Finding Significant Factors to Affect Cost Contingency on Construction Projects Using ANOVA Statistical Method -Focused on Transportation Construction Projects in the US-

  • Lhee, Sang Choon
    • Architectural research
    • /
    • 제16권2호
    • /
    • pp.75-80
    • /
    • 2014
  • Risks, uncertainties, and associated cost overruns are critical problems for construction projects. Cost contingency is an important funding source for these unforeseen events and is included in the base estimate to help perform financially successful projects. In order to predict more accurate contingency, many empirical models using regression analysis and artificial neural network method have been proposed and showed its viability to minimize prediction errors. However, categorical factors on contingency cannot have been treated and thus considered in these empirical models since those models are able to treat only numerical factors. This paper identified potential factors on contingency in transportation construction projects and evaluated categorical factors using the one-way ANOVA statistical method. Among factors including project work type, delivery method type, contract agreement type, bid award type, letting type, and geographical location, two factors of project work type and contract agreement type were found to be statistically important on allocating cost contingency.

도시 취업주부의 가계재무관리유형 및 관련변인 연구 (A Study of Urban Employed Wives무 Family Financial Management Type And It무s Related Variables)

  • 계선자;강기정
    • 가족자원경영과 정책
    • /
    • 제3권2호
    • /
    • pp.17-32
    • /
    • 1999
  • The purpose of this study is to investigate bases on the employed wives’family financial management types according to family financial management types according to family financial management project and performance. And it’s related variables will provide the basic information for the program which aids in the improvement of the employed wives’family financial management skills and family financial counseling. The major findings were as follows: 1) The total mean score of respondent’s family financial management was 3.54 out of 5. And the mean score of project and performance was respectively 3.42 and 3.62. 2) Among family financial management types, effective type, project-centered type, performance-centered type, ineffective type were respectively 38.7%, 16.4%, 13.2%, 31.7%. 3) The family financial management type of the employed wives was affected by information utilization the degree of communication, type of occupation, and job attitudes.

  • PDF

SI 프로젝트 관리자의 리더십 역량과 프로젝트 참여자 개인역량이 프로젝트 성과에 미치는 영향에 관한 연구 (A Study on the Influence of SI Project Manager's Leadership Competencies and Project Participants' Individual Competencies on Project Performance)

  • 이중우;이철규
    • 한국IT서비스학회지
    • /
    • 제21권4호
    • /
    • pp.27-61
    • /
    • 2022
  • In order to improve project performance by analyzing the effects of the project manager's leadership competency and the individual competency of the project participants on the project performance, this study examines the effect. In this study, a research model and hypothesis were established to understand the causal relationship between leadership competency, individual competency, and project performance, and a survey was conducted based on this. Overall, it was found that the leadership competency of the project manager and the individual competency of the project participants had a positive effect on the project management performance, the project leadership competency had a positive effect on the completion performance, and the project participant individual competency had a negative effect on the completion performance. As a result of analyzing the effect of the project manager's core competency on the project management performance according to the amount or period of the project type, which is the moderating variable, it was found that there was no moderating effect on the management performance. For the success of the SI project, it is most important to understand the project characteristics well and select a PM suitable for the characteristics, and methods for nurturing excellent project managers should be further studied. In addition, it is expected that it will be possible to identify the effect of project manager leadership competency and participant competency on project performance based on sophisticated research design for more competent PM selection.

공동기술개발 프로젝트의 성패요인: 우리나라 전자부품 중소기업 분석 (Key Success Factors for Collaborative Technology Development Projects: The Case of Small & Medium Firms in the Korean Electronics Parts Industry)

  • 이광희;김영배
    • 기술혁신연구
    • /
    • 제6권2호
    • /
    • pp.122-158
    • /
    • 1998
  • This study empirically examined different patterns of collaborative R&D project with their key success factors(KSFs), using data from 82 projects in the Korean electronic parts industry. The patterns of R&D collaboration were categorized into 4 types by two criteria development motive(technology Push/market pull) and Project initiator (focal firm/partner). The bivariate relationships revealed that project characteristics (technological complexity, market uncertainty), management characteristics (participation in project formulation), problem solving characteristics(problem solving performance of the focal firm, users active role in problem solving, active role of university or research institute in problem solving) and success rates appear to be different among four types of collaboration. Each type of collaborative R&D projects also had different KSFs. The KSFs of type 1 (technology Push and focal firm initiation), for instance, include the strategic importance of the project, focal firms share of cost, active role of university or research institute in problem solving, while those of type 4(market pull and customer initiation) cover reliability of partner relationship, a time at partners involvement, information sharing. The findings suggest that the different contingencies brought different patterns and KSFs of collaborative R&D project, since different information, resources, and partners roles were needed to successfully implement the projects according to development motive and project initiator Finally, managerial, policy, and theoretical implications for the collaborative R&D activities in the Korean electronics parts industry were discussed, based on empirical results of this study.

  • PDF

레이스트랙형 초전도계자코일의 AE 신호 특성평가 (Investigation of Acoustic Emission Signals in Racetrack Superconducting Field Winding Coils)

  • 손명환;백승규;고락길;이언용;배준한;권영길;류강식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 A
    • /
    • pp.186-188
    • /
    • 1998
  • Acoustic emission monitoring on two racetrack superconducting field winding coil was performed during excitation and quenches to diagnose the integrity of the field winding coils. Two field windings were not impregnated with epoxy The results confirm that the acoustic emission signals are mainly due to conductor motions which cause premature quenching of the winding. The quench current of modified racetrack type field winding coil (Type B) are more higher than that of conventional field winding coil (Type A).

