Public-Private Partnerships in International Development Cooperation: Avoiding the Pitfalls to Make a Difference

  • Lussier, Dr Kattie
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.30-31
    • /
    • 2015
  • PPPs in international development cooperation can be challenging due limited capacities in the country, weaknesses in terms of policy and legislative frameworks, differences in mindsets, values, work ethics and hierarchical structures as well as cultural issues. These can lead to misunderstandings and implementation problems. However, a careful assessment of the situation on the ground, stakeholder analysis and needs assessment can help to identify potential bottlenecks and address capacity constraints that could slowdown operations. A sound understanding of local power dynamics and work practices can help to put in place an exit strategy which will enhance the projects' sustainability. Making sure that goals and objectives are understood in the same way by all partners, establishing an ongoing and respectful dialogue between them, as well as transparent implementation and monitoring mechanisms can also contribute to the PPP's success and increase the likeliness to make a difference in the lives of those in needs.

  • PDF

시공책임형 CM 발주방식 공공부문 시범사업 사례를 통한 리스크 도출 (Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector)

  • 한종훈;김경태;안용한
    • 한국건설관리학회논문집
    • /
    • 제19권3호
    • /
    • pp.61-69
    • /
    • 2018
  • 현재 국내에서는 지속적으로 제기되어 오던 건설 산업의 문제를 해결하고 건설산업의 선진화 및 발주방식의 다양화를 위하여 시공책임형 CM 발주방식을 도입하였다. 그러나 시공책임형 CM 규정이 신설된지 6년이 지났음에도 불구하고 용역형 CM에 비해 계약금액 실적이 현저히 떨어지고 있으며 공공부문 시공책임형 CM 프로젝트는 전무한 실정이다. 이에 따라 공공부문 시공책임형 CM 발주방식 정착을 위해 현재 한국토지주택공사 발주로 세 개의 시범사업이 진행되고 있으나 아직 시공책임형 CM에 관련한 세부법령이 미비하여 특례를 바탕으로 시행되고 있는 중이다. 따라서 본 연구에서는 현재 진행되고 있는 세 개의 시범사업에 참여중인 실무자를 대상으로, 이후 공공부문에서 시공책임형 CM 방식이 정상도입되어 본격적으로 활용될 경우 발생 가능한 리스크를 파악하고자 하였다. 본 연구의 결과를 바탕으로 이후 제도 개선 및 법령 제정에 기초자료로 활용할 수 있을 것이다.

건설프로젝트 생애주기 BIM 활용 기능도출 및 시스템 구축 -교량공사를 중심으로- (Development of BIM Functions and System for Construction Project Through Project Life Cycle -Focusing on Bridge Construction Project-)

  • 김현승;문현석;최광열;김창학;강인석
    • 한국건설관리학회논문집
    • /
    • 제13권2호
    • /
    • pp.11-24
    • /
    • 2012
  • 최근 공공사업 발주조건에 BIM(Building Information Modeling)이 의무화되고 있고, 실무 도입을 통한 성공 사례가 증가되면서 건설 분야의 BIM 도입이 본격화되고 있다. 그러나 기존의 BIM 관련 연구는 대부분 설계 또는 시공단계에 한정되어 수행됨에 따라 건설프로젝트의 생애주기를 고려하지 못하고 있고, 특정 업무지원 기능 위주로 진행되고 있다. 따라서 본 연구에서는 건설공사 프로젝트의 기획부터 유지관리단계의 생애주기 동안 단계별 BIM 적용이 가능한 통합 BIM 운영 프로세스를 제안하고 이를 토대로 통합 BIM 시스템을 개발한다. 이를 위해 교량공사를 대상으로 수행단계별 정보체계를 분석하여 BIM 활용 기능과 적용 프로세스를 제시하였으며, 이에 근거하여 수행단계별 BIM 운영 시스템을 구축하였다. 연구에서는 개발된 시스템의 실무 적합성 검증을 위해서 사례적용과 건설 실무자의 활용성 설문 조사를 수행하였다. 이러한 BIM 통합 운영체계는 생애주기를 고려한 건설공사의 3차원 기반 통합정보관리체계로 활용성이 기대된다.

