건설 프로젝트의 재해영향요인 기반 위험성 평가방법 (A Risk Assessment Method using Disaster Influence Factors on Construction Project)

  • 유용신;최재욱;김태완;이찬식
    • 대한건축학회논문집:계획계
    • /
    • 제35권6호
    • /
    • pp.3-12
    • /
    • 2019
  • Current risk assessment methods typically determine accident risks embedded in construction projects by combining severity and frequency; however, they do not reflect the characteristics of construction projects. To solve the problem, this study aims to develop a novel risk assessment method that combines severity, frequency, and disaster influence factors (i.e., weather conditions and worker's characteristics) for assessing risks of activities occurring on a construction site actually. In this study, a severity was estimated by death against victims, and a frequency was estimated by the victim rate. The frequency was then converted to probability taking disaster influence factors into account. Thus, instead of considering severity and frequency for assessing the original risks (RO), the proposed method uses severity and probability to yield adjusted risks (RA) for each activity. A case study was conducted to determine if the proposed method works as intended in a real setting. The results show that RA is more sensitive to disaster influence factors than RO and, therefore, is able to assess the actual risks reflecting the working environment and conditions of a construction site. This study contributes to risk management of construction projects by offering a risk assessment method that measures a possibility of potential disasters from the probabilistic perspective. This method would help project managers assess accident risks in a more systematic and quantitative manner.

시스템엔지니어링에 기반한 효과적인 리스크 관리 (An Effective Project risk Management Based on Systems Engineering)

  • 강탑;김성철;오정택
    • 시스템엔지니어링학술지
    • /
    • 제7권1호
    • /
    • pp.43-51
    • /
    • 2011
  • SE generally defines approaching ways of conducting identification, verification and integration of an optimized product and process solution to meet customer's needs by leveraging organizational competency in engineering and management. To successfully develop a new product under mass production contract, it is important to efficiently carry out the program by ensuring that three major competencies are secured; core technology, system integration, and program management. For successful implementation of tasks in the three areas, systematic execution is called for, which requires identifying risk factors in advance. In particular, comprehensive risk management role and responsibility is required for program management. Success of a development program is determined by complex elements of human resources, organization culture, and overall competency of an organization in technology and program management, including capability of the program manager. In this paper, a risk management solution is suggested to lead a program to success with a more efficient way through actual risk management by the concept of SE around the above three areas.

ERP 서비스 도입 시 국내 물류기업의 실물옵션 활용 수준에 대한 실증 연구 (Real Option Applications of Korean Logistics Firms for ERP Project Evaluations)

  • 김태하;남승현
    • Journal of Information Technology Applications and Management
    • /
    • 제26권6호
    • /
    • pp.119-138
    • /
    • 2019
  • This work examines whether IT managers adopt of real options such as defer, expand, contract, and abandon in order to cope with ERP risks, which include technological risk, relationship risk with SW vendors, economic risk, and security risk. We collect data of logistics firms in Seoul and its suburbs in 2018 to empirically validate the effect of risks upon the adoption of real options. The results suggest that IT managers adopt all 4 options when facing economic risk and adopt contract and abandon options only when facing security risk. Additionally, we find that IT managers prefers expand option and avoid abandon option when they think ERP compatibility is high.

ISM기법을 이용한 도시재생사업 리스크 요인의 상관성 분석에 관한 연구 (A Study on Correlation Analysis of Risk Factors for Urban Regeneration Using ISM method)

  • 박범석;김윤식;한상원;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.192-193
    • /
    • 2013
  • In recent years, risks associated with mixed used development in urban regeneration projects which have actively been implemented have been on the rise due to uncertainties and complexities of those projects. Thus, risk management is needed to effectively manage those risks that may occur during the process of a project. Many studies have contributed to deal with risk management of those projects. These studies, however, have focused main on identification stage and deriving the main risk factors and have limitations on presenting the relationship among those risk factors. Since many risks are interdependent and have multiple effects, the purpose of this study is to present a way(ISM method) to provide a hierarchical structural framework of risks in Urban Regeneration. The structural of risks can helps decision makers to trace the actual source of these risks.