  • PDF

Measuring the Impact of Change Orders on Project Performances by Building Type

  • Juarez, Marcus;Kim, Joseph J.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.179-187
    • /
    • 2022
  • The project performances can be measured in terms of meeting the project schedule, budget, and conformance to functional and technical specifications. Numerous studies have been conducted to examine the causes and effects of change orders for both vertical and horizontal construction, respectively. However, these studies mainly focus on a single project type, so this paper examines the impact of change order for cost growth and schedule overruns using four different building types to close the gap in the change order research area. A total of 211 building projects are collected from four building types: healthcare, residential, office, and education. Statistical analyses using ANOVA tests and linear regression models are used to examine the created metric $CO/day on the cost and schedule impacts. The results found that mean $CO/day values were not statistically different among building types, and that the sum of change orders is a statistically significant predictor of $CO/day. The results will help project stakeholders mitigate the negative change orders effects can be a challenge for project managers and researchers alike.

  • PDF

개발사업에 의한 자연경관 영향 저감방안 중요도 분석에 관한 연구 (A Study on the Analysis of the Importance of Natural Landscape by the Development Project)

  • 신민지;신지훈
    • 농촌계획
    • /
    • 제25권2호
    • /
    • pp.99-117
    • /
    • 2019
  • Environmental impact assessment (EIA), which predicts, evaluates, and manages the influences on natural landscape, plays a role of monitoring natural resources for systematic management of natural landscape. However, the function of verification and correction of the system is still insufficient and feed-back, one of the most important features of EIA follow-up, has not been introduced in Korea's EIA system yet. As a procedure, it is required to check if the opinions of the evaluators are properly reflected to the outcomes of the project through a reviewing process after assessing environmental impacts of a development project. In reality, despite the awareness about the importance of follow-up inspection of the conformity with, the system mainly focuses on the agreement during the planning stage of the development project and fails to continuously manage after its completion. There have been various preceding studies related to prediction, evaluation, and management of environmental impacts on natural landscape for better management. They primarily dealt with the problems in the EIA process and suggested improvement measures, including directions for institutional development, step-by-step goals, and operation methods, to address the problems which arise in the EIA follow-up process. However, suggested measures are not actively applied with the focus only put on institutional operation, there are virtually no standardized methods to predict and assess landscape changes due to the development project and to manage landscape after the project. Against this backdrop, this study aims to explore the existing methods to analyze the impacts natural landscape and to establish a system where landscape management is continued after the development project. To this end, we will suggest reducing methods according to the predicted changes in landscape for post-project management of natural landscape. Characteristics of reduction methods by project type were examined through reviewing the guide to natural landscape rating and the importance of development project impacts on natural landscape by type of reduction was evaluated through questionnaire for experts. Evaluated types of reduction are classified and presented by characteristics of each development project and content of reduction type.

NEW TREND OF SCHEDULING IN LINEAR CONSTRUCTION PROJECT

  • S. Sankar;J. Senthil
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.917-923
    • /
    • 2005
  • Scheduling is one of the main functions in construction project to determine the sequence of activities necessary to complete a project. The scheduling techniques provide important information crucial to a project's success. Highway construction project the paving activity can be considered a linear activity. Linear scheduling technique may be better suited for linear projects than other scheduling techniques. A new type of scheduling in linear project is calling Linear Scheduling Model (LSM). The Project monitoring and controlling is very ease to identify that all the stage of linear project and have more advantages.

  • PDF

환경영향평가 대상사업별 중점평가항목의 도출에 관한 연구 (Study on the Establishing a Guideline for Selecting Major Environmental Factors by the Project Type Criteria in EIA)

  • 성현찬;한상욱
    • 환경영향평가
    • /
    • 제3권1호
    • /
    • pp.9-30
    • /
    • 1994
  • Environmental Impact Assessment System, ever since its enactment in Korea fourteen years ago, has been steadily improved by introduction and implementation of new concepts and methodologies which include Environmental Impact Statement(EIS) preparation technique, selection of environmental factors, and the like. However, current guideline requires that every EIS, regardless of the specifics of the project type or characteristics of the site, must evaluate and study for all twenty-two environmental factors as set forth in the regulation. The situation causes many undesirable problems like; lack of site specific evaluation in most EISs, over-sized EIS drafts, consuming too much time and costs for EIS preparation, and so on. The objectives of this study are: - To establish a set of criteria to classify the types of the projects in terms of features of the project content and the characteristics of the site area. - To establish a guideline for selecting major environmental factors of the project type criteria, and - To provide basic materials for the preparation of complets draft EIS of the Amendment of Environmental Impact Assessment Act.

  • PDF

CHARACTERISTICS OF ACCIDENTS IN CONSTRUCTION PROJECT IN KOREA

  • Kyeong-Seok Chae;Chan-Sik Lee
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.603-608
    • /
    • 2011
  • According to the labor related data from Korea Occupational Safety & Health Agency, accident victims of construction industry are increasing 6% annually since 2006. The major reason why the rate of accidents increases in Korea is that lots of labor working with another trades works simultaneously in various type of works. This study analyzes the current accident status in view of the type of building, type of works, and project size for the latest 3 years (2007~2009). As a result, 'single family & semi-detached houses' has the largest number of accidents among buildings. In addition, 'finishing work' shows the highest number in terms of work type. For the size, accidents occurred much for 'less than 300 million'. The results of this study can be used to focus on managing the highly hazardous area where the construction accidents mostly occur; therefore, it is anticipated to contribute to improve efficiency of safety management.

  • PDF