• Title/Summary/Keyword: Project priority

Search Result 408, Processing Time 0.029 seconds

A Study of FMEA for Selecting Priority Safety Unit;focusing on the cases of steel frame work (중점 안전관리 항목 도출을 위한 FMEA활용 방안;철골 공사 사례를 중심으로)

  • Park, Chan-Jong;Song, Ji-Won;Ryu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.502-506
    • /
    • 2006
  • For advanced construction safety, there frequently are repeated accident. Most of them are serious disasters which are continually concerned. But technical method of Safety organizations for construction project is still short, simple and unscientific. We suggest FMEA(Failure Mode and Effect Analysis) process on the safety management. The purpose of study is an establishment of safety system focused on scientific method by selecting priority unit and by figuring importance.

  • PDF

Finding Subjects for Automated Container Terminal Development by Systems Approach (시스템적 접근에 의한 자동화컨테이너터미널 개발 과제 도출)

  • 박창호;노홍승;정의균
    • Journal of Korean Port Research
    • /
    • v.12 no.2
    • /
    • pp.243-250
    • /
    • 1998
  • This study is to find subjects for the Automated Container Terminal(ACT) development and container terminal system. Also we analyze the present condition of the container terminal system in Pusan port and its automation level by systems approach. And this paper aims at evaluating on the priority of R&D investment until the beginning of the second stage of New Pusan Port Project(2006). In this process we have considered 8 evaluation indexes(cost, labor, area, time, volume, reliability. safety, convenience) to analyze 6 subsystems. The priority of R&D until target year by sub-systems is as follow: 1. Cargo Handing System, 2. Transfer System, 3. Port Entry System, 4. Storage System (Distribution & Manufacturing System included), 5.Inland Transport System, 6.Port Management & Information System.

  • PDF

The Improvement of Wetland Conservation Plan for Upo Wetland Protected Area (우포늪 습지보호지역 보전계획 개선방안)

  • Kim, Su-Ryeon;Song, Won-Kyong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.22 no.4
    • /
    • pp.65-80
    • /
    • 2019
  • The Wetland Conservation Plan is used as a tool to set the management direction of wetland protected areas, and which is establishing a plan for the conservation, wise-use, and management based on wetland's condition. This study was conducted to establish a conservation plan considering the functions and management conditions of Upo wetland protected area. To this end, there are analyzed the current issues, plans and implementation status of Upo Wetland Conservation Plans in the past. The management elements to be considered in establishing the Wetland Conservation Plan were selected through prior research analysis and the priority of those elements was identified through the AHP. As a result, it was found that lack of considering the changes and performance evaluation of the existing plans in wetlands, conducting short-term projects related to maintenance original function of wetland, different management methods for wetland protected areas and other adjacent areas, lack of understanding and cooperation by stakeholders, inconsistencies in timing of the Conservation Plan and survey of wetland protected areas. In order to improve the problem, it needs to include the performance evaluation stage of establishing the conservation plan, strengthen cooperation of stakeholders and expertise, continuing of projects for wetlands' maintenance, priority of the project considering the management side, and to adjust the timing of plans to improve data availability.

Establishment of Priority Update Area for Land Coverage Classification Using Orthoimages and Serial Cadastral Maps

  • Song, Junyoung;Won, Taeyeon;Jo, Su Min;Eo, Yang Dam;Park, Jin Sue
    • Korean Journal of Remote Sensing
    • /
    • v.37 no.4
    • /
    • pp.763-776
    • /
    • 2021
  • This paper introduces a method of selecting priority update areas for subdivided land cover maps by training orthoimages and serial cadastral maps in a deep learning model. For the experiment, orthoimages and serial cadastral maps were obtained from the National Spatial Data Infrastructure Portal. Based on the VGG-16 model, 51,470 images were trained on 33 subdivided classifications within the experimental area and an accuracy evaluation was conducted. The overall accuracy was 61.42%. In addition, using the differences in the classification prediction probability of the misclassified polygon and the cosine similarity that numerically expresses the similarity of the land category features with the original subdivided land cover class, the cases were classified and the areas in which the boundary setting was incorrect and in which the image itself was determined to have a problem were identified as the priority update polygons that should be checked by operators.

Analysis of Limitations on Human Reliability Analysis in Nuclear Power Plants and Development of Requirements for an Advanced Method (원자력발전소 인간신뢰도 분석의 한계점 분석과 차세대 방법을 위한 요건 개발)

  • 정원대;김재환;장승철;하재주
    • Journal of the Korean Society of Safety
    • /
    • v.14 no.2
    • /
    • pp.178-191
    • /
    • 1999
  • More than twenty methods were suggested for Human Reliability Analysis (HRA) in the field of safety analysis for Nuclear Power Plants (NPPs). However, there is still a high uncertainty on the analysis and a difficulty in performing HRA. New methods and approaches are under studying to overcome such limitations of current HRA. This paper presents some results of study to analysis limitations of current HRA in viewpoint of user, i.e., HRA analyst. The limitation analysis was based on 89 human error events modeled in a Probabilistic Safety Assessment (PSA) project for NPPs in Korea. Total 17 specific limitations were identified and categorized into seven groups. Important analysis has also been undertaken to assess the order of priority among those limitations. Finally, seven requirements with priority ranking were generated for an advanced framework and methodology of HRA.