민관합동형 PF사업의 단계별 리스크 분류 및 위험도분석 (Risk Analysis and Classification of Public-Private Partenership in Project Financing Process)

  • 박혜성;김선국
    • 한국건설관리학회논문집
    • /
    • 제12권5호
    • /
    • pp.117-126
    • /
    • 2011
  • 공공-민간 합동개발 형태의 사업방식으로 시행하는 민관합동형 PF(Project Financing)사업은 2001년 도입이후 급격한 양적 증가를 가져왔으나 2008년 글로벌 금융위기 이후 심각한 침체국면을 맞이하게 되었다. 본 연구에서는 공공시설물 PF 사업의 실 사례를 바탕으로 리스크요인을 도출하고 프로젝트 진행 단계별로 리스크를 분류하여 분석하는 것이며, 단계별 리스크 요인의 위험도 및 중요도를 해당분야 실무자의 설문조사를 토대로 측정하고 리스크인자의 위험도를 산출하였다. 본 연구결과는 사업추진시 각 단계별 리스크인자를 인지하고, 리스크요인의 위험도에 따른 대응전략 수립 및 리스크 관리에 활용 되기를 기대한다.

유비쿼터스 기술을 이용한 다중집합장소의 시민서비스 고도화 방안 : 지리공간 웹 기반 서비스 제공을 중심으로 (Strategic Plan for Improvement of Citizen Service using Ubiquitous Technology on Public Area: Geospatial Web based Service)

  • 강영옥;김희원
    • Spatial Information Research
    • /
    • 제16권1호
    • /
    • pp.79-99
    • /
    • 2008
  • 유비쿼터스 기술을 실생활에 활용하고자 하는 노력은 기업은 물론 중앙정부와 지자체를 중심으로 다양한 사업 형태로 추진되고 있다. 본 연구에서는 많은 사람들이 모이는 다중집합장소를 중심으로 유비쿼터스 기술을 이용하여 시민서비스를 고도화하기 위한 전략적 추진방안을 제시하였다. 유무선 통신망을 통해 네트워크 접속이 가능해 지면서, 유비쿼터스 서비스 모델은 보편적 지도위에 참여와 협업을 전제로 하는 모델이 구상되어야 할 것으로 보인다. 이를 구현하기 위해 본 연구에서는 보편적으로 이용 가능한 디지털 지도의 구축, 디지털 지도기반의 컨텐츠 제작, 이와 관련된 유비쿼터스 시설 설치, 그리고 컨텐츠 확보를 위한 기존 홈페이지의 웹 표준화 및 자료정비, 기존자료를 인터넷지도와 연계하여 지리정보 및 속성정보 표출할 수 있도록 하는 등의 인터넷고도화 사업을 제안하였다. 향후의 유비쿼터스 서비스는 기술적 관점 뿐 아니라 그 장소를 활용하는 시민, 기업, 공공부분의 특성과 이들이 요구하는 수요에 기반 하는 서비스 모델이 개발되어야 할 것이며, 이 기반에는 지리공간 웹이 핵심이 될 것으로 판단된다.

  • PDF

건설 CALS 시스템의 기능분석을 통한 활용성 개선방안 연구 (A Study on the Utilization Improvements by Function Analysis of the Construction CALS)

  • 강인석;한동호;박남진;문현석
    • 대한토목학회논문집
    • /
    • 제31권3D호
    • /
    • pp.441-450
    • /
    • 2011
  • 최근의 건설공사는 대형화되고 있고 복잡한 시설물들을 포함하고 있으며, 공사비와 공기관리를 위해 프로젝트관리시스템(PMIS)을 적용하고 있다. 국토해양부에서도 산하 공공 발주공사의 사업관리를 위해 건설 CALS 시스템을 사용하고 있다. 본 연구에서는 현재 사용중에 있는 건설 CALS 시스템의 세부 기능 분석을 통해 적용 문제점을 도출하여 실무 활용성을 확대할 수 있는 개선 기능을 제시하고 있다. 국토해양부 산하 5개청에서 발주되는 공사는 모두 건설 CALS 시스템을 PMIS 대용으로 사용하고 있으나, 사용 기능은 제한적이고 소수의 실무진에 의해서만 활용되고 있고, 특히 CALS에 사용되는 각종 공사정보가 단편적 수치 정보로 구성되어 관리자의 정보 이해도 및 수준별 활용도가 저하되어 있는 것으로 파악되었다. 본 연구에서는 CALS 시스템의 활용성 확대를 위한 새로운 기능들의 구성방안과 정보시각화를 위해 세부 기능별로 4D 객체 연동 방안을 제시하고 있다.

