in Seoul, Korea Since 2000. Here, ten NU principles were matched to four urban design categories: streets, land use, housing and buildings, and public open spaces. These elements were analyzed for Eunpyung New Town project. Through the case, the applications and implications NU principles are explored. The principles of connectivity, quality architecture and urban design, increased density, green transportation, sustainability, and quality of life were positively and successively adopted for streets, land use, housing and buildings, and public open spaces. The principles of mixed-use and diversity and traditional neighborhood structure were only partially applied in land use, housing and buildings, and public open spaces. It should be note that the walkability principle is intended not for job-housing proximity, but for pedestrian-friendly street design.

The Career Orientations of R&D Professionals : An Empirical Analysis (R&D 전문가들의 경력 지향성에 관한 실증적 연구)

  • 차종석;김영배
    • Journal of Technology Innovation
    • /
    • v.6 no.1
    • /
    • pp.215-249
    • /
    • 1998
  • This study empirically examines the relationship between the career orientations of R&D professionals and their demographic characteristics (age, tenure, and education level), affiliated organizations (public and private organizations), reward systems. It further explores the contingent effects of the career orientation fit between leader and members on their performance. The results reveal that : 1) five different career orientations (technical, manager, project, technical transfer, and entrepreneur) are empirically distinguished, 2) technical orientation of R&D professionals is higher in public in private sectors, 3) technical, project, and manager orientation are positively associated with the education level, while technical transfer and entrepreneur orientation are negatively associated with the education level, 4) manager and technical transfer orientation is positively related with age and tenure, 5) the career orientation fit between leader and member is closely related with job satisfaction and organization commitment, and partially related with technical performance, 6) R&D professionals with different types of career orientation exhibit different preference to various rewards. Based on these findings, this study suggests several practical implications for the design of career ladder, mentoring, and reward systems of R&D professionals.

  • PDF

A Basic Study on the Evaluation Method for the Selection of Construction Responsible CM Operators in Korea (국내 공공부문 시공책임형 CM 사업자 선정을 위한 평가방식에 관한 기초연구)

  • Park, Bo-Sung;Lee, Tae-Hyeong;Bang, Hong-Soon;Kim, Ok-Kyue
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.298-299
    • /
    • 2018
  • The construction liability type CM has been introduced in the form of a pilot project through public institutions since 2017 since it was introduced in the term of construction responsibility type construction project management in the Basic Law of Construction Industry in 2011 with the aim of improving the constitution of the Korean construction industry and strengthening global competitiveness. Through the introduction of construction-responsible CM, the government intends to change the paradigm of the overall construction industry, including design and construction, construction costs, disputes between stakeholders, and transparency of business. In this regard, the study aims to compare and analyze the evaluation methods on the bidding guide that public institutions (LH) are currently using to select companies in order to lay the foundations for successful construction of construction-responsible CM ordering methods.

  • PDF

A Selection Model of Suitable Tendering System for Public Construction Projects (공공건설공사의 최적 입찰방식 선정모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.164-174
    • /
    • 2008
  • It is crucial In decision making to select a project delivery system (PDS) adjusted accordingly to the project characteristics. Furthermore, selecting a tendering system is the kernel in the process of selecting PDS. In October 2007, the Ministry of Finance and the Economy of Korea launched two new project delivery systems, "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" by revising enforcement ordinances of "Act on Contracts to Which the State is a Party" to provoke the tendering systems. In order to support the proposed purpose, this research developed a selection model for suitable tendering system, which helps a public owner select a tendering system appropriate to the project characteristics. First, the framework of the model was set throughout analyzing previous researches and interviewing relevant experts. Additionally, by analyzing the survey result from 265 experts engaged in architectural and civil engineering business, the relative weights of the selection factors and the effectiveness values of the alternatives were suggested as the quantitative evaluation references. Finally, the practical guideline was suggested to apply this model to three public projects scheduled to be delivered. The result of applying the model to three case projects showed that further researches were needed to make the selection process logical and to suggest the standard weights and effectiveness values according to project type.