  • PDF

LEARNING FROM THE SOUTH KOREAN RISK MANAGEMENT PLAN FOR THE SHIPBUILDING INDUSTRY DURING THE DIFFICULT 2004-2005 YEARS

  • Seng-Kiong Ting;Mengqiong Wang
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.990-994
    • /
    • 2009
  • With the world in financial recession, the general trend of global trade is declining. As a result, the world leading shipbuilding industries are confronted with an even more difficult task of mitigating various risks associated with the industries. How well the three shipbuilding industries, Japan, Korea and China, can adapt and manage the risks will be crucial. As the youngest of the top three, the Chinese industry faces greater risks. As it happens to share many factors with that of South Korea in 2004-2005, it is necessary to review and evaluate the risk management plan used by South Korea. This paper presents an evaluation of the risk management plan for shipbuilding industry in South Korea during 2004-2005, considering the financial and political environments at that time. This will help us to structure a plan of risk management for the future.

  • PDF

시공단계의 사고손실 비용 기반 건설안전 위험성 평가 방안 (Construction Safety Risk Assessment Method Based on Accident Loss Cost in the Construction Phase)

  • 이재현;정재욱;정재민
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.407-408
    • /
    • 2023
  • This article proposes a method to assess construction safety risk during the construction phase based on accident loss costs. Risk assessments for hazardous construction work are required by law, but they lack quantitative criteria. To address this, a survey estimated loss costs due to fatalities in the construction industry, finding labor loss cost and delay reimbursement cost to be the largest factors. The proposed method uses algorithm to calculate expected accidents and risk levels based on project characteristics, work methods, personnel, and environment data. This method is expected to enhance the reliability and usability of risk assessments during the construction phase of construction projects.

  • PDF

수용체 지향의 건강영향평가를 위한 잠재노출 인구수의 산정·활용 가능성 연구 (A Study on the Application of Potential Exposed Population for a Receptor-oriented Health Impact Assessment)

  • 하종식
    • 환경영향평가
    • /
    • 제27권2호
    • /
    • pp.194-202
    • /
    • 2018
  • 국내 법적인 건강영향평가로서 환경영향평가 내 위생 공중보건 항목의 평가는 특정 개발 사업에서 배출되는 유해대기오염물질 배출량 및 주변 주요 지점의 노출농도 산정, 이를 활용한 위해성 평가로 진행되고 있다. 하지만 개발 사업부지 주변의 노출 가능한 인구집단 규모를 고려하지 못하는 등 개발 사업부지 주변의 수용체 특성은 해당 위해성 평가에서 제대로 반영되지 못하고 있다. 본 논문의 목적은 개발 사업부지 주변의 노출 가능한 인구수를 산정 반영한 위해성 평가를 위해 잠재노출 인구수의 산정 및 이를 실제 위생 공중보건 항목 작성 시 활용하는 방안을 제안하는 것이다. 개발 사업부지 주변의 인구수 산정 관련한 국내 자료 현황을 파악하고 이를 고려한 잠재노출 인구수 산정 알고리즘을 제안하였다. 나아가 산업단지 개발 시 유해대기오염물질 배출을 가정한 사례 분석을 수행하였다. 잠재노출 인구수를 활용한 위해성 평가는 인구집단 위해도 개념이 적용되어야 함을 제시하였으며, 향후 연구로 평가결과에 대한 건강영향 여부의 판단기준 설정이 요구됨을 제안하였다. 또한 본 논문의 잠재노출 인구수 산정방법을 통해 개발사업의 입지제한 도구로의 활용가능성을 제안하였다. 이번 논문은 위생 공중보건 항목 작성 시 개발 사업부지 주변의 수용체 특성을 반영한 위해성 평가를 수행하는 방안을 제시했다는 것에 의미가 있다.

자원개발 프로젝트 파이낸싱 위험완화 연구: 사업위험에 따른 비재무적 계약의 레버리지 효과 분석 (The Impacts of the Optimal Non-Financial Contractual Structure on the Leverage Ratio in Project Finance)