공동주택 시공성 검토 및 경제성 평가를 위한 BIM 데이터 구축 가이드라인 작성에 관한 연구 (A Study on the BIM Data Guidelines for the Review of Constructability and Economic Evaluation of Apartment Houses)

  • 이해찬;김진만;이동건
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2019년도 춘계 학술논문 발표대회
    • /
    • pp.149-150
    • /
    • 2019
  • Recently, major public owner and general contractors in Korea are actively preparing and improving BIM manuals and guidelines to effectively apply BIM technology in construction projects. These guideline has a purpose to define the scope of the applying BIM technology to each construction phase and to explain the minimum technology guidance required for the initial stage. In situations where BIM data are to be submitted within a limited time and cost at the design stage, a BIM data preparing process should be carried out in advance to meet the BIM interoperability between the pre and post of construction precess. In this research, we propose the scope of the BIM guidelines to meet and to be considered for the BIM based review of constructability and economic evaluation of Apartment.

  • PDF

가락시장현대화사업 1단계 물량내역수정입찰 적용 사례 (Application of Modifiable Bid of BOQ in Garak Market Modernization Project Phase 1)

  • 조경제;김형진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.111-112
    • /
    • 2015
  • Garak Market Modernization Project Phase 1, which is the public projects worth 1,75 billion won, was delivered by adopting modifiable bid of BOQ on the lowest price award system. The modifiable bid of BOQ system allows bidders to modify quantities based on their own drawings and construction specifications and requirements. It was initiated by the government for minimizing design error and for inducing technical competition between tenders by checking errors. At that time the bidding, it allowed modifying the BOQ all the works. In the construction phase, the responsibility for the design changes, due to mistakes and omissions on design documents and BOQ were disputed between the owner and the contractors. This study analyzed the problem of the system and addressed a need of improvement.

  • PDF

DEVELOPMENT OF THE ANTI-CORRUPTION OPERATING SYSTEM ON CONSTRUCTION CONTRACTS AND PROCUREMENTS IN KOREA

  • Jee-Hye Kim;Kwang-Seop Lee;Kyung-Rai Kim;Hee-Sung Cha;Dong-Woo Shin
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1106-1111
    • /
    • 2005
  • The present Korean laws related to anti-corruption are not effective in preventing corruptions[1]. In this context, the purpose of this study is to build the proactive anti-corruption operating system that has the function to prevent corruptions from occurring in the contract and procurement sector of Korean public construction projects. The proactive anticorruption operating system consists of four parts ; developing integrity performance manual(IPM), making integrity performance plan(IPP), practicing IPP, and integrity performance evaluation(IPE). By analyzing various kinds of audits and relevant laws and interviewing with government officials and staff in construction companies, the causes and stereotypes of corruptions and the concept, role, and guide of IPM, IPP, and IPE are provided in this paper.

  • PDF

Existing Building Approval Submission Process Improvement Effect Analysis thru Utilization of BIM

  • Yeo, Chang-Jae;Yu, Jung-ho
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.664-664
    • /
    • 2015
  • Advanced countries have mandated applying BIM in construction projects. Also, Public Procurement Service has planned to mandate applying BIM to all construction project that ordered in PPS from 2016 in KOREA. However, now Seumter that is building administration system is not supported BIM based construction license BIM information from Seumter. Thus, despite the applicant is preparing a BIM model, they do not take advantage of BIM information in Seumter. In previous studies. We developed a BIM based building approval submission system. In this study, we verified the system that developed in previous research. As a result, requirement information input time reduction in Seumter system showed high satisfaction. But there was as low usability because building approval submission system cannot support some information for building approval in seumter. If the system will do utilization and management with the building approval system, the applicant can be using BIM base design document information and saving the time that takes at building approval submission. Study about the system improvement is required for application to building approval system.

  • PDF