Efficient Application of Multi-Trade Contract Method to Public Construction Project (공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner's role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner's management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner's organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades.

Problems and Solutions for the Private-funded Railroad Station Project Management (철도 민자역사 사업수행체계 개선방안)

  • Park Chan-Sik;Jeon Yong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.172-180
    • /
    • 2004
  • Recently, there are growing concerns on the introduction of private financing in railroad station construction project. But private-funded station project does not have the efficient delivery system. This study is focused on the recommended solutions about the private-funded station project management. Through the literature survey and interview, it is investigated and analyzed that project management has the problems. The problems are classified as 2 areas: law & regulations and job practice. The problems in law & regulations are a lowing on the profitability, and an unreasonable project team selection process. Job practice has problems such as delaying in authorization process, and inferior feasibility analysis. The study suggests several recommended solutions related to the problem areas. That are as follows: the efficient return of investment system, the project financing system, the professional project management, the benchmarking team operation, and the cut down on discussion period

A Study of Factors Influencing Delivery Methods Selection on Public Construction Projects (공공공사 발주방식 선정에 영향을 미치는 요인 연구)

  • Kim, Dae-gil;Lee, Ung-Kyun;Lee, Hak-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.218-219
    • /
    • 2014
  • The selection of an appropriate contract method is vital for the successful operation of the project. However, there has been a lack of studies on objective decision making support models for use in the planning stage of a project contract. The present study had the goal of analyzing the factors that influence contract method selection, as an initial study for developing a project contract method selection model. The existing related studies were analyzed, and the factors considered in the literature were selected. Then, based on the findings, the opinions of an expert group on the important factors for contract method selection were collected through a survey. The collected opinions were analyzed using factor analysis, a statistical analysis method. The results will be utilized in the future as preliminary data for developing a decision making model for selecting a contract method.

  • PDF

A study on the Application of Operation Model for Technical Proposal-Based Tender of Large Construction Project (대형공사에 효율적인 기술제안형 입찰방식 적용에 관한 연구)

  • Cho, Sung;Cho, Yong;Paek, Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.591-596
    • /
    • 2008
  • Success or failure highly depends on delivery method in construction projects. This paper mainly focused on operation model for technical proposal in Large construction projects. This operational model uses Technical Proposal-Based Tender. This project studied order and delivery method in large construction projects. And delivery systems of international and domestic market are researched, and then condition of delivery system and problems are derived from them. Especially, it researched that it is hard to reflect special feature in large construction projects. As a result of having referenced idea as describe above, this paper will be studied by this process. First, definition of delivery method and large construction projects is researched. Second, delivery systems of international and domestic market are checked. Third, problems and condition of delivery system in large construction projects are investigated. Fourth, application of operation model for technical proposal-based tender are presented in large construction projects.

  • PDF

Development of an Operation Model for Technical Proposal-Based Tender of Public Construction Projects (공공건설공사의 기술제안형 입찰 운영모델 개발)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.136-145
    • /
    • 2008
  • Recently the Ministry of Finance and Economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". These project delivery systems require the bidders to submit technical proposal adjusted to the project characteristics and objectives for selecting the contractor by evaluating technical proposals. This research aimed to suggest guideline to effectively operate the project delivery systems described above. To reach the goal of the research, the framework of the operation model was developed, which includes the four categories: the standard bidding process, the technical proposal requirements, the technical proposal evaluation criteria, and the award methods. The contents of the four categories above were fulfilled throughout conferring with the advisory experts. In particular, the award methods, which are the important decision-making factor in the perspective of the owner, consist of four types: Low Bid-Fully Qualified, Weighted Criteria, Adjusted Bid, and Adjusted Score. The quantitative features and application criteria of these four types of award methods were suggested throughout the simulation using the virtual case.

Project Implementation an Management for the State of the Art Computerized Supervisory Systems (최신의 컴퓨터기술을 적용한 원방감시시스템의 사업수행과 관리)

  • 윤갑구
    • Journal of the Korean Professional Engineers Association
    • /
    • v.26 no.3
    • /
    • pp.69-79
    • /
    • 1993
  • This paper explains about general considerations and project management for a State of the Art utility supervisory systems. [1] The implementation and management of a supervisory system design project requires both a dedication of resources and application of good communications in order to be suc-cessful. [2] Success is on time delivery of a system to a satisfied customer at the proposal cost, [3] The recent experience of a company plus the collected comments from a number of ex-perienced control center project management provide a guideline for the company who is considering such a project. The Comments reflect typical situations or decision points faced by the project Manage.[2] This paper also attempts to help engineers in the task of specifying buying, and instal-ling a supervisory system[1]

  • PDF

Formulation and In vitro Evaluation of Transdermal Drug Delivery System for Galantamine

  • Hossain, Md. Kamal;Subedi, Robhash Kusam;Chun, Myung-Kwan;Kim, Eun-Jung;Moon, Hwan-Shik;Choi, Hoo-Kyun
    • Journal of Pharmaceutical Investigation
    • /
    • v.41 no.1
    • /
    • pp.1-7
    • /
    • 2011
  • The effects of different formulation variables including pressure sensitive adhesive (PSA), permeation enhancer, thickness of the matrix and loading amount of drug on the transdermal absorption of galantamine were investigated across the hairless mouse skin. The permeation profile of galantamine was different depending on the types of PSA, loading amount of drug, thickness of the matrix and type of enhancer used. Highest flux of galantamine was obtained from acrylic PSA but crystals were formed in the patch within 72 h. Among the PSAs screened, crystal formation was not observed only in the patches formulated in Styrene Butadiene Styrene (SBS) matrix. Permeation rate increased linearly as the concentration of galantamine in SBS matrix increased from 2.5 to 15% w/w. Among the enhancers screened, Brij$^{(R)}$ 30 provided highest flux of galantamine. Matrix thickness of 80 ${\mu}m$ was optimum for maintaining adhesiveness as well as consistently delivering galantamine for longer period of time.