  • PDF

Establishing the Development Priority of Undeveloped Urban Parks Using GIS (GIS를 이용한 미시설공원의 개발 우선순위 설정 연구)

  • 김윤종;이인성;이석민
    • Spatial Information Research
    • /
    • v.6 no.1
    • /
    • pp.35-45
    • /
    • 1998
  • In order to support effective decision-makings related to greenery planning, this study construct a fundamental database about greenery information for Seoul metropolitan area using GIS and Remote Sensing. Greenery evaluation index consists of ecological/ environmental, utilization, social condition value which are used to determine the development priority of undevelopment parks. These indexes will also be utilized for the green area conservation classification for Seoul metropolitan area. This study is a part of previous project called "Management Policy of the Total Amout of Greenery", which was conducted in Seoul Development Institute.Institute.

  • PDF

Strategic Allocation of the Limited Same Resource by Program Management Office Considering Financial Values (재무 가치를 고려한 PMO의 전략적 동일 한정 자원 배분)

  • Hwang, Jin-Ha;Kim, Ju-Han;Hwang, Jee-Yeon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.24-31
    • /
    • 2012
  • Priority rules or sequencing heuristics conventionally used to determine resource allocation is to maximize the earned value on time and cost. This study provides a effective strategy-oriented approach for the program resource management problem with limited same resource, which systematically connects individual project objectives to the overall organizational goal, by introducing financial values as well as priority rules in a broader context. It deals with the resource allocation problem as the decision making problem in the strategic management paradigm to meet business objective and solves it using the analytic hierarchy process, and explains the method of application and usefulness through some simulation cases.

Study of the BIM technology, market trends and visions in the design phase (설계단계에서 BIM 기술, 시장 동향 및 비전에 관한 연구)

  • Lee, Da-un;Yun, Seok-heon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.215-216
    • /
    • 2015
  • In order to facilitate the introduction of BIM technology in the construction project of fact, many countries such as Singapore and the United States, is developing a roadmap of BIM technology development. To develop this, recently, it must be analyzed in advance the state of BIM technology domestic projects. In this study, we define the elements of technology BIM, and analyzed the current situation. In addition, I was evaluated and priority importance to the elemental technology derived. As a result, elemental technology most was the level inferior to foreign countries, and the field of ordering standard planning and has been highly valued and priority of particular importance, but currently, the level of domestic, analysis and most delayed has been. These results are judged to be useful in the development of the roadmap and direction of technological development of BIM in the future.

  • PDF

PROPOSING MANAGEMENT OF WORK PRIORITY TO REDUCE CONSTRUCTION FAILURE CLAIMS

  • In-ho Kim;Moon-Seo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1171-1176
    • /
    • 2005
  • Dispute related to construction projects involving numerous persons is one of the biggest challenges faced by contractors today. It costs a substantial amount of money and time in resolving these kinds of claims. Recently, with the changes in the construction environment and thought of relation with owner, the number of construction claims has increased. But, a majority of these claims do not prevail, and in fact, frequently get dismissed in its entirety. The reasons for such dismissals include the ignorance about the claims, lack of clear and convincing evidence, and so on. But most of reasons are the claims are not managed well on construction process. This paper analyzes the failure causes by relying on past claim failure cases, and then drew works that have connection with failure causes through interview. It also presented importance degree of construction management works.

  • PDF

Needs Analysis on Experience, Collaboration, Enquiry based Learning of College Students

  • Yena Bae;Danam Kwon
    • International Journal of Advanced Culture Technology
    • /
    • v.12 no.3
    • /
    • pp.336-344
    • /
    • 2024
  • The purpose of this study is to analyze the need of college students for experiential learning, collaborative learning, and enquiry-based learning. To achieve this goal, a survey was conducted with 308 college students. The need for experience, collaboration, and enquiry-based learning was comprehensively analyzed through t-tests, Borich needs analysis, and priority determination using The Locus for Focus model. The research findings are as follows: First, in Borich need analysis, the highest needs were identified for deep learning, self-directed learning, connecting theoretical knowledge with practical application, immersion, and application to real-life situations. Second, in The Locus for Focus model, the highest needs were found for abstract conceptualization, interest, conflict management, self-directed learning, and curiosity. In summary, since self-directed learning showed the highest priority simultaneously in Borich need analysis and The Locus for Focus model, it should be considered as the most prioritized item.