• Title/Summary/Keyword: Project type

Search Result 1,526, Processing Time 0.036 seconds

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

A Research on the core PMO function and operation type for the IT project of financial industry in Korea (금융권 핵심 PMO 기능과 운영형태에 관한 연구)

  • Lee, Jae-Beom;Lee, Jae-Chul;Chang, Yun-Hi
    • Journal of Digital Convergence
    • /
    • v.7 no.3
    • /
    • pp.35-47
    • /
    • 2009
  • The IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques, TQM to decrease project failure, and to increase IS performance. But, in spite of such various efforts, the latest Standish Group's research indicates that the project scale is bulkier than $1{\sim}2$ year ago and IS development project's batting average falls from 34% to 28% at the same time, proceeded project is increased, and project discharged arrives to $15%{\sim}18%$. According to a research, success possibility increased by 37% after a year of PMO introduction, and increased sharply by 62% after 2 years and by 65% after S years. This research has a goal to survey how the PMO function and operation type affect the IS project performance in the financial industry. I determine nine independent variables and three dependent variables from previous researches. The results of this study are that the four core functions of PMO have relationship with project performance. But, technical support function does not relate with organization performance. Among the four core PMO operation types, three types have an effect on the IS project performance except the perfectionist type.

  • PDF

Analyzing Characteristics of Construction Complaints with Construction Project Type

  • Lee, Ju-Hui;Lee, Changjun;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.52-61
    • /
    • 2023
  • Conflicts in a construction project not only make negative impacts on project performance such as schedule delay or cost overrun but also require social cost to resolve the conflicts. Although the conflict needs a preemptive management because a conflict usually begins with a complaint, existing studies have focused on conflict resolution after it occurs. This study identifies and categorizes complaints which mainly appear in the construction projects. Those complaints were evaluated and quantified in terms of occurrence frequency and potential to conflict through a questionnaire survey with industry experts. Using the survey results, this study examines the characteristic of complaints in linear project and clustered project, and analyzes what kind of complaints occur by project type. As the results, this study derives the complaints with high potential to the conflicts that should be managed first during managing a construction project in each project type.

Project evaluation by the rural villagers on and spatial analysis of the reconstructed villages under the Rural Village Improvement Project (Type A) (취락구조 개선(신촌형) 마을의 주민의식 및 공간구조 분석에 관한 연구)

  • Im, Seung-Bin;Jo, Sun-Jae;Park, Chang-Seok
    • Journal of Korean Society of Rural Planning
    • /
    • v.1 no.2
    • /
    • pp.53-66
    • /
    • 1995
  • This study aims at analyzing of residents'attitudes and spatial structures in the rural villages reconstructed by the Rural Village Improvement Project(type A), and suggesting the guiding directions for planning rural villages. Six rural villages located in KyungGi province were selected for case study. The Major findings can be summarized as follows : 1) The ratio of type A project(newly planned village) in the total cases of the Rural Village Improvement Project has increased since 1990, In the majority(91.2%) of the type A project, the project area is below 2 ha and density of dwelling unit is below 40 households/ha. 2) The three spatial structures of newly planned rural village, i.e., Loop pattern, Cul-de-sac pattern, and Dendritic pattern, are identified. And the barns in the newly-build houses are categorized into the five types : the vertical addition type, the horizontal addition type, the vertical- horizontal addition type, the no- barn type, and the reused -barn type. 3) In the newly planned rural villages, the level of satisfactions for the quality of house and water & sewer system is remarkably higher than in the existing rural villages. These are the positive effects caused by the Rural Village Improvement Project. 4) The majority of the villagers think the improvement of the existing rural village, instead of redevelopment or newly planned village, is most desirable, which means the improvement of houses, roads, and sanitary facilities while preserving the spatial structures of the existing village.

