• Title/Summary/Keyword: Protection measure

Search Result 598, Processing Time 0.028 seconds

A Study on Measurements of IT Security Service Quality : Feasibility of Quantitative Measures (IT 보안 서비스 품질의 측정 방법에 관한 연구 : 정량 지표의 사용 가능성)

  • Kyung, Ji Hoon;Kim, Chong Su
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.4
    • /
    • pp.30-38
    • /
    • 2015
  • IT security service provides customers with the capability of protecting the networked information asset and infrastructures, and the scope of security service is expanding from a technology-intensive task to a comprehensive protection system for IT environment. To improve the quality of this service, a research model which help assess the quality is required. Several research models have been proposed and used in various service areas, but few cases are found for IT security service. In this work, a research model for the IT security quality has been proposed, based on research models such as SERVQUAL and E-S-QUAL. With the proposed model, factors which affect the service quality and the best quality measure have been identified. And the feasibility of using quantitative measures for quality has been examined. For analysis, structural equation modeling and various statistical methods such as principal component analysis were used. The result shows that satisfaction is the most significant measure affected by the proposed quality factors. Two quality factors, fulfillment and empathy, are the main determinants of the service quality. This leads to a strategy of quality improvement based on factors of emotion and perception, not of technology. The quantitative measures are considered as promising alternative measures, when combined with other measures. In order to design reliable quantitative measures, more work should be done on target processing time and users' expectation. It is hoped that work of this research will provide efficient tools and methods to improve the quality of IT security service and help future research works for other IT service areas.

Safety Measure Developed Through Analysis of Firefighters' 『Investigation Report on Accidents to On-Site Workers』

  • Jo, Chang-Hyun;Kong, Ha-Sung
    • International Journal of Advanced Culture Technology
    • /
    • v.9 no.3
    • /
    • pp.334-344
    • /
    • 2021
  • The study has suggested a way to minimize safety accidents found in on-site firefighting activity by analyzing firefighters' [investigation report on accidents to on-sie workers]. The study result is described as follows. First, the result of [investigation report on on-site workers] shows that while accidents are found to most frequently have occurred to low-ranking firefighting officers such as Sobangsa and Sobanggyo and firefighting officers with career of less than 5 years, fire-extinguishing activity proved to be the most prone to accidents in the category of activity. Second, analysis performed to identify variance between injury extent and area based on cause of accident shows statistically significant variance. In addition, the result of verifying difference in cause of accident based on category of activity shows significant difference with 'falling over and sliding' being the highly likely cause of accident in fire containment and rescue activities and 'reckless move' being highly likely case of accident in emergency activities. Third, the result of verifying factors behind the extent of injury done to on-site workers shows that when accident is caused by 'incomplete behavior', it was found that the extent of injury is substantial. It was also found that rescue activity is accompanied by substantial extent of injury. As a solution to this, the study suggested ways to establish, extend and operate safety-specific curriculum for entrants, develop materials regarding risk prognosis training and explicate training-related regulations, set up safety management measure for a single squad team, upgrade performance of private protection equipment, institutionalize SOP by on-site activity stage, materialize and activate swift rescue team and increase objectivity and proficiency of safety accident investigation.

Quantification of Ceruloplasmin in Wale Rats Exposed to ${\gamma}$-radiation by Enzyme Linked Immunosorbent Assay (ELISA방법에 의한 방사선 피폭 후 흰쥐 혈액 내에서의 ceruloplasmin 정량)