Application of Modifiable Bid of BOQ in Garak Market Modernization Project Phase 1 (가락시장현대화사업 1단계 물량내역수정입찰 적용 사례)

  • Cho, Kyung-Je;Kim, Hyung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.111-112
    • /
    • 2015
  • Garak Market Modernization Project Phase 1, which is the public projects worth 1,75 billion won, was delivered by adopting modifiable bid of BOQ on the lowest price award system. The modifiable bid of BOQ system allows bidders to modify quantities based on their own drawings and construction specifications and requirements. It was initiated by the government for minimizing design error and for inducing technical competition between tenders by checking errors. At that time the bidding, it allowed modifying the BOQ all the works. In the construction phase, the responsibility for the design changes, due to mistakes and omissions on design documents and BOQ were disputed between the owner and the contractors. This study analyzed the problem of the system and addressed a need of improvement.

  • PDF

CONSTRUCTABILITY REVIEWS: A STRATEGIC PROCESS IN DESIGN DEVELOPMENT

  • Patrick T.I. Lam;Franky W.H. Wong
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.1-8
    • /
    • 2007
  • Construction designs are often produced with insufficient considerations on the constructability aspects. Poor constructability has resulted in delay, cost increase, disputes, safety hazards and inconvenience to the public. Increasingly, there has been a call for more systematic input of construction knowledge in the planning and design processes of modern day's infrastructure development. In some countries, notably the US, the practice of constructability reviews is on the rise, with concomitant benefits. It is advocated that construction plans and designs be subject to constructability reviews as early as possible. It should be made part of the project management strategy driven by the client. This paper outlines the constructability review process and benefits, whilst drawing lessons from a number of case studies.

  • PDF

A PROPOSAL OF CONSTRUCTABILITY REVIEW IN THE BASIC DESIGN STEP FOR DESIGN-BUILD PROJECTS

  • Sung-Wook Choi;Young-Woong Song;Yoon-Ki Choi;Dong-Woo Shin;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1150-1153
    • /
    • 2005
  • The orders of Design-Build Delivery System (DBDS) in a large and public construction project have been increasing. Single Source Responsibility (SSR) for design and construction, which contributes to quality improvement of design and construction, has been performed. The DBDS performs SSR for design and construction, but, it has not maximized effect because of the dissatisfied alternative analysis procedures which are based on constructability evaluation and the information system in the design step. In this research, Constructability Evaluation Factors (CEFs) that must be evaluated, investigated, and reflected in the basic design step for design-build projects. The CEF proposed and the business process of each conductor has been systematized. To propose constructability evaluation factors, first classify drawing information by the constructability evaluation sphere. CEFs must be proposed to evaluate factors according to interference among work items. Second, applicable CEFs must be classified by preference ranking and weight. Third, the values of constructability factors in accordance with building elements and work items, need to be calculated. Finally, the CEFs proposal will support rational decision making, design cost reduction, and quality improvement through the values for constructability of building elements and work items.

  • PDF

A Study on the Process of Estimating the Amount of Materials for Client's Decision-Making Support in Space Programming Stage of Pre-design BIM -focusing on Building Interior Finishing- (건축 기획 BIM의 공간 프로그래밍 단계에서 발주자 의사결정지원을 위한 물량예측 방법론에 관한 연구 -건축마감을 중심으로-)

  • Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.3
    • /
    • pp.19-28
    • /
    • 2010
  • The construction projects are recently having changes in their magnitude and complexity. Therefore, the amount of information created and managed by participants over project phases is enormous and this may cause difficulties in consistent and integrated data management. Because of the change in construction projects, there is a need to apply more logical and systematic ways to deal integrated data management. For the solution to this, BIM(Building Information Modeling), a new paradigm for integrated management of the information over project life-cycle, has been seriously considered. Also, the Korean Public Procurement Service announced that project over 50 billion Korean Won should introduce BIM into procurement starting from 2012. However, the studies and development have lack on studies of applying BIM and managing the data made using BIM in pre-design and maintenance stage. In pre-design stage, the concept of schematic design model is made to support for making major decisions concerning the size, shape and cost of the project. To decide the cost for the building in this stage by making use of BIM, estimating the amount of building materials used for constructing should be preceded. In this study, the pre-design BIM is explained to gain a better understanding of its process, since this paper focused on space programming stage. Finally, the paper suggests the concept process of estimating the amount of materials in building interior finishing from selecting the type for the elements of each space made to support the client for making decisions in space programming stage based on pre-design BIM.