  • PDF

A Study on the Linkage Strategy for Urban Regeneration Considering Local Characteristics (지역특성을 고려한 기성시가지의 연계적 재생전략 연구)

  • Kim, Cheol-Su;Jung, Byung-Doo;Kang, Seung-Kyu
    • Journal of the Korean housing association
    • /
    • v.23 no.5
    • /
    • pp.87-94
    • /
    • 2012
  • The primary purposes of this study are to suggest a medium-sized regeneration project which includes the excluded small sites near existing regeneration site, to identify urban improvement type which fits local conditions, and to suggest proper regeneration strategies for the improvement type. Main findings of this study are follows. First, the size of the living environment improvement project in urban area should be larger than 3ha and government's incentives are required for parcel merges to make the medium-size project site. Second, independent type of urban regeneration project should consider local characteristics while center-spread type of urban regeneration project should build a center by providing neighborhood facilities and proper housings. Third, urban regeneration project should be able to utilize local assets, such as cultural heritages, natural landscapes, transportation facilities. Fourth, standards for public support should be prepared to improve local competitiveness. Last, further studies are required for urban regeneration system improvement.

Dongeui Visual-PERT/CPM for R&D Project Management (연구개발 프로젝트관리를 위한 시각화모델)

  • 황흥석
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.10a
    • /
    • pp.268-271
    • /
    • 2000
  • In these days, the technical advances and complexities have generated much of the difficulties in managing the project resources, both time and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgements concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a two-step approaches :in the step 1, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning, In the second step, we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. Computer implementation of this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of visual graphical. Also developed GUI-type program, Dongeui Visual-PERT/CPM. The results of this research will provide the project managers with an efficient management tool.

  • PDF

An Economic Analysis of Industrial Forest Plantation and A/R CDM Project in Indonesia (인도네시아에서의 산업조림과 A/R CDM 사업 경제성 분석)

  • Park, Chongho;Kwon, Kiwon;Kim, Sebin
    • Journal of Korean Society of Forest Science
    • /
    • v.96 no.3
    • /
    • pp.348-356
    • /
    • 2007
  • The purpose of this study is to give the results of economic feasibility of industrial forest plantations, and also A/R CDM project in Indonesia to investors. In order to analyze economic feasibility of the industrial forest plantation and A/R CDM project, this study comparatively analyzes the feasibility based on three following scenarios: industrial plantation type; A/R CDM type; combination type of industrial plantation and A/R CDM project. In the aspect of IRR, the combination type has 11 % while the industrial plantation type has 8%. If the price of timber increases USD $5/m^3$ (from the standard price: USD $30/m^3$ to USD $35/m^3$), IRR of the industrial plantation type will increase from 8% to 14%. This result shows us that the IRR of the industrial plantation type is very sensitive to the price of timber. There is no economic feasibility of A/R CDM project if the price of lCER is under USD 5. In addition, IRR of the A/R CDM project type is the same to IRR of industrial plantation type (8%) when the price of lCER is USD 10. Finally, the total investment expenditure on 12,000ha of the combination type is approximately 13 billion won while the industrial plantation type is 13.6 billion won. It takes 11 year to reach the turning point in terms of profitability of the combination type while the industrial plantation takes 13 year. Thus, the economic feasibility of the combination type is higher than the other types(industrial plantation type and A/R CDM project type).

A Study on the Activation Plan of Village Maintenance for Public Housing Project of Local Small and Medium-Sized Cities (지방 중소도시 마을정비형 공공주택사업 활성화 방안 연구)