  • Kim, In-Gyu;Park, Seon-Young;Kim, Kug-Chan;Lee, Kang-Suk
    • Journal of Radiation Protection and Research
    • /
    • v.22 no.2
    • /
    • pp.103-109
    • /
    • 1997
  • Adult male rats were exposed to a whole body with a single dose of 1.0, 2.0, 3.0, 5.0, and 7.0 Gy. The animals were sacrificed 48, 72, 96 and 216 hours following exposure. A competitive enzyme linked immunosorbent assay(ELISA) with antigen immobilized on the solid phase has been developed to measure ceruloplasmin in rat serum and complete dose response curves. Ceruloplasmin was purified from the plasma of turpentine treated male rats. Coating of ceruloplasmin had more effectiveness in 10 mM Tris-HCI, 150 mM sodium chloride, pH 7.4 than in 50 mM carbonate/bicarbonate buffer, pH 9.6. The coating range for ceruloplasmin was $70{\sim}140ng$/well. Levels of ceruloplasmin increased to maximum on the $72{\sim}96$ hours after irradiation. Slope of between response and dose was greatest value 96 hours following irradiation. Normal ceruloplasmin levels were not recorded 216 hours following exposure. In 0.1 Gy irradiated group, levels of ceruloplasmin also increased to maximum on the $72{\sim}96$ hours following irradiation. The concentration of this protein remained significantly different from control value, 196 hours after exposure. Ceruloplasmin was identified as one of the major acute phase protein following irradiation and further studies about gene expression and regulation would be necessary for radiation protection.

  • PDF

A Study on the Development of Solid Reference Electrode and Remote Protection Potential Measuring System (고체기준전극 및 원격전위측정 시스템 개발에 관한 연구)

  • Ryou, Young-don;Kim, Jin-Jun;Kim, Dong-Kyun
    • Journal of the Korean Institute of Gas
    • /
    • v.19 no.3
    • /
    • pp.38-43
    • /
    • 2015
  • For buried gas pipelines, cathodic protection system shall be installed to protect against corrosion. The surveys of pipe-to-soil potentials for the gas pipelines should be carried out at the test box more than once a year. In urban, the test box is usually located on the driveway, therefore, it is difficult to measure the potentials. That is, traffic control is needed when carrying out the measurements of the potentials on daytime, or measurements of pipe-to-soil potentials at the test box located on the driveway have to be carried out in the late night when the traffic is light. We have developed remote potential monitoring system using the solid reference electrode and the wireless communication technology for the purpose of removing above problems. We have installed the developed solid reference electrodes at a site and monitored the potentials by wireless communication. Measured potential values were transferred to the server in office and analyzed. We have found the pipe-to-soil potentials transferred to the web server make no difference to the potentials measured directly on the site.

Safety and efficacy of modified-live infectious laryngotracheitis vaccines (닭 전염성 후두기관염 생독백신의 안전성과 효능)

  • Han, Myung-Guk;Lee, O-Soo;Kim, Jea-Hong
    • Korean Journal of Veterinary Research
    • /
    • v.42 no.2
    • /
    • pp.241-251
    • /
    • 2002
  • Modified-live (ML) infectious laryngotracheitis (ILT) vaccines have been widely used as a preventive measure in Korea since the first outbreak of ITL. Recently, it has been observed that chickens vaccinated with the commercially available ML ILT vaccine have sometimes exhibited adverse clinical signs. In this study, we evaluated the quality of the vaccines by comparing titer of each vaccine batch and testing the stability of ILT virus (ILTV) in vaccine diluents and compared the safety and efficacy of vaccines in specific pathogen free (SPF) chickens. The ratio of maximum titer to minimum titer of vaccine produced by most manufacturers was 2 to 15. However, 2 out of 11 manufacturers produced vaccines of which the ratio was 74 to 478. Most vaccines examined were maintained vaccine titers suitable for national regulations within expiry date. However, some vaccines did not keep the titer required for the national regulations. In the test for stability of ILTV in various diluents, ILTV was highly stable in lactose-phosphate-glutamine-gelatin solution, sucrose-phophate-glutamine-albumin solution and some vaccine diluents produced by manufacturers. The safety of ML ILT vaccines was assessed in 10-day-old SPF chicks. Mortality in SPF chicks inoculated intratracheally with one dose of vaccine varied depending on vaccines and some vaccines produced 50-85% mortality. Seven-week-old SPF chickens were vaccinated intraocularly with ML ILT vaccines and then challenged intratracheally with ILT challenge virus 14 days after vaccination. The protection rate was assessed by clinical signs and reisolation of the ILT challenge virus from tracheas taken at day 4 after challenge. There were slight respiratory reactions in some vaccinated chickens after vaccination but these reactions disappeared within 5 days after vaccination. No further clinical signs and death were observed. Protection rate determined by clinical signs and mortality was 100% in all vaccinated groups. However, the challenge virus was isolated from all tracheas of chickens vaccinated with vaccine B or control groups. The challenge virus was also isolated in the trachea of one in five chickens vaccinated with either vaccine F or K, but not in tracheas of chickens vaccinated with other vaccines. In the present study, the stability of vaccine diluents, pathogenicity and protection rate based on reisolation test of the challenge virus were different depending on vaccines produced by eleven manufacturers.

