The 9th International Conference on Construction Engineering and Project Management
/
pp.50-56
/
2022
Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.
The 10th International Conference on Construction Engineering and Project Management
/
pp.831-838
/
2024
Public construction projects have a significant impact on the local residents' economy and social lives due to their large scale and construction costs. If residents suffer losses and damages from public construction projects, it can lead to complaints, which can negatively affect to the projects, such as cost overrun and schedule delay. Therefore, the managerial efforts should be made to minimize these complaints. The purpose of this study is to analyze the complaints associated with construction projects based on their characteristics and assess the impact of complaints on the projects, aiming to minimize the complaints arising from construction projects. This study is conducted in three steps: 1) extracting the complaints' information from the existing construction projects, 2) analyzing the complaints based on projects characteristics using post-evaluation data, and 3) analyzing how the complaints are actually handled. Through this study, it is possible to understand the characteristics of complaints in actual public construction projects in Korea.
The purpose of this study was to find the effects and problems in the support projects in multicultural family support centers and to present suggestions for its improvement. For this purpose, 10 specialists in 3 multicultural family support centers in Daegu, who organize and operate projects for female immigrants and their families, were interviewed via focus groups and then interviewed in-depth. The major findings were as follows: 1) the effect of the support projects was an increase in participation and concern of female immigrants and their families; 2)problems of the support projects included lack of flexibility of the projects, and overlap of projects among centers. 3)The results of the study suggest improved operation by extending the support networks to other support centers and facilities within the community, increasing the individualized programs based on their specialties, and promoting integrated projects (such as combining language courses and cultural programs, family-support programs and cultural events). Further studies will be extend to find out model cases from support projects of several centers, expand them to other centers, and verify its effects on operating projects.
Assessment in Socio-economic items should be used to estimate social influence when policies and projects were introduced. To estimate current situation of socio-economic items 19 Environmental Impact Statement (EIS) of large scale projects were analyzed. The projects were selected based on magnitude of social impact when the projects were implemented. Environmental Impact Statement was categorized into line projects(road construction, railroad construction, stream development, etc), and surface projects(energy development, wetland reclamation, recreation and sport development, and housing and residential development, etc) thus being chosen for 19 projects in each categories. This report was based on the analysis of 7 items in socio-economic environmental items(i.e., population, residents, industry, public facilities, education, transport and historical monument). Most EIS did not follow the regulation suggested by Ministry of Environment, and only current circumstances were briefly described. Indifference of in-depth analysis of socioeconomic environmental items would influence the process of social and environment impact negatively in the midst of construction of National Projects such as Outer Circle Seoul Highways, Saemankeum Reclamation Projects, etc. This abrupt halt of construction was mostly based on a lack of public hearing or public participation. Socio-economic items are also very much lacking in quantitative method and strengthening socio-economic environmental items is needed via checklist or matrix that brings decision-makers better ideas objectively.
The 9th International Conference on Construction Engineering and Project Management
/
pp.245-252
/
2022
Risk identification for bridge projects is a knowledge-based and labor-intensive task involving several procedures and stakeholders. Presently, risk information of bridge projects is unstructured and stored in different sources and formats, hindering knowledge sharing, reuse, and automation of the risk identification process. Consequently, there is a need to develop structured and formalized risk information for bridge projects to aid effective risk identification and automation of the risk management processes to ensure project success. This study proposes a semantic risk breakdown structure (SRBS) to support risk identification for bridge projects. SRBS is a searchable hierarchical risk breakdown structure (RBS) developed with python programming language based on a semantic modeling approach. The proposed SRBS for risk identification of bridge projects consists of a 4-level tree structure with 11 categories of risks and 116 potential risks associated with bridge projects. The contributions of this paper are threefold. Firstly, this study fills the gap in knowledge by presenting a formalized risk breakdown structure that could enhance the risk identification of bridge projects. Secondly, the proposed SRBS can assist in the creation of a risk database to support the automation of the risk identification process for bridge projects to reduce manual efforts. Lastly, the proposed SRBS can be used as a risk ontology that could aid the development of an artificial intelligence-based integrated risk management system for construction projects.
Oral health projects that cater to the disabled should be more prevailing in order to ensure the maintenance and successful promotion of the oral health of disabled people. 70 public dental clinics that conducted oral health projects geared toward the disabled were examined to get a precise grip on their oral health projects. The findings of the study were as follows: 1. 31 out of 70 public dental clinics investigated(44.3%) were equipped with two or more dental hygienists who were professional human resources in charge of the oral health projects for the disabled. As for the age and disability type of the beneficiaries of the oral health projects, adolescents(74.3%) and people with mental retardation(87.1%) benefited most from the oral health projects. Concerning the most common implementation frequency of the projects, the projects were carried out once to three times a week(62.9%). 2. The most dominant oral disease treatment provided to disabled people was amalgam treatment and resin treatment(68.6%), which were the early dental caries treatment. The most common preventive treatment that was offered to improve their oral health was oral prophylaxis(82.9%). As for reform measures for the oral health projects, education of personnels in charge of the projects and their specialization(58.6%) were most emphasized. 3. Regarding factors related to the preventive oral health projects for the disabled, the implementation of oral prophylaxis and toothbrushing education was linked to the age of the beneficiaries. More oral prophylaxis was offered to teens, and more toothbrushing education was provided to preschoolers and adolescents. The age of the beneficiaries and the number of dental hygienists responsible for the projects had something to do with the application of fluorides. 4. Concerning the relationship of the preventive oral health projects for the disabled to the number of dental hygienists, one of the personnels in charge of the projects, the application of fluorides( 54.4%) and pit & fissure sealing(56.8%) were more prevalent when there were two or more dental hygienists. There was a statistically significant disparity in that regard(p<0.05). The above-mentioned findings illustrated that in order to boost the oral health of the disabled, dental hygienists who are responsible for the oral health projects for the disabled should put ceaseless efforts into fostering their professional knowledge and ability and offering quality service to disabled patients. Every public dental clinic should be equipped with plenty of professional personnels to enlarge the scope of treatment and ensure the efficiency of treatment and the preventive projects.