  • Kang, Dong-Ryeol;Ahn, Jung-Geun;Bae, Min-Cheul
    • Journal of Korean Society of Rural Planning
    • /
    • v.28 no.2
    • /
    • pp.21-32
    • /
    • 2022
  • Since the village maintenance type public housing project was introduced in 2015, the resident needs for regional revitalization and pleasant living conditions are not being met due to the poor performance of the public housing complexes that reflect the surrounding area maintenance plan (village plan) and regional characteristics. The purpose of this study is to suggest a plan to revitalize the village maintenance type public housing project in consideration of regional characteristics as a result of analyzing the needs of local residents through the problems of the village maintenance type public housing project being promoted so far and resident satisfaction. As a result of the analysis based on the public housing project implementation status analysis and resident satisfaction, the plans to activate the village maintenance type public housing project are as follows. First, in order to secure the effectiveness of the village plan, it is desirable to promote the public housing project and the village plan at the same time. It is necessary to secure a budget according to the selection of public offering projects in the village plan, such as promoting public housing projects without setbacks by prioritizing land purchases for public housing sites and establishing specialized strategies considering regional characteristics. Second, a public housing project that responds to local demand is required. The evaluation factors such as continuous promotion of the urban architecture integration plan and strengthening of regional linkage plans such as specialization of regionally tailored designs should be supplemented so that regional resources and village plans are linked with the public housing specialization plan. Third, surrounding area maintenance plan (village plan) should be secured by the strengthen of the legal status or establishing related provisions. It is also necessary to promote system improvement for area maintenance plan (village plan) when selecting a publicly funded public project.

Characteristic Analysis for Weight Values of Evaluation Items by Traffic Safety Project Type (교통안전사업 유형별 평가항목의 가중치 특성분석)

  • Lee, Heewon;Lee, Jisun
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.147-156
    • /
    • 2018
  • PURPOSES : The purpose of this study is to analyze the characteristics of the weight values of evaluation items by traffic safety project type. METHODS : In general, a large-scale investment in projects such as the traffic safety project requires economic analyses to be performed in advance. However, there is an argument for considering special characteristics of the traffic safety project. Therefore, this study conducted characteristic analysis of the weight values of evaluation items. The analysis consisted of two steps. The first step was hypothesis verification using analysis of variance (ANOVA). In this process, the authors examined whether the weight of evaluation items is the same regardless of the traffic safety project type. Based on the first step's results, the authors proceeded to the second step. The objective of this step was to analyze how different the weight values are by traffic safety project type using an analytic hierarchy process. RESULTS : According to the ANOVA test results, the benefit to cost ratios have different weight values based on traffic safety project type at the 0.01 significance level. The policy evaluation items, such as the plans connection, resident opinion, and regional equity, also showed the same results except that the result for the related plans connection was statistically significant at the 0.05 level. Based on the first step's result, the AHP analysis in the second step showed that the traffic safety projects for vulnerable users and pedestrians have very low weight values in economic evaluation factors compared with other safety project types. The weight values for vulnerable users and pedestrians were 0.29 and 0.26, respectively, in economic evaluation items. On the other hand, the weight values for other safety project types were around 0.6. Among the policy evaluation items, resident opinion showed a higher weight value than other factors, such as connection and regional equity items. CONCLUSIONS : The social and economic impact of a traffic safety project varies by project type and project characteristics. Although the economic approach is overarching and a reasonable methodology is applied for large-scale projects, it should be noted that the safety issue, especially for transportation of vulnerable uses, requires a non-economical approach. Based on the analysis results, this study suggests that the priority of the projects should be determined by separating them into independent assessment groups depending on their characteristics.

A Study on the Mixed Implementation Method of Management Disposition and Cost Settlement by Public Participation in Urban Renewal Type Redevelopment Projects (도시정비형 재개발사업에서 공공참여에 의한 관리처분 및 원가정산 혼용 시행방식에 관한 고찰)

  • Moon, Myung-Yeol;Jeon, Sang-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.254-255
    • /
    • 2021
  • The urban renewal type redevelopment project is a project to improve the urban environment for the recovery of urban functions and revitalization of commercial districts in commercial and industrial areas. Urban regeneration projects are not progressing smoothly. The urban renewal type is not so for landowners, who require a high level of professional knowledge and experience to carry out smooth projects. In addition, the core part of business conflicts can be seen as the problem of management and disposal methods. Therefore, as landowners, etc. become the actual subjects, the public will take charge of project execution, but all development gains and losses will be attributed to the owner of the land, etc.

  • PDF