A Study on the Effect of R&D Project Management System on R&D Project Performance: Focusing on the Mediating Effects of Integrated Management and Life Cycle Management (R&D 프로젝트관리시스템이 R&D 프로젝트성과에 미치는 영향에 대한 연구: 통합관리 실행 및 전주기관리 실행의 매개효과를 중심으로)

  • Jongho Won;Sungyong Choi;Heekyung Kim;Sohyun Park
    • Journal of Information Technology Services
    • /
    • v.22 no.3
    • /
    • pp.65-83
    • /
    • 2023
  • Due to the development of modern technology and the enlargement of industrial scale, the scale of many projects is expanding and the complexity is also increasing. Individual management of existing projects cannot effectively manage projects in this trend, and it is necessary to systematically manage the entire process from initiation to completion. Accordingly, the need for integrated management and life cycle management that can efficiently manage the entire project is emerging, and for this, a systematic project management system is also required. PMS enables efficient project management by linking business processes such as resource, schedule, scope, and output management of a project with separately separated infrastructure accordingly. In this paper, a research model was proposed to manage the project from the perspective of implementing integrated management and life cycle management, especially during R&D project execution, and to prove the mediating role between PMS and R&D project performance for this purpose. The proposed research model will be able to help companies and organizations that feel the need to implement integrated management and life cycle management and are preparing to build a PMS-type system or that have already been established to efficiently perform project management.

INTEGRATED LIFE-CYCLE COST ANALYSIS CONSIDERING ENVIRONMENTAL COSTS: A HIGHWAY PROJECT CASE

  • Woo-Sik Jang;Heedae Park;Sungmin Kim;Seung Heon Han;Jong Seo Jeon
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.273-279
    • /
    • 2011
  • Concerns over the environment have spawned a number of research studies in the construction industry, as the construction of built environments and large infrastructures involves diverse environmental impacts and loads of hazardous emissions. Many researchers have attempted to quantify these environmental loads, including greenhouse gases, carbon dioxide, nitrogen dioxide, and sulfur dioxide, to name a few. However, little research has been conducted regarding integrating the life-cycle assessment (LCA) of environmental loads with the current life-cycle cost analysis (LCCA) approach. This study aims to estimate the environmental loads as a monetary value using the European Climate Exchange (ECX) rate and, then, to integrate those impacts with the pure construction cost. Toward this end, this study suggests an integrated approach that takes into account the environmental effect on the evaluation of the life-cycle cost (LCC). The bill of quantity (BOQ) data of a real highway project are collected and analyzed for this purpose. As a result, considering the environmental loads in the pavement process, the total LCC increased 16% from the traditional LCC cost. This study suggests an integrated approach that will account the environmental effect on the LCC. Additionally, this study is expected to contribute to better decision-making, from the perspective of more sustainable development, for government as well as for contractors.

  • PDF

Exploring the Effect of Beneficiary Engagement on International Development Projects' Performance: a Project Life Cycle Perspective

  • Anintya HAPSARI;Ying-Yi CHIH
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.855-862
    • /
    • 2024
  • Many international development (ID) projects have continued to fail to deliver their intended socio-economic benefits to the beneficiary (i.e., a group of primary recipients of these benefits). In this research, drawing from project stakeholder and benefit management literature, we investigated how ID project performance is perceived by beneficiary, how beneficiary is engaged, and how such engagement contributes to ID project performance. The results from thirteen semi-structured interviews with those leading beneficiary engagement in ID projects in Indonesia showed that, as compared with other projects, ID projects place a stronger emphasis on benefit realization when it comes to performance evaluation given their focuses on achieving socio-economic objectives. Beneficiary engagement during the entire life cycle was found to be critical to benefit realization in ID projects. Although the specific methods employed can vary, the beneficiary engagement in ID projects usually take a participatory and longer-term perspective, aiming to facilitate not only the benefit realization but also the sustainability of the benefits over time. This research extends prior project stakeholder and benefit management literature to a specific stakeholder group (i.e., beneficiary) in a unique context (i.e., ID projects). It also offers practical insights to assist organizations effectively plan and manage beneficiary engagement in future ID projects.

BIM based Construction Project Case Analysis for Facility Life Cycle Management from the Perspective of the Client (발주처 관점의 시설물 생애주기 관리를 위한 BIM 기반 건설 프로젝트 사례 분석)

  • Ham, Nam-Hyuk;Kim, Woong-Gi;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.10 no.3
    • /
    • pp.12-21
    • /
    • 2020
  • From the perspective of the client, the value of information for use in facility management is very low at the point of use. This is because the facility owner, who is a non-professional, cannot accurately request necessary information from the perspective of long-term facility life cycle management. The purpose of this study is to define the information necessary for facility management and to analyze the project operation method to procur this information to the client using BIM. To this end, this study analyzed the role of client and contractor, project delivery process, standards, and submissions in the BIM-based procurement area through USACE Air Force Hospital project case analysis. As a result of the analysis, if the client, who is the subject of facility operation, defines in advance the type and input method of necessary information in the operation stage, the client can receive the BIM optimized for operation from the contractor. The results of this study can be used to establish standards for receiving information necessary for establishment of procurement process and facility management of public institutions considering BIM introduction.