Desertification has been expanding with a remarkable speed across the Northeast Asia. Desertification in Northeast Asia significantly influences Korea's economy and environmental health conditions in recent years. For these reasons, a number of non-governmental organizations (NGOs) in Korea have carried out the reforestation projects to combat desertification in China and Mongolia. Several tree plantation projects were implemented in Mongolia and China. The objective of this study was to analyze and evaluate the performance of tree plantation aid projects carried out by Korean NGOs in Mongolia. The performance of tree plantation projects was examined through effectiveness, efficiency, equity and responsiveness of those projects. The performance was analyzed with the survival rate of planted trees and planting cost, the recognitions of Mongolian people. The analysis of the performance showed that the tree plantation cooperation projects carried out by Korean NGOs in Mongolia had comparatively high performance from a larger point of view. Especially, effectiveness and responsiveness of their projects were highly marked in spite of all the difficulties of carrying out the tree plantation. Such a high effectiveness represented the relatively higher survival rates of trees and Mongolian's positive recognition of plantation projects. Furthermore, the responsiveness also turned out to be high with a great satisfaction of the Mongolian people for plantation projects conducted by the Korean NGOs. Survey results indicated that the efficiency and equity of the projects would be increased by promoting the cooperation projects for tree planting throughout Mongolia with reinforcing infrastructures. By comparison between Korean NGOs and Mongolian Government plantation projects, confirmed the importance of sustained financial support and maintenance activities in the plantation sites.
Since a government design department office was set up in 2007, active design projects have been implemented. With this opportunity, each local self-governing organization has improved its administration and institutions, and are planning intensive research on public design for efficient execution of public design projects. However, recent public design projects have caused many problems due to unspecialized design processes, a lack of cooperation with relevant organizations, and unsatisfactory management systems after projects. Therefore, to overcome such problems in the execution of public design projects, a procedure-centered model should be developed. This study aims to analyse the process structures for the strategic execution of public design projects, and the methods and content of the execution process. For this purpose, this study looked into the process structures of public design projects based on design management strategies in order to draw suggestions needed for the execution process through advanced cases. The study is summed up as follows: First, when the process of public design projects was examined in terms of management strategies and design management strategies, it included two dimensions: the management structure of general projects and the design of development projects. Secondly, through the analysis of public design cases, this study discovered useful methodologies and the main programs used and drew suggestions needed for each step in public design projects. It is expected that the results of this study will be helpful for the development of a process model appropriate for national public design projects based on the current status of the project execution and to make a contribution to systematic development in national public design.
The 3th International Conference on Construction Engineering and Project Management
/
pp.1509-1514
/
2009
CII BM&M(Benchmarking & Metrics) in USA and DTI(Department of Trade and Industry) in UK have built up systems that enable performance measuring and made the results of performance measurement comparable between projects to utilize them as benchmarking tools. By comparing the results of performance measurement, it is possible to grasp the success level of project management and to establish the direction of management. However, construction projects are much diversified and even those projects with the same work type have different attributes. Therefore, simply comparing the results of project performance measurement without considering the characteristics of projects is not justifiable and affects the reliability of the benchmarking results. Therefore, to solve this problem, this study presents a methodology that makes it possible to compare the individual construction projects considering various characteristics. The benefits and importance of project characteristics to overall project performance will be quantitatively expressed and they will be reflected on the results of performance management. By maximally converting multiple projects with different characteristics into the same projects through a new methodology to convert different projects into the same level utilizing such utility-bases and comparing the performances of those projects, project performance results can be utilized in project management as a tool for more accurate decision making and as a robust benchmarking tool.
The 10th International Conference on Construction Engineering and Project Management
/
pp.1129-1136
/
2024
Official Development Assistance (ODA) is widely known as an essential source for socioeconomics of development of developing countries, especially in the infrastructure sector. Since 2023, the use of BIM is regarded as a mandatory task for public-funded projects including ODA projects in Vietnam. However, ODA projects require a coordination in project management and implementation between the lenders and the borrowers which are different in BIM standards and/or guidelines. This obviously causes barriers for the implementation of ODA projects. This study aims to deal with the problem by identifying key barriers for BIM implementation in Japan ODA projects in Vietnam. To serve the purpose, data from non-BIM ODA projects is firstly analysed to identify problems that can be handled by BIM. Next, problems obtained from BIM-applied projects were considered to identify needed aspects for BIM application in ODA projects in Vietnam. Finally, the incompatibility between Vietnam's BIM guidelines and related regulations is investigated to identify barriers to BIM implementation in ODA projects in Vietnam. Findings showed that the key barriers include problems related to BIM content, stages of applying BIM to project, BIM cost, BIM guidance documents, and the capability of executing agencies.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.