Experimental evaluation of fire protection measures for the segment joint of an immersed tunnel (침매터널 세그먼트조인트의 내화 대책에 대한 실험적 평가)

  • Choi, Soon-Wook;Chang, Soo-Ho;Kim, Heung-Youl;Jo, Bong-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.13 no.3
    • /
    • pp.177-197
    • /
    • 2011
  • In this study, a series of fire experiments under $HC_{inc}$ and ISO834 (duration of 4 hour) fire scenarios were carried out for three different types of fire protection measures for the segment joint to evaluate their applicabilities to an immersed tunnel. The experimental results revealed that an expansion joint installed to allow relative movements between concrete element ends in an segment joint is the most vulnerable to a severe fire. For the fire protection measure where the originally designed steel plates at an expansion joint arc replaced by fire-resistant boards, the experiments showed that they cannot achieve good fireproofing performance under both $HC_{inc}$ fire scenario and ISO834 (4 hour) fire scenarios since the installation of fire-resistant boards results in the reduction of the sprayed fire insulation thickness. On the other hand, the application of modified bent steel plates replacing the original steel plates was proved to be very successful in fireproofing of the expansion joint due to more sprayed materials filled in bent steel plate than in the original design concept as well as higher adhesion between the steel plate and the sprayed fire insulation layer.

Interim Relief in International Commercial Arbitration (국제상사중재(國際商事仲裁)에 있어서 중간보전조치(中間保全措置))

  • Lee, Kang-Bin
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.13
    • /
    • pp.131-149
    • /
    • 2000
  • In connection with international commercial arbitration the need to seek interim relief is generally recognized. Interim reliefs address the requirements of a party for immediate and temporary protection of rights or property pending a decision on the merits by the arbitral tribunal. The most common forms of interim relief are attachments and injunctions. If the arbitral tribunal has not yet been appointed, an application for interim relief must usually be addressed to the local courts at the place of commercial arbitration. If the arbitral tribunal has been appointed, the application for interim relief is first made to the arbitral tribunal. Interim relief by the arbitral tribunal is in the form of a direction to the parties. Since the arbitral tribunal has no enforcement power, it may be necessary to have a arbitral tribunal's direction confirmed by a local court which can enforce its order. The New York Convention does not provide for interim reliefs. The question is whether Article II(3) of the New York Convention that the court "shall, at the request of one of the parties, refer the parties to arbitration" denies jurisdiction to courts to grant interim reliefs in international commercial arbitration. Some cases have indicated that the U. S. court have no power to grant interim relief. Other cases have indicated that the U. S. courts do have the power to grant interim relief. It is unlikely that a U. S. court will order interim relief in relation to an commercial arbitration in a foreign country. Article 26 of the UNCITRAL Arbitration Rules provides with respect to interim measures of protection. Section 1 of Article 26 of UNCITRAL Arbitration Rules provides that the arbitral tribunal may take any interim measures it deems necessary in respect of the subject matter of the dispute, including measures for the conservation of the goods forming the subject matter in dispute. This article gives the arbitral tribunal the broadest authority, not limited to safeguarding property. Article 17 of the UNCITRAL Model Law on International Commercial Arbitration provides that the arbitral tribunal may order any party to take such interim measure of protection as the arbitral tribunal may consider necessary in respect of the subject matter of the dispute. It may be noted that the article does not deal with enforcement of such measures. The International Chamber of Commerce Rules of Conciliation and Arbitration do not expressly empower the arbitral tribunal to grant interim reliefs. However, Article 8.5 of the ICC Rules of Conciliation and Arbitration provides that the parties shall be at liberty to apply to any competent judicial authority for interim measures. In conclusion, the power of the arbitral tribunal to provide interim reliefs is generally recognized in the arbitration rules of arbitral institutions. However, the arbitral tribunal's authority is limited by its lack of enforcement mechanisms. It is generally recognized that the local courts have power to grant interim reliefs in aid of an commercial arbitration. However, local courts are reluctant to grant interim reliefs if that decision requires an adjudication of issues within the special competence of the arbitral tribunal.

