Factors affecting road construction project performance in Addis Ababa, Ethiopia

  • Mekonnen Tibebu CHEKOL;Michael HENRY
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.1112-1119
    • /
    • 2024
  • Addis Ababa, the capital of Ethiopia, has been lacking an adequate road network to ensure community access to social, political, and economic resources and to facilitate economic development. The road network coverage was about 22.5% in 2022, which is below the minimum international standard of 25%. To improve accessibility and mobility, the Addis Ababa City Roads Authority(AACRA) has engaged its own force crew (contractor), as well as local and foreign road contractors, in the construction of urban roads. However, these road construction projects are rarely completed within the estimated time and cost, along with a variety of other issues that also need to be addressed. This study aims to explore the application of lean construction for improving the performance of urban road construction projects in Addis Ababa City. A survey of road construction stakeholders was carried out to evaluate their perspectives on the importance of project performance indicators, with the goal of identifying key factors affecting road construction project performance. First, a list of performance indicators was prepared based on a review of lean construction literature, and a total of 38 identified factors were grouped into six performance indicator categories. Cross-tabulation analysis of the stakeholder perspectives was then carried out, and it was found that the indicators that affect the performance of urban road infrastructure projects (in descending order of importance) were: time, quality, cost, risk, safety, and sustainability. Through this analysis it was concluded that right-of-way issues, delay to finish, inflation, contractor capacity, and scope change with change order are also major factors that affect the performance of urban roads construction projects. Clarification of these factors will provide AACRA with useful information on what aspects of lean construction should be prioritized when evaluating future construction projects.

A Case Study on the Quality Management of Construction Site through PDCA Cycle (PDCA Cycle적용을 통한 건설현장 품질관리에 관한 사례연구)

  • Baik, In-Whee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.49-56
    • /
    • 2008
  • According to the recent trends which are the diversity of customer requests and the multi-function of buildings, A construction company's business has converted from the producer-oriented approach to the consumer-oriented approach. Therefore, each construction company is continuously trying to improve the quality level as a way of corresponding to customer needs in these changing situations. The quality is one of the main management targets which judge the success of a project along with the schedule, the cost and the safety. As construction companies execute the quality management which they aimed at, it should be completed within the optimum schedule and the limit of the budget. Accordingly, the importance of the construction site management to complete a project is continuously increasing. The construction site management is the systematic method to perform the project goals such as the quality improvement, the cost saving and the safety management, which organically operate one another, by procuring the manpower, the material and the machine in the right time. Specially, as the construction industry has based on the construction site, the establish of systematic construction site management, which can effectively correspond sudden changes of the construction business environment, is essential to maximize the construction productivity. On top of that, the necessity of the quality management method is increasing to accommodate customer needs more spontaneously in the construction site. These endeavors could guarantee their competitive power.

Development of Evaluation Methodology on the Performance of BTL Sewer Rehabilitation Projects (하수관거정비 BTL사업의 효과분석 및 방안 수립 연구)

  • Song, Ho-Myeon;Cho, Jeong-Il;Ahn, Choong-Hee
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.24 no.6
    • /
    • pp.743-751
    • /
    • 2010
  • It requires an interim performance assessment for BTL business of the sewerage rehabilitation which continues from 2005 till now. Means, It is necessary to make an interim performance assessment and an analysis of an business effect of the sewerage rehabilitation BTL projects which still continues, and we presented an improvement method of the new sewerage rehabilitation project in future. This paper has conducted an analysis of the business effect for 3 local government BTL projects which are completed and under operation as of now in Jincheon-Gun, Cheongju-Si and Gangjin-Gun. As a method of business effect analysis, we conducted a business effect of the 3 places using the index set which we previously set for the business effect analysis. The index set in this research was sectionalized to an improvement effect of operating wastewater treatment plant, an benefit effect of the direct cost, an benefit effect of the indirect cost and an environment friendly effect. We, in this paper, conducted an business effect analysis for 3 sewerage rehabilitation BTL projects which are completed or under operation recently as a demonstration, however we judge that an business effect analysis shall be conducted in a stage that a significant time for operation has passed since the completion of the construction in order to induce an actual business effect of the sewerage rehabilitation BTL project.