  • 이창민;최봉석;김선태
    • 자원ㆍ환경경제연구
    • /
    • 제23권4호
    • /
    • pp.643-665
    • /
    • 2014
  • 본 연구는 석유, 가스개발 사업에서 특별목적기업(Special Purpose Company)의 재무레버리지 비율이 비재무적 계약 여부에 의해 어떻게 결정되는지를 실증적으로 분석하고자 한다. 본 연구의 주요 발견은 다음과 같다. 첫 번째, 비재무적 계약구조에 엔지니어링, 조달 및 건설계약(Engineering, Procurement and Construction, 이하 EPC)과 생산물구매 계약(off-taking)이 포함된 경우에는 특별목적법인의 레버리지 비율을 상승시키는 데 기여한다. 단, 두 계약에 의한 레버리지 효과가 계약당사자가 사업주인 경우에만 국한된다. 금융거래 당사자의 협상력에 따라 기회주의적 행위의 발생가능성을 제시한 대리인 이론적 관점을 참조할 때 석유와 가스 사업에서 사업주는 대체로 자신의 사업을 존중하며 기회주의적 행동의 가능성이 매우 낮다는 것을 의미한다. 두 번째로, 자원가격 변동위험이 높을수록 특별목적법인 레버리지 비율을 높이는 EPC 계약의 효과가 커지는 것으로 나타났다. 반면에 생산물 구매계약의 영향의 레버리지 효과는 약해졌다. 가격변동에 의한 외부 충격이 아주 클 때, 판매위험의 선행 위험인 건설 위험을 맡고 있는 EPC계약이 상대적으로 더 중요해지는 것을 의미한다. 세 번째로, 사업소재국 신용위험이 큰 사업에서 판매위험과 관계없이 생산물구매계약과 EPC계약이 특별목적법인의 레버리지 비율을 유의적으로 높이는 것으로 나타났다. 종합적으로, 비재무적 계약이 자본구조에 미치는 영향은 자원가격위험과 같은 특정 위험보다 사업소재국 신용위험과 같은 사업 전반에 영향을 미치는 위험에 따라 다른 양상을 띠는 것으로 분석되었다.

개발사업(산업단지, 골프장)의 리스크 분석 및 관리방안 (A Study on Risk Analysis and Management Plan for Development Projects)

  • 정민영;이민재
    • 대한토목학회논문집
    • /
    • 제42권2호
    • /
    • pp.229-238
    • /
    • 2022
  • 1960년대 이후 급속한 산업화와 더불어 개발사업은 국가경제 발전에 이바지 하고 있다. 국가에서 추진하는 개발사업 외 민간사업시행자들도 공공의 편의증진, SOC자산의 부족한 재정, 공공발주 외 자체 개발사업 확장 등의 사유로 개발사업을 추진하고 있다. 본 연구는 이러한 개발사업의 사례를 통해 사업비를 분석하고 각 사업비 항목이 갖고 있는 리스크를 미리 판단하고 관리하는 방안을 제시한다. 먼저 기존 개발사업의 리스크 요인 선정방식으로 AHP기법을 사용하였고, 리스크의 상위항목 및 하위항목 계층화를 위해 토목개발사업 관련 전문가와의 인터뷰를 통해 항목을 결정했으며, 설문지 조사를 통해 각 리스크 인자들의 중요도를 평가하고 결과 분석 및 주요 리스크 요인을 도출하였다. 도출된 리스크 요인들이 사업성에 어떠한 영향을 미치는지 민감도 분석을 통해 분석하고, 최종적으로 리스크 요인들의 관리방안을 리스크 대응전략에 대입해 제시하였다. 본 연구는 개발사업 중 산업단지 개발사업과 골프장 개발사업의 사업비의 구성 및 사업수지에 대해 분석하고, 각 항목들이 가진 리스크의 중요도 평가 및 민감도 분석, 관리방안을 제시하여 실무적인 측면에서의 검토를 용이하고, 정확하게 할 수 있는 사업검토 절차를 제시하고자 한다.

대규모 프로젝트의 위험요인과 위험관리에 관한 사례연구 (A Case Study on Risk Factors and Risk Management in a Large-scale Project)

  • 홍사능
    • 한국정보시스템학회지:정보시스템연구
    • /
    • 제19권1호
    • /
    • pp.97-116
    • /
    • 2010
  • Failures of super large projects like IT Upgrade of Shinhan Financial Group can be a heavy blow not only to the company but even to the national economy. Research on the practices of risk management in those projects will provide invaluable lessons, enhancing capabilities and chances of successfully executing mission critical projects of the companies and the national economy as a whole. This paper analyzes the risk management of the Core Systems Reconstruction which was the most critical component of IT Upgrade. The analysis covers risk management plans, and identification and evolution, and control and monitoring of risk factors. This study confirms the major results of previous research on risk management in Korea. However, the analysis found as well some discrepancies of practices from the previous research results. This research also tracked the trajectories of evolution of risk factors and management. In particular, in depth analysis of control and monitoring is the first research in Korea on the "management" of risks in IT projects. The result of this research is expected to be a useful guide for theory development and practices of risk management in the future.