• Title/Summary/Keyword: Proper Construction Cost

Search Result 206, Processing Time 0.02 seconds

Estimation of Optimal Size of the Treatment Facility for Nonpoint Source Pollution due to Watershed Development (비점오염원의 정량화방안에 따른 적정 설계용량결정)

  • Kim, Jin-Kwan
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.6
    • /
    • pp.149-153
    • /
    • 2008
  • The pollutant capacity occurred before and after the development of a watershed should be quantitatively estimated and controlled for the minimization of water contamination. The Ministry of Environment suggested a guideline for the legal management of nonpoint source from 2006. However, the rational method for the determination of treatment capacity from nonpoint source proposed in the guideline has the problem in the field application because it does not reflect the project based cases and overestimates the pollutant load to be reduced. So, we perform the standard rainfall analysis by analytical probabilistic method for the estimation of an additional pollutant load occurred by a project and suggest a methodology for the estimation of contaminant capacity instead of a simple rational method. The suggested methodology in this study could determine the reasonable capacity and efficiency of a treatment facility through the estimation of pollutant load from nonpoint source and from this we can manage the watershed appropriately. We applied a suggested methodology to the projects of housing land development and a dam construction in the watersheds. When we determine the treatment capacity by a rational method without consideration of the types of projects we should treat the 90% of pollutant capacity occurred by the development and to do so, about 30% of the total cost for the development should be invested for the treatment facility. This requires too big cost and is not realistic. If we use the suggested method the target pollutant capacity to be reduced will be 10 to 30% of the capacity occurred by the development and about 5 to 10% of the total cost can be used. The control of nonpoint source must be performed for the water resources management. However it is not possible to treat the 90% of pollutant load occurred by the development. The proper pollutant capacity from nonpoint source should be estimated and controlled based on various project types and in reality, this is very important for the watershed management. Therefore the results of this study might be more reasonable than the rational method proposed in the Ministry of Environment.

Determining the Size of a Hankel Matrix in Subspace System Identification for Estimating the Stiffness Matrix and Flexural Rigidities of a Shear Building (전단빌딩의 강성행렬 및 부재의 강성추정을 위한 부분공간 시스템 확인기법에서의 행켈행렬의 크기 결정)

  • Park, Seung-Keun;Park, Hyun Woo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.2
    • /
    • pp.99-112
    • /
    • 2013
  • This paper presents a subspace system identification for estimating the stiffness matrix and flexural rigidities of a shear building. System matrices are estimated by LQ decomposition and singular value decomposition from an input-output Hankel matrix. The estimated system matrices are converted into a real coordinate through similarity transformation, and the stiffness matrix is estimated from the system matrices. The accuracy and the stability of an estimated stiffness matrix depend on the size of the associated Hankel matrix. The estimation error curve of the stiffness matrix is obtained with respect to the size of a Hankel matrix using a prior finite element model of a shear building. The sizes of the Hankel matrix, which are consistent with a target accuracy level, are chosen through this curve. Among these candidate sizes of the Hankel matrix, more proper one can be determined considering the computational cost of subspace identification. The stiffness matrix and flexural rigidities are estimated using the Hankel matrix with the candidate sizes. The validity of the proposed method is demonstrated through the numerical example of a five-story shear building model with and without damage.

Pollutants Removal Efficiency of Rainfall-runoff from Dense Highland Field Areas in Multistage Sedimentation Basins - Focused on Jaun Area in Upstream Watershed of Lake Soyang - (고랭지 밭 밀집지역 다단계 침사지의 강우-유출 오염물질 제거 효율 - 소양호 상류의 자운지구를 중심으로 -)

