• Title/Summary/Keyword: Project risk

Search Result 1,189, Processing Time 0.026 seconds

A Case Study of Health Impact Assessment on Incinerator Construction Project - Human Risk Assessment due to Inhalation Exposure to Heavy Metals - (소각로 건설사업에 대한 건강영향평가 사례연구 - 중금속 흡입에 따른 인체 위해성 평가 -)

  • Kim, Youngha;Choi, Sangki;Lee, Youngsoo
    • Journal of Environmental Impact Assessment
    • /
    • v.18 no.1
    • /
    • pp.11-19
    • /
    • 2009
  • We conducted human risk assessment due to inhalation exposure to heavy metals emitted from incinerator. The process of health impact assessment(HIA) on incinerator is as follows: The first step is to presume and calculate the amount of heavy metals emitted using emission factor. The second step is to conduct an exposure assessment using the K-SCREEN model which is used for predicting the concentration in a conservative method. The last step is to carry out a risk assessment on carcinogenic and non-carcinogenic substances. This study revealed that rank of carcinogenic human risk was $Cr^{+6}$ > As > Ni > Cd, and values of human risk assessment on carcinogenic and non-carcinogenic substances is lower than the US criteria for risk assessment except $Cr^{+6}$. It is expected that the technique of HIA, especially human risk assessment on heavy metals, would be applied to the incinerator construction project. In addition, more systematic studies are needed to overcome some weak points and limits found in this study.

International Construction Joint Ventures with Developing Countries: Singapore's Case for Risk Assessment and Allocation

  • Hwang, Bon-Gang;Zhao, Xianbo;Chin, Eileen Wei Yan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.435-439
    • /
    • 2015
  • It is important for Singaporean companies to manage the multifaceted risks when forming international construction joint ventures (ICJVs) with developing countries. The objectives of this study are to assess the risks associated with Singaporean ICJVs with developing countries, and investigate the risk allocation preferences in these ICJVs. To fulfill these objectives, a literature review was carried out and a questionnaire survey was performed with 38 professionals. The survey results reported "political instability" as the most critical risk, and market level risks were less critical than country and project level risks. Additionally, the results showed agreement on the risk ranking between building and infrastructure ICJVs, despite significant differences in the criticalities of five risks. Furthermore, five risks were preferably allocated to host and foreign partners, respectively, while 13 risks could be shared among partners. As few studies have explored the risk allocation preferences in ICJVs, this study expands the literature. Also, the identification of the risks allows other companies to customize their own lists of critical risks, while the preferred risk allocation provides valuable information for companies from various countries that intend to form ICJVs with developing countries. Thus, this study contributes to the global body of knowledge relating to ICJVs.

  • PDF

A Study on Risk Based Project Management Office (리스크에 기반한 전사 PMO에 관한 연구)

  • Sung, ShiChang;Lee, SeoukJoo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2017.04a
    • /
    • pp.704-707
    • /
    • 2017
  • 오늘날 기업에서 프로젝트의 성공은 기업 전략 달성에 필수 요소이다. 프로젝트가 많아지고 프로젝트의 중요성이 커지면서 프로젝트의 성과 향상의 방안으로 PMO(Project Management Office)를 운영하는 사례가 늘고 있다. 전사 PMO는 기업의 전략과 프로젝트 간에 연결고리 역할을 하며 기업 내 다수의 프로젝트를 관리함으로써 기업 전략 달성을 도모하지만 대부분 부족한 인력과 자원으로 운영되고 있다. 리스크가 높은 프로젝트에 한정된 인력과 자원을 집중할 수 있다면 프로젝트 성공 가능성을 높이고 기업 전략 달성에 보다 이바지 할 수 있을 것이다. 본 논문에서는 프로젝트 리스크를 기반으로 PMO를 운영하는 방법에 대하여 다루고자 한다.

Technical Management Planning Process of Engineering Project (개발 프로젝트의 기술관리 계획 프로세스)

  • Yoo, Il Sang;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.2
    • /
    • pp.63-68
    • /
    • 2005
  • This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.

  • PDF

A Decision Support Model for the Exchange Risk Management of Overseas Construction Projects (해외 건설 프로젝트의 환리스크 관리를 위한 의사결정 지원 모델)

  • An, Chi-Hoon;Yoo, Hyun-Seok;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.109-121
    • /
    • 2012
  • Overseas construction project orders have shown steady increase since 2001, and it took 44.5% of the total construction project orders in 2010. Overseas construction project needs more complex risk management because it is affected by more various circumstance factors than the domestic construction is. Previous studies have centered on the internal risk factors to assist the decision-making, but there are few researches on the importance and techniques of foreign exchange risk management. Inadequate management of foreign exchange risk has been found to cause huge damages due to the lacking recognition on the importance of foreign exchange risk management. Therefore, current study designed a foreign exchange risk manage model to help efficient management and decision-making. This model was developed as a technique to meet the demand of the increasing overseas construction projects for the efficient management of foreign exchange risk, and the technique will lower the risk with more and more accurate outcome by accumulating the data of profit-and-loss.

