Protective relay for transformer operates in general by comparing with the differential current and the restraint current. These kinds of currents are changed on magnitude and phasor during the fault according to winding type and vector group. This paper presents the differential and restraint currents and operational principle of differential protective relay for two-winding and three-winding transformer with graphical model. It is developed using MATLAB for an educational purpose on engineer related in power system and protection in university and power utility including large factory.
The Transactions of The Korean Institute of Electrical Engineers
/
v.61
no.3
/
pp.491-496
/
2012
There are several protective relays used to protect DC traction power supply system for DC railway. These relays, however, are made by different manufactures and they have different ways for their operations. Therefore, there are difficulties for cooperation between the devices or the devices and an upper system. In order to increase interoperability and stability of the system composed of devices made by different manufactures, IEC 61850 international standards are applied to design logical nodes for modeling protective elements used in protective relays.
In this paper, intelligent methods using digital protection relay in power management and control system is developed in order to protect power systems by means of timely fault detection during operation and control at starting for induction motor which have various load environments and capacities in power systems. The digital protective relay was designed with DSP CPU(TMS320C31) to Protect and measure more quickly and precisely. The test result on the basis of KEMCl120 and IEC60255, show that the operation time error of the digital motor protection relay is improved within $\pm$5%. Also, we can control motors at starting according to starting types with simple method as programmable sequence editor. So we can improve the demerits of high cost and much manhour for rework.
This paper represents protective management system for transmission line involving the UPFC(Unified Power Flow Controller) device, which is the most vigorous component of FACTS. The presence of the UPFC significantly affects the line parameters of transmission system, which are also influenced by the distance relay setting. Moreover, depending on the UPFC location and its parameters, zones of setting the distance relay will be changed. Therefore, established protective system should be taken into account the variable injected voltage of the UPFC and constructed data base system.
Park, Chul-Won;Seo, Jong-Wan;Jung, Ho-Sung;Shin, Myong-Chul;Lee, Bock-Ku
Proceedings of the KIEE Conference
/
1999.07g
/
pp.2902-2904
/
1999
Protective relay in power system play a prominent part, Simulators for the relay test were introduced in early 1980's, A number of open loop designs have been developed and Recently, several developments of real-time simulators have been reported. But they are very high cost. And then they are difficult to apply for relay testing in small business. This paper presents the structure and performance of a new pc based simulator for digital protective relay testing.
Park, Byung-Seok;Oh, Myun-Taek;Lee, Hwa-Joon;Cho, Hong-Keun
Proceedings of the KIEE Conference
/
1998.07e
/
pp.1846-1849
/
1998
An optical magnetic filed sensor, YIG (Yittrium Iron Garnet), response rapidly, to the power-line currents to be measured. In response to Faraday effect, it shows wide-and-linear measurable range. This paper reports the development and implementation of an OOCR (Optoelectric OverCurrent Relay) using this sensor. This relay is free from environmental electro-magnetic noises and has excellent insulation characteristics inherently. By using this OOCR, we can reduce insulation cost of protective relaying systems and its maintenance cost, and can achieve high reliability of the system.
This paper describes the current- based compact digital motor protective relay for low and high voltage induction motors, which are widely used in industrial and commercial power systems. The existing protective relays for motor protection had only overload, short circuit, reverse phase, open circuit and grounding protective elements, and measurement, start/stop control function. But in present day, for automation system, various functions are required, especially motor management and sequence control function and more. To meet these requirements, we developed an economic current-based compact digital motor protective relay which had various function to control, manage and monitor the induction motor.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.12
/
pp.6-12
/
2014
The safety and reliability of the power system short-circuit current, the short-circuit current depends on the failure to obtain the objective is to quickly eliminate the breaking capacity of the circuit-breaker selection of the cable, the insulation of electrical equipment and protective relay an important factor in determining the level correction and protective relay selection scheme to be meaningful. Standards used in the domestic circuit breaker is applied to the production of IEC standard, but the American National Standards (ANSI / IEEE) by NEMA specification of the fault current calculations and the application of the asymmetric coefficient Korea. Therefore, in this paper, the IEC 60909 standard IEC breaker fault current calculation method and the method for selection of system configurations reviewed and protection system for reviewing the configuration of various protective relays appropriate correction and the correction value is main protection, back-up protection the equipment so that the period of protection relay coordination to minimize accidents and accident protection to minimize interruptions proposed for cooperation.
Journal of Advanced Marine Engineering and Technology
/
v.33
no.8
/
pp.1232-1238
/
2009
As power facilities are getting higher at capacity, the monitoring and diagnosis of generators for fault detection and protection has attracted intensive interest. In case of an after-fault in high capacity rotating machines, the recovering cost is usually very expensive and additional time is necessary for returning in a normal situation. In this paper, we developed the protection program for the generator fault protection system and each module of the digital protective relay H/W for loading the protection program. The protective relay H/W was designed to have EMC characteristics for prohibiting from fault operation in bad power systems.
The protective relay setting of transmission systems has to consider various factors such as the protrected device, relay type and system conditions and it requires the empirical knowledge of experts. In this study. The setting rules have been accumulated in Oracle DB and its inference scheme has been devised. Their applications to relay setting system are expected to refine the setting knowledge enhancing the accuracy and consistency of the relay setting.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.