  • Cho, Jae Heon
    • Journal of Environmental Impact Assessment
    • /
    • v.27 no.2
    • /
    • pp.170-180
    • /
    • 2018
  • Highland fields are concentrated in the Jaun area of Hongcheong-gun, a large amount of sediments are discharged from the highland fields. The sediment runoff affect the turbidity and water quality of the Soyang Lake, furthermore adversely affect water supply source of the capital region. There are several kinds of BMPs(Best management practices) to decrease the sedimentrunoff from the highland fields. Although construction cost of multistage sedimentation basins is very high, there is no actual survey data for the removal efficiency of suspended sediments and water quality in our country. In this study, stormwaterinflow and outflow of the multistage sedimentation basins were surveyed, and the removal efficiency of nonpoint source pollutants were analyzed. The stormwater survey results fortwo rainfall events show thatremoval efficiencies of SS, BOD and TP loads in the multistage sedimentation basins are 35%~62%, 24%~55%, 35%~58%, respectively. Although the measured efficiencies of the basins were lower than the theoretical efficiency, the proper operation and management can improve the removal rate of the basins. Turbid water problem in the upper parts of the Soyang River can be managed effectively through the additional installation of multistage sedimentation basins.

A Study on the Water Reuse Systems (중수도개발연구(中水道開發研究))

  • Park, Chung Hyun;Lee, Seong Key;Chung, Jae Chul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.4 no.4
    • /
    • pp.113-125
    • /
    • 1984
  • Water supply has been mainly dependent on the construction of the dams in Korea. It is difficult, however, to continue to construct dams for many reasons, such as the decrease of construction sites, the increase of construction costs, the compensation of residents in flooded areas, and the environmental effects. Water demands have increased and are expected to continue increasing due to the concentration of people in the cities, the rise of the living standard, and rapid industrial growth. It is acutely important to find countermeasures such as development of ground water, desalination, and recycling of waste water to cope with increasing water demands. Recycling waste water includes all means of supplying non-potable water for their respective usages with proper water quality which is not the same quality as potable water. The usages of the recycled water include toilet flushing, air conditioning, car washing, yard watering, road cleaning, park sprinkling, and fire fighting, etc. Raw water for recycling is obtained from drainage water from buildings, toilets, and cooling towers, treated waste water, polluted rivers, ground water, reinfall, etc. The water quantity must be considered as well as its quality in selecting raw water for the recycling. The types of recycling may be classified roughly into closed recycle systems and open recycle systems, which can be further subdivided into individual recycle systems, regional recycle systems and large scale recycle system. The treatment methods of wastewater combine biochemical and physiochemical methods. The former includes activated sludge treatment, bio-disc treatment, and contact aeration treatment, and the latter contains sedimentation, sand filtration, activated carbon adsorption, ozone treatment, chlorination, and membrane filter. The recycling patterns in other countries were investigated and the effects of the recycling were divided into direct and indirect effects. The problems of water reuse in recycle patterns were also studied. The problems include technological, sanitary, and operational problems as well as cost and legislative ones. The duties of installation and administrative organization, structural standards for reuse of water, maintenance and financial disposal were also studied.

  • PDF

A Study on the Leakage Protection with Polypropylene Mat in Irrigation Canal (Polypropylene Mat에 의(依)한 용수로(用水路)의 누수방지(漏水防止)에 관(關)한 연구(硏究))