Practical Issues of Earned Value Management Systems (EVMS) for Nuclear Power Plant (NPP) Construction

  • Jung, Youngsoo;Kim, Sungrae;Moon, Byeong-Suk
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.696-697
    • /
    • 2015
  • Cost, schedule, and quality are the three major performance indicators for any construction project. Under the globalized competition in the nuclear industry, researchers and practitioners have also explored a systemized and integrated management system for cost, schedule, and quality. In order to address this issue, the concept of earned value management system (EVMS) has been often utilized. However, implementing EVMS for a mega-project of nuclear power plant (NPP) construction requires extensive overhead efforts. Though previous studies proposed structures and methods for effective NPP EVMS, there has been no legitimate study for data collection strategy for practical implementation. In this context, the purpose of this paper is to develop an effective data collection strategy for NPP EVMS. Firstly, the barriers to practical NPP EVMS were identified based on literature review and expert interviews. Strategies for data collection were then developed based on different phases of project life cycle. This study focuses on the 'life-cycle integrated progress management system' for NPP construction from an owner's perspective Therefore, results of this study can be used as a guide for preparing request for proposals (RFP) of an NPP owner organization.

  • PDF

A Software Architecture Life Cycle Model Based on the Program Management Perspective : The Expanded Spiral Model (프로그램 관리 관점에 기반을 둔 소프트웨어 아키텍처 생애주기 모델 : 확장된 나선형 모델)

  • Koh, Seokha
    • Journal of Information Technology Applications and Management
    • /
    • v.20 no.2
    • /
    • pp.69-87
    • /
    • 2013
  • The expanded spiral model in this paper consists of five processes of architecture design, architectural construction, architectural maintenance, operation, and architectural management. The former four processes are executed alternatively, while the latter architectural management process is executed continuously interacting with the other processes during the whole life cycle of the system. The expanded spiral model provides a conceptual framework to sort discussions of architectural degeneration into those of product-oriented processes and those of management processes, making it possible to incorporate the models and body of knowledge about project and program management especially those of Project Management Institute, into discussions of architectural degeneration. A good architecture decomposes the software-intensive system into components mutually interacting in a well-formed structure. The architecture design process and the architectural construction process together create the object system with well-designed architecture. The architectural maintenance process prevents the implemented architecture deviate from the designed architecture. The architectural management process monitors the changes of requirements including architecturally significant requirements, supports the other processes to be executed reflecting various perspectives of stake-holders, and creates and documents the reasons of architectural decisions, which is considered as a key element of the architecture.

Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Project: Contractor's Perspective

  • Hahn, Ki Jeong;Lee, Eul-Bum;Kim, Young Ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.718-719
    • /
    • 2015
  • As a recent global trend, the majority of plant projects are delivered through EPC or EPC-turnkey contracts, where a contractor's liability is more complicated because of the mega size scale and financing method. Previous researches have been lacking a practical usability for project members for liabilities of contracts. Those were focused on solving the claims or schedule calculation issues only. The objective of the present study was to develop a validation process for LDs (liquidated damages) in contractor's liabilities with various case studies and expert judgments. As summarized in this paper, the processes and tools were developed with project life cycle process. The project preparation phase includes 3 step check lists to determine the Go or No-go for projects. In progress phase, contractors should focus on the response strategies for claims with liabilities. The study concludes that those developed processes and tools will help to manage risk of LDs for the contractors in the overseas projects.

  • PDF

The Development of Urban Metro Maintenance Facility System Using Construction Classification System Management (공종분류체계를 활용한 도시철도 시설물 유지관리시스템 개발)

  • Hyun, Ji-Hun;Yang, Byong-Soo;Moon, Sung-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.69-77
    • /
    • 2012
  • The construction data should be controlled from the life-cycle perspective. The current PMIS (Project Management Information System) usually focuses on the construction operation stage. The PMIS does consider the utilization of the construction in the maintenance of constructed facilities. This paper tries to interface the construction data with the maintenance data for effective use of construction data in the life-cycle perspective. To achieve the research objective, a maintenance breakdown structure is established and connected to the work breakdown structures. The connection of the two breakdown structures provide a structured utilization of construction data for efficient maintenance work activities. A prototype suggests that the interface of maintenance and work breakdown structures can help provide a construction and maintenance data in a more efficient way for maintenance activities.

Identifying the Organizational Competency Factor for Implementing AWP (Advanced Work Packaging) in perspective of Korean EPC Contractor (AWP (Advanced Work Packaging) 체계 도입을 위한 국내건설기업의 필요 조직역량 도출 연구)

  • Moon, Soohwan;Yun, Sungmin;Park, Chan Young;Cho, Tae Sang;Han, Seung Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.3
    • /
    • pp.20-27
    • /
    • 2020
  • EPC contractors have made continuous efforts to develop integrated project execution methods to improve the performance of industrial plant project. In particular, the concept of Advanced Work Packaging (AWP) has been recently presented by readjusting the existing "Work Packaging" concept as part of the integrated project execution method from the project life-cycle perspective. However, Korean EPC contractors are still unfamiliar with the AWP implementation. Thus, this study aims to identify the organizational competency factor for effective implementation of AWP. For this purpose, first, this study identified the expected risks in AWP project and the 29 organizational competency factors to manage risks. Second, five experts verified the suitability of factors and supplemented the factors. Finally, 37 factors were identified as organizational competency factors for implementing AWP.

The Perception Research on the Career Development of the Non-Certified Qualification Acquisitors of National Construction Management (국내 건설사업관리(CM) 민간자격 인증자들의 경력개발에 대한 인식조사)

  • Yu, Hoe-Chan;Ahn, Hyoung-Jun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.231-234
    • /
    • 2009
  • Recently, the roles of the construction engineers become more important in all phases of construction project life cycle. Construction engineers' capabilities is one of the key factors to accomplish construction project objectives. After acquiring basic Knowledge and skills in colleges, the construction engineers have opportunities to develop their abilities through continuous education provided by companies, associations, colleges, and so on. The current eduction system is not sufficient enough to assist engineers to develop their potentials. The construction professionals training system that help career development, career management, education and training is need to raise excellent engineers in a long term perspective. In order to investigate the necessity and the element in the career development support, I perfromed the perception about the career deveolopment by doning question investigation.