Case-based Software Project Network Generation by the Least Modification Principle (사례의 수정최소화 기법에 의한 소프트웨어 프로젝트 네트워크 생성시스템)

  • Lee, No-Bok;Lee, Jae-Kyu
    • Asia pacific journal of information systems
    • /
    • v.13 no.1
    • /
    • pp.103-118
    • /
    • 2003
  • Software project planning is usually represented by a project activity network that is composed of stages of tasks to be done and precedence restrictions among them. The project network is very complex and its construction requires a vast amount of field knowledge and experience. So this study proposes a case-based reasoning approach that can generate the project network automatically based on the past cases and modification knowledge. For the case indexing, we have adopted 17 factors, each with a few alternative values. A special structure of this problem is that the modification effort can be identified by each factor independently. Thus it is manageable to identify 85 primitive modification actions(add and delete activities) and estimate its modification efforts in advance. A specific case requires a combination of primitive modifications. Based on the modification effort knowledge, we have adopted the Least Modification approach as a metric of similarity between a new project and past cases. Using the Least Modification approach and modification knowledge base, we can automatically generate the project network. To validate the performance of Least Modification approach, we have compared its performance with an ordinary minimal distance approach for 21 test cases. The experiment showed that the Least Modification approach could reduce the modification effort significantly.

An Analysis on Economic Effectiveness of Environment Improvement Project in Oil Spill Damaged Fishing Grounds (유류피해지역 어장환경 개선사업의 경제적 효과 분석)

  • KIM, Hong-Sik;JEON, Hyoung-Joo;KIM, Do-Hoon
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.6
    • /
    • pp.1781-1791
    • /
    • 2016
  • This study aimed to analyze the economic effectiveness on environment improvement project that has been implemented in five fishing grounds of Taean-gun which had been damaged by the Hebei Spirit oil spill accident. In the analysis, first, this study performed the survey on residents perceptions about the environment improvement project. Second, the cost-benefit analysis was carried out to evaluate the economic effectiveness of the project. The survey results of residents perceptions indicated that the damage of oil spill was considerable in the target areas. It also showed that residents wanted to continue the environment improvement project and the levels of project satisfaction were quitely high. The economic results showed that 3 areas(Woong-do, Wang-san, and Dang-mi) would have positive values of NPV and B/C ratio, but the other(Nu-dong) would have negative values. The findings of this analysis could be used as the base data for increasing operational efficiency of future environment improvement projects.

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF

THE ROLE OF USING A TABLET COMPUTER FOR MOBILE COMMUNICATION ON CONSTRUCTION SITES

  • Ruvinde R. Kooragamage;John M. Kelsey;Simon Julier
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.531-538
    • /
    • 2013
  • The coordination and control of construction projects is vital if a project is to be a success. Almost all analysis has shown that these can only be achieved if good quality communication can be maintained on a construction site. This research focuses on the role that tablet computers could play in enhancing this communication. The following points are investigated in this paper: (a) Whether a tablet computer can enable users to monitor project progress more efficiently than traditional methods, (b) How the tablet computer fits within the project management iron triangle in construction, (c) The two different psychological impacts of information transmission for the end user using a tablet computer (i) The expectancy to transmit information frequently and rapidly from tablet computer users to project members whilst working onsite (ii) The mode of information transmission to the cognition of the transmitted information to the tablet computer. Through the use of structured interviews and questionnaires, the opinions of individuals within various disciplines in construction were canvassed. The approach adopted in this paper deals with understanding both the soft and hard issues for deploying such a system. This research enabled the authors to develop a base framework incorporating the key factors which are relevant for implementing a tablet computer based on information flows primarily.

  • PDF

Landuse Information System Construction and Landuse Pattern (토지이용정보체계구축 및 토지이용유형화에 관한 연구)

  • 이근상;임승현;조기성
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.17 no.1
    • /
    • pp.1-10
    • /
    • 1999
  • Landuse information is base data being applied as common database in the process of executing urban project service and is very available. But, the progress of business on landuse information building is deficient yet. In this study, we'd like to deal with landuse information projet that is the base of urban project, many landuse information building and the method of extraction of efficient second-information. Also, we built system to apply actively landuse information for urban projectors. And, we'd like to present the model on urban landuse classification system that wouldn't be standard yet by studying the method of urban landuse pattern using landuse in-formation being built. Also, we can evaluate if the model of urban landuse pattern comes up to present landuse. We can expect it is a base data by extracting unsuitable area from present landuse efficiently when we construct landuse project.