Study on Substitution Effect caused by Application of BIM Simulation System to Mock-up Site (시공단계 현장 Mock-up의 BIM 기반 시뮬레이션 기법 적용에 의한 기대효과 분석 연구)

  • Jang, Se-Jun;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.147-151
    • /
    • 2008
  • Construction project is completed through several stages and problems of each stage affect directly not only now but also next. Defect of 2D drawings influence in construction phase, and it make many loss on project. Nowadays we practically use real Mock-up test in construction sites to solve the problems. But it also has many problems which are waste much money and time. Therefore, this study tries to analyze effect that is occurred by appling BIM Mock-up simulation instead of real Mock-up execution. These analysis is conducted by comparing two construction building site. These have same shape but one is made for BIM Mock-up, and another is real Mock-up. Comparison points of view are cost, time and operator's satisfaction. It is expect that BIM Mock-up is more effective at low cost and on shorter time. But our analysis show that each are conducted different part of function. So new Mock-up type is required. Hybrid Mock-up is combine real mock-up with BIM simulation and it can minimize risk of project.

  • PDF

The Economic Effect of Besides Fisheries Profit and Input-Output Analysis: ocused on the Tae-an Trial Sea Farm Project (어업 외 투자효과 및 투입산출분석 : 태안시범바다목장사업을 중심으로)

  • Choi, Jong-Du
    • The Journal of Fisheries Business Administration
    • /
    • v.46 no.1
    • /
    • pp.109-119
    • /
    • 2015
  • This paper is to estimate the economic effect of benefits of the R&D and recreational fishing as well as input-output analysis in the Tae-an Trial Sea Farm Project(TTSFP). We use B/C model to indicate the effects of economic valuation. B/C analyses model consists of Benefit Cost Ratio(BCR), Net Present Value(NPV) and Internal Ration of Return(IRR). Using 5.5% discounting rates and the survey data, the sub-models show economically feasible in the all of analysis and analyzed the results as follows. NPV is 42,147 million won, BCR is 3.29 and IRR is 34.30%. This study attempts to apply input-output(I-O) analysis in connecting the economic effect of TTSFP. I-O model was constructed, focusing on three effects; the production-inducing effect, the value-added-inducing effect and employment-inducing effect. There are positive effects on economic value and job creation in Tae-an and Nation.

A Study on the Development of Decision Support Program for the Survey of Land Supply and Demand (토지 공급 및 수요조사를 위한 의사결정지원 프로그램 구축 연구)

  • Lee, Sanghun;Kim, Misuk;Lee, Yunsang
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.14 no.2
    • /
    • pp.79-90
    • /
    • 2018
  • This study aims to provide the system to help decision making by finding key indicators used in land supply and demand surveys, and by developing storage priority areas and projects. As problems arose such as the rising cost of public projects or disruptions to business progress due to the rapid rise in land prices and the cost of compensation for public projects in the past, a new land policy was adopted and the land reserve system was established in 2009. At that time, The bank's goal was to conserve 2 trillion won of land per year, but the result was sluggish as it accumulated a total of 1.6 trillion won from 2009 to 2015. The reason for this sluggish result is that the type and quantity of indicators are still extensive and the survey of land supply and demand has a problem of poor utilization. In order to make up for the sluggishness, we made key indicators used in land supply and demand surveys using the question investigation, and analyzed the priority of the project areas. This study provide the system to help decision making by finding key indicators used in land supply and demand surveys, and the priorities of project areas.

ECONOMIC ANALYSIS BY GLASS TYPES IN BALCONY CONVERSION OF MULTI-FAMILY HOUSING PROJECTS

  • H.G. Kim;D.I. Kim;D.W. Ko;T.H. Hong;C.T. Hyun;K.J. Koo
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.625-634
    • /
    • 2007
  • Energy-saving is one of important issues in multi-family housing projects in South Korea. According to the study by Yu et al. (2002), the balcony conversion causes energy loss approximately one and a half times. Therefore, it is important to select the economical glass type in the balcony window. In order to identify the most economical glass type of balcony conversion in multi-family housing projects, the most typical type of the multifamily housing projects in the metropolitan area was selected as a candidate project. The selected candidate project has been simulated using ENERGY-10 program to estimate the heat load by the different five types of glasses as well as their life cycle cost analysis (LCCA) using present worth method. Finally, sensitivity analysis has been conducted to determine the most economical glass types under a different discount rate (interest rate) and service life of building.