  • PDF

A Numerical Study to Analyze Safety of Pressure Leakage Monitoring System of Gas Extinguishing Agent (가스소화약제 압력누기감시장치의 안전성 분석을 위한 수치적 연구)

  • Go, A-Ra;Lim, Dong-Oh;Son, Bong-Sei
    • Fire Science and Engineering
    • /
    • v.30 no.4
    • /
    • pp.103-110
    • /
    • 2016
  • While the demand for the gas system fire extinguishers increases every year, there are insufficient safety measures for assessing the extinguishing performance, such as system safety and reliability in the preparation of increasing demand, which has emerged as a social problem. One of the most critical causes of accidents occurring with the gas extinguishing system is pressure leakage from the extinguishing agent storage container. This is considered to be one of the critical factors on which the success of fire suppression depends. In this study, its safety measure was studied, Because it was deemed urgently necessary. The newly developed pressure leakage monitoring system is a system monitoring storage condition, pressure, leakage and discharge of the storage container related to agent concentration, which is one of the critical factors for fire suppression. This was developed to be applicable to the $CO_2$ and HFC-23 systems. Therefore, for structural safety analysis, the safety performance was verified by the fluid structure coupling analysis of the safety problems that may occur when the pressure leakage monitoring system is applied to the gas fire extinguisher. For analysis programs, the FloEFD program from Mentor Graphics was used for computational fluid dynamics analysis and ABAQUS from Dassault Systems was used for structural analysis. From the result of numerical analysis, the structure of $CO_2$ did not develop plastic deformation and its safety was verified. However, plastic deformation and deviation issue occurred with the HFC-23 monitoring system and therefore verified the structural safety of pressure leakage monitoring system by data obtained from redesigning and adjusting the condition of numerical interpretation three times.

Effects of Fine Aggregate Size on Penetration Performances of SSPM (잔골재의 입도분포가 SSPM의 침투성능에 미치는 영향)

  • Yoon, Hyun-Kwang;Youn, Da-Ae;Lee, Chan-Woo;Park, Wan-Shin;Yun, Hyun-Do
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.3
    • /
    • pp.25-31
    • /
    • 2019
  • This study was conducted to evaluate the penetration performance of the Silane Surface Protection Material (SSPM) penetrating the micro pore of concrete surface. The results was indicated microstructure, porosity and penetration depth of applied SSPM. Silica sand and conventional sand were used as fine aggregate in mortar. And liquid and cream types SSPM were used. The amounts of SPM were applied the 127, 255, 382, 510 g/m2 on the surface of mortar. The penetration depth specimens were made with $100{\times}30mm$ in according with KS F 4930. Penetration depth was evaluated according to KS F 4930, divide specimen and then spraying with water in cross section of specimens, and measure the depth of the non-wetted area. The microstructure result of mortar applied SSPM, it was obtained liquid and cream SSPM in mortar. The porosity results of SSPM application specimens were improved with than that of plain specimens. Test results indicated that the penetration depth of SPM were improved with increasing in amounts of SSPM. As a result of test, application of SSPM to concrete surface, it will improve durability.

A Study on the Conservation and culturalization of Archaeological Heritage - On the emphasis of ordering better legitimacy and management system - (고고 유산의 보호 원리와 보존 활용 방안에 대하여 - 법(法)과 제도의 비교 고찰을 중심으로 -)

  • Jang, Ho-su
    • Korean Journal of Heritage: History & Science
    • /
    • v.40
    • /
    • pp.5-34
    • /
    • 2007
  • Archaeological Heritage is material testimony of national and regional history, and it is one of the tourist's attractions. So it has very important meaning and identical value for a local residents. Public concern on the heritage site elevate higher day by day. They are willing to use it for a multiful purpose, cultural, educational, and even commercial one. But Archaeological Heritage is fragile, and visitors can impact negatively for protection and management of the authenticity on the heritage site. In this research I try to compare legal and administrative measure for the protection, management, and culturalization of Archaeological Heritage in many countries. And I suppose sustainable and practical strategies for keeping integrity of heritage.