  • PDF

Selective Synthesis of 1'(α),2'(β)-C-Dimethyl Carbocyclic Adenosine Analogue as Potential anti-HCV Agent

  • Li, Hua;Lee, Won-Jae;Yoo, Jin-Cheol;Hong, Joon-Hee
    • Bulletin of the Korean Chemical Society
    • /
    • v.30 no.9
    • /
    • pp.2039-2042
    • /
    • 2009
  • As a part of an ongoing effort to discover inhibitors of the Hepatitis C Virus RNA replication, we describe here the first synthetic route of 1'($\alpha$),2'($\beta$)-C-dimethyl carbocyclic adenine analogue. The key intermediate cyclopentenyl alcohol 8($\alpha$) was prepared from aldehyde 4 using ring-closing metathesis (RCM) as a key reaction. Coupling of 8($\alpha$) with nucleosidic base via the regioselective Mitsunobu reaction followed by stereoselective dihydoxylation and deprotection afforded the target carbocyclic adenine analogue 12.

Prediction/Investment Cost Analysis for korea High-Speed Railway System (한국형 고속전철 시스템의 추정/투입비용 분석)

  • Lee, Tae-Hyeong;Park, Chun-Su
    • 시스템엔지니어링워크숍
    • /
    • s.1
    • /
    • pp.60-64
    • /
    • 2003
  • In this study, we have analyzed the cost of korea high-speed railway system. The predicted cost in planning phase and adjustment data to 5th year are collected. Then, predicted cost is compared with adjustment in year/item/system base. We make a project history table for criteria to review project history and research & development activity. We have developed CBS(cost breakdown structure) and allocated adjustment data to them. It is shown that cost prediction related to research & development activity in planning phase is relatively correct.

  • PDF

Object Management Techniques of Agricultural Production Base using Relational Database (관계형 데이타베이스를 이용한 농업생산기반객체관리법)

  • 나준엽;김한중;이정재
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1999.10c
    • /
    • pp.354-358
    • /
    • 1999
  • In practicing the refinement project of agriuctural production basys, many researches have been done until now, but they are not reused because management is not easily accomplished. We analysed and designed the Components of refinement project by the object -orientation technique, and presented a method of accumulation and management of object's data using relational database. In result, management of new data is easy and reusibility are increased compared to structural analysis technique.

  • PDF

A Comparative Study on the Local Governments' Environmental Impact Assessment Regulations in Korea (지방자치단체 환경영향평가 조례 비교 연구)

  • Sung, Hyun-Chan;Min, Soo-Hyun
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.3
    • /
    • pp.137-150
    • /
    • 2003
  • This study aims to survey whether local governments have legislated laws and regulations on environment impact assessment system, to compare and analyze specific projects and their scale, assessment items, and procedures & discussion process, to identify issues and generate improvement plans, and to suggest a direction for future legislation to local governments that plan to legislate laws and regulations in the future. Major outcome of the study are as follows. First, terminologies used for environment impact assessment by local governments need to be unified. Also, laws and regulations need to be legislated soon. Second, in "urban development project" areas, a total of nine project areas including "quarrying of soil and stone, sand, gravel, and minerals" was essential common projects. A total of six project types were added or newly established compared to national systems. Among them, four project types were added within national-level project areas and two project types were not available under the national-level project areas and newly added due to the nature of local governments. Third, in terms of project scale, scale enhancement of "urban development project" was most common. Analysis showed that in case of clean natural environment such as Cheju Island, it is necessary to consider reinforcing project areas where development activities take place directly in forests or rivers such as "industrial base and complex development", "water resource development", and "development of tourism complex." Fourth, the discussion and review procedures of assessment reports were similar to those at government level. However, in case of Seoul city, it is required to write a "preparation plan" before drafting an assessment report. The city features partial introduction of scoping and screening, which allows to exempt discussion procedures if impact on environment is found to be minimal after drafting the assessment report. In case of national-level, it has a dual system that is split between Ministry of Construction and Transportation and Ministry of Environment. However, in case of environment impact assessment of local governments, it is a single system where city mayors and provincial governors are in charge of both project execution and environmental assessment. Therefore, the most important task is how to satisfy objectiveness and accountability.

Spatial database architecture for organizing a unified information space for manned and unmanned aviation

  • Maksim Kalyagin;Yuri Bukharev
    • Advances in aircraft and spacecraft science
    • /
    • v.10 no.6
    • /
    • pp.545-554
    • /
    • 2023
  • The widespread introduction of unmanned aircrafts has led to the understanding of the need to organize a common information space for manned and unmanned aircrafts, which is reflected in the Russian Unmanned aircraft system Traffic Management (RUTM) project. The present article deals with the issues of spatial information database (DB) organization, which is the core of RUTM and provides storage of various data types (spatial, aeronautical, topographical, meteorological, vector, etc.) required for flight safety management. Based on the analysis of functional capabilities and types of work which it needs to ensure, the architecture of spatial information DB, including the base of source information, base of display settings, base of vector objects, base of tile packages and also a number of special software packages was proposed. The issues of organization of these DB, types and formats of data and ways of their display are considered in detail. Based on the analysis it was concluded that the optimal construction of the spatial DB for RUTM system requires a combination of different model variants and ways of organizing data structures.