Cause Analysis of Cost Overruns in International Infrastructure Project Conducted by Korean Contractors (해외토목 원도급사업의 원가상승 원인에 관한 연구)

  • Jung, Wooyong;Han, Seungheon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.105-116
    • /
    • 2017
  • In recent years, large Korean construction companies have suffered serious losses in their overseas business. Many practitioners and researchers have analyzed causes of cost overrun in these projects. However, these arguments have not been empirically verified based on acutal project cases. This study investigated cost overrun rate, contingency, allowance, predicted risk before bidding, and actual and residual risk after award in the 67 international infrastructure projects conducted by 13 large construction companies. The causes of cost overruns are derived as follows. First, they identified the possibility of cost overrun to some extent before the bidding, but did not reflect the enough risk money to bid price. In particular, this behavior was more severe in badly cost-overrun projects. Second, the causes of cost overrun were more influenced by external environmental risk than internal capability risk. However, the internal risk in badly cost-overrun projects was relatively high compared to cost-underrun projects. Third, badly cost-overrun projects failed to mitigate risk. However, cost underrun projects were affected more by low exterior risk conditions than by well mitigated risk. This study provides more informed knowledge in controlling project costs in international infrastructure projects.

Extraction and Analysis of Construction Phase Risk Factors in High-rise Construction Project (초고층 건설공사 시공단계 리스크 요인 도출 및 분석)

  • Kim, Sooyong;Kim, Sunghyun;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.2
    • /
    • pp.90-98
    • /
    • 2016
  • High-rise buildings construction project have various risk factors. Major risk factors are negative results such as time delay and increase of costs. Therefore, this study was analyzed risk factors in construction stages of high-rise buildings using by PROMETHEE technique. For this, this research were identified risk factors through experts Focus Group Interview(FGI). And, PROMETHEE was used to setup evaluation standard for analysis of high-rise building construction risks. Next, the standard of evaluation index calculation was composed by using the definition level in PDRI. Preference function and evaluation index were identified through questionnaires. Through these processes, this study has calculated the importance of high-rise building construction risks using by PROMETHEE technique. As a result, high degree risk factors were as following. These are 'Operation plan of material lifting', 'Outrigger & Belt Truss Construction', 'Foundation work plan of high-rise building' and 'Considering a Structure concept of high-rise building'.

The Association between Food Group Consumption Patterns and Early Metabolic Syndrome Risk in Non-Diabetic Healthy People

  • Yeo, Rimkyo;Yoon, So Ra;Kim, Oh Yoen
    • Clinical Nutrition Research
    • /
    • v.6 no.3
    • /
    • pp.172-182
    • /
    • 2017
  • We investigated the association between dietary habits/food group consumption patterns and early risk of metabolic syndrome (MetS), a main cause for metabolic disease. Study participants were recruited from the health promotion center in Dong-A University Hospital and public advertisement. Study subjects (n = 243, 21-80 years) were categorized into three groups: Super-healthy (MetS risk factor [MetS RF] = 0, n = 111), MetS-risk carriers (MetS RF = 1-2, n = 96), and MetS (MetS $RF{\geq}3$, n = 27). Higher regularity in dietary habits (breakfast-everyday, regular eating time, non-frequent overeating, and non-frequent eating-out) was observed in the Super-healthy group than in the MetS-risk carriers, and particularly in the MetS subjects. The relationship between food group consumption patterns and MetS-risk related parameters were investigated with adjustment for confounding factors. Fruit consumption was positively associated with HDL-cholesterol, and tended to be negatively associated with waist circumference, triglyceride, LDL-cholesterol, and insulin resistance (IR). The consumption of low-fat meats and fish, and vegetables was negatively associated with hs-CRP. Specifically, the consumption of seafoods belonging to the low-fat fish was negatively associated with fasting glucose, hs-CRP, and interleukin (IL)-6. Anchovy/dried white baits consumption was negatively associated with fasting insulin and IR. Green-yellow vegetables consumption was negatively associated with fasting insulin, IR, and hs-CRP. On the other hand, sugars and fast-foods were positively associated with LDL-cholesterol. Additionally, fast-foods consumption was positively associated with hs-CRP and IL-6 levels. In conclusion, dietary habits/food group consumption patterns are closely associated with MetS-risk related parameters in Koreans. It may suggest useful information to educate people to properly select healthy foods for early prevention of MetS.

A Study of the Risk Analysis Technique Optimization in the Pre-Project Evaluation Phase of the Development Projects (개발사업 사전평가단계에 적용하는 위험분석기법 최적화 연구)

  • Kim, Han;Kim, Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.517-520
    • /
    • 2008
  • The city refreshing development projects in the domestic recently have been performed under leading of public institution laying stress on new city and existing urban district. These development projects are still staying in safety control level despite risk factor management at preliminary estimation stage has been more important factor to success and add value creation. Understanding inaccurately about various risk analysis techniques that can analyze risk factors and the insufficient application of step that can analysis technique s could make projects more difficult. Therefore, this research suggests the more effective methods for risk analysis that can control the risks in the pre-project evaluation stage.

  • PDF

Development of safety system for Road Tunnel - The study of Quantitative risk assessment for middle scale road tunnel with natural ventilation system - (도로터널 방재시스템 개발 - 자연환기를 수행하는 중규모 도로터널의 정량적 위험도평가관한 연구 -)

  • Yoo, Ji-Oh;Shin, Hyun-Jun;Kim, Jong-Won
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.67-70
    • /
    • 2008
  • As a part of the project on road tunnel fire safety system development, Quantitative Risk Assessment program was developed. In this study, We carried out Quantitative Risk Assessment with this program by using a factor of cross passage interval, warning announcement time and congestion ratio etc for 1km tunnel with natural ventilation. In the case of 250m below of cross passage interval, Risk value due to warning announcement time was a slightly changed. but if cross passage interval is more than 250m, expected fatalities in the same HRR(heat release rate) was sharp increased. As a result, Quantitative Risk Assessment program which was developed in this research project is possible to risk assessment with ventilation type, cross passage for evacuation and detection system response property etc. hereafter, this program look forward to use as a tool for road tunnel performance based design.