  • PDF

Development of Construction Site Access Management Automation System based on Hand Vascular Pattern

  • Gu Taek Kim;Ji Woong Yeom;Kyong Hoon Kim;Choong Hee Han;Jae Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.499-505
    • /
    • 2009
  • Along with the changing pattern that the construction project is getting complicated, large-scaled and up-to-dated, necessity of efficient management of manpower and resources of the construction site is being increased. In particular, considering that the construction site requires a lot of labor force and in terms of the construction cost, labor cost shares 30-40%, labor management has become a very important factor. In this study, in order to support a stable and successful construction project implementation and supplement the existing system being utilized at the current site, construction site access management automation system based on hand vascular pattern, a biometrics system, is intended to be developed. Relevant theory for the system development and the problem of existing RFID system were evaluated and based on this findings, a system design and DB composition chart were envisaged. In addition, by applying this developed system to a number of sites, its result was analyzed

  • PDF

A Low-Cost Approach for Path Programming of Terrestrial Drones on a Construction Site

  • Kim, Jeffrey;Craig, James
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.319-327
    • /
    • 2022
  • Robots for construction sites, although not deeply widespread, are finding applications in the duties of project monitoring, material movement, documentation, security, and simple repetitive construction-related tasks. A significant shortcoming in the use of robots is the complexity involved in programming and re-programming an automation routine. Robotic programming is not an expected skill set of the traditional construction industry professional. Therefore, this research seeks to deliver a low-cost approach toward re-programming that does not involve a programmer's skill set. The researchers in this study examined an approach toward programming a terrestrial-based drone so that it follows a taped path. By doing so, if an alternative path is required, programmers would not be needed to re-program any part of the automated routine. Changing the path of the drone simply requires removing the tape and placing a different path - ideally simplifying the process and quickly allowing practitioners to implement a new automated routine. Python programming scripts were used with a DJI Robomaster EP Core drone, and a terrain navigation assessment was conducted. The study examined the pass/fail rates for a series of trial run over different terrains. The analysis of this data along with video recording for each trial run allowed the researchers to conclude that the accuracy of the tape follow technique was predictable on each of the terrain surfaces. The accuracy and predictability inform a non-coding construction practitioner of the optimal placement of the taped path. This paper further presents limitations and suggestions for some possible extended research options for this study.

  • PDF

PERFORMANCE EVALUATION FRAMEWORK FOR ENGINEERING CONSULTANTS OF TAIPEI RAPID TRANSIT SYSTEMS

  • Chien-Hui Sun;Nie-Jia Yau
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.426-431
    • /
    • 2011
  • The quality of performance evaluation on engineering consultants that provide design-related technical services is difficult to be measured, and only a handful of papers discussed the quality during the design stage. Although design cost is relatively far less than construction cost for a project, the decisions made in the design phase have a significant impact on the final products of the project, especially for large public construction projects. Therefore, this research focuses on reviewing and then establishing a performance evaluation framework for the consulting firms that execute detailed design and provide technical services for the Taipei Rapid Transit Systems (TRTS). By interviewing experts, this study first established a set of indicators to evaluate these firms' performance. Then, those indicators were incorporated into the four aspects of balanced scorecard (BSC) to establish the architecture of the evaluation mechanism. The weight of each indicator was calculated by analytic hierarchy process (AHP) from a survey conducted among experts. The results showed that the top-three indicators were quantity take-off, functions conformity, and budgeting. The framework of performance evaluation established by this study can be applied to measure service performance during the design stage. It not only facilitates the monitoring of consulting firms, but also helps to reduce unnecessary change orders and disputes during the construction stage.