  • Kang, Sin-Up;Kang, Yea-Mook;Cho, Seung-Seup
    • Korean Journal of Agricultural Science
    • /
    • v.6 no.2
    • /
    • pp.166-184
    • /
    • 1979
  • In order to prevent the water loss in the irrigation canal constructed on the sandy gravel layer or on the other highly permeable ground layer, lining has been practiced. Many studies have been done so far on the lining method to prevent the water loss in the irrigation canal and recently studies on the lining with plastic film or polyethylene film were also reported. However, the plastic film or polyethylene film has low strength and is liable to break, and water loss from pin hole caused by contacting with sand or gravel is highly predicted. This study was then conducted to find proper lining and buring method in canal construction of polypropylene mat after coated with vinyl, as one way to overcome the shortcoming frequently observed when plastic or usual polyehtylene film were used. Eventhough rather longer periods of experiments are needed to attain reliable and accurate results on the variation of durability, the durability of asphalt coated area, or on the damage due to freeze after burial or exposure of polypropylene mat, the experiemental results obtained during one year of period are summarized as follows: 1. The curvature at the area between canal bottom and side slope had increased stability and saved consruction cost. The relationship among the variation of curvature, the reduction of polypropylene mat and the reduced amount of soil cutting at each side slope was presented in Fig. 7 through 9. 2. The depth of covering material to protect polypropylene mat was desired to be over 30cm, considering the water depth, side slope, canal cleaning practices, traffic, or back pressure of irrigation period. 3. In order to increase the canal stability and to prevent slope erosion, sandy soil was required, to be placed under ground, and coarse gravel should cover the surface area of canal. 4. The studies on the stability of side slope in the canal should consider the passive area on the bottom and the slope should be about 1 to 2, considering the slope stability, allowable velocity and tractive force. 5. When compared with earth lining, the lining with polypropylene mat coated with vinyl was responsible to save 28% and 37% of canal lining cost, when the soil carrying distances were 500 and 700m. respectively. 6. The water interception was almost completely attained when the polypropylene mat coated with vinyl was used for lining. But further studies were assumed to be necessary for the use of asphalt since the strength of polypropylene mat connected with asphalt will vary with duration.

  • PDF

A Study on the Properties of Plywoods Constructed by Sycamore and Lauan Veneer (푸라타누스와 나왕단판(羅王單板)을 구성(構成)한 합판(合板)의 성질(性質)에 관(關)한 연구(硏究))

  • Lee, Phil Woo
    • Journal of Korean Society of Forest Science
    • /
    • v.30 no.1
    • /
    • pp.8-18
    • /
    • 1976
  • This study was carried out to exploit and utilize the exotic American Sycamore(Platanus occidentalis) grown in Korea as a veneer species for plywood manufacture. At present most parts of veneer Legs used in Korea were depended entirely upon the gonus Shorea woods(lauan logs) imported from Southeast Asia region. To decrease manufacturing cost and save imported lauan veneer logs, the effects on properties affecting to the six types of plywood made from proper veneer constructions composed by domestic American Sycamore and imported lauan veneers were compared and discussed. The study has important meanings for the promotion of plywood manufacture by domestic materials. Important items dealt with this study were dry and wet shear strength, moisture contents, specific gravties, and bending strength. By the results and discussions it may be summarized as follows: 1) In dry shear strength platanus(sycamore) core lauan plywood was shown most excellent strong results, and next orders were all lauan plywood, platanus faced lauan plywood, lauan core platanus plywood, lauan faced platanus plywood, and all platanus plywood. There was no difference between platanus core lauan plywood and all lauan plywood, but the differences between those plywoods and the other types of plywood were recognized. 2) In wet shear strength platanus core lauan plywood was shown excellent result the same as dry strength. The difference between platanus core lauan plywood and the other types of plywood was shown, but among the other types of plywood except platanus core lauan plywood were not recognized. 3) The differences among moisture contents according to the veneer construction were not recognized. 4) The plywood constructed by two or more sheets of lauan veneer was shown lower specific gravities than the plywood constructed by two or more sheets of platanus veneer. It is believed that this tendency due to the original specific gravities of veneer before construction. 5) The differences among specific gravities of lauan core platanus plywood, all platanus plywood and lauan faced platanus plywood were not recognized, and like this analyzed result among platanus core lauan plywood, all lauan plywood and platanus faced lauan plywood were not recognized. Accordingly it is believed that the differences are not shown among the plywood constructed by two or more veneers of same species. 6) In bending strength platanus core lauan plywood was shown most excellent values. Next orders were all lauan plywood, platanus faced lauan plywood and the other types of plywood. The differences among the plywood constructed by two or veneers of lauan were shown, but not shown among the plywood constructed by tow or more veneers of platanus.

  • PDF