Case Study on Development of Residential Building Cost Index Compilation Model (주택원가지수 산정모델 작성 사례연구)

  • Cho Hun-Hee;Lee Yoo-Seob;Kang Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.220-226
    • /
    • 2003
  • The Residential Building Cost Index which presents price variation of construction resources required in a residential building project in single value, has been compiled to evaluate appropriate level of the price variation. This research reviewed the compilation methodology for Residential Building Cost Index based on comparative analysis on domestic statistics and proposed the Residential Building Cost Index through a variety of case studies. It would facilitate monitoring the price variation of a residential building cost and contributes to enhancing the applicability of construction cost data.

An Empirical Study On Information Systems Operation Cost Estimation Model (정보시스템 운영사업 비용산정 모형 개발에 대한 실증적 연구)

  • Kim, Hyeon-Su
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.6
    • /
    • pp.1810-1817
    • /
    • 2000
  • The purpose of this research is to develop an estimation model for information systems operating costs. Current cost estimation practices and types of sytem management projects have been reviewed an analyses. Typical operating project types of information systems are determined. They are application system operation, help disk operation, network management and operation, and hardware management. For each type of projects, cost factors ar identified and a structure of cost estimation model is defined. Cost estimation models have been constructed and tested by 24 real operation projects data. Statistical analysis shows derived models are statistically significant. User groups' opinion on these draft cost estimation model has been surveyed and summarized. The results of this research can be used as a cornerstone for future research on operating cost estimation, and for cost estimation guideline of information systems operation projects.

  • PDF

Comparative Analysis of the Environmental Management Cost in Building Construction Sites (건축공사 환경관리비 운영체계 비교 분석)

  • Koo, Jakon
    • KIEAE Journal
    • /
    • v.10 no.4
    • /
    • pp.111-116
    • /
    • 2010
  • The environmental management is essential for construction projects. The environmental management cost for construction projects is used for various purposes to control the environmental pollution and treat the wastes generated from the construction sites. Six construction cases were analyzed to compare the environmental management cost. The proportion of environmental management cost for total construction budget should be higher than 0.70% in redevelopment projects and 0.30% in newly constructed buildings, respectively, but every six construction cases did not meet the legal requirement. Redevelopment projects expanded more environmental management cost than the newly constructed projects especially in noise control and wastes treatment. In case of apartment construction projects, the proportion of environmental management cost of redevelopment buildings is 2.4 times higher than the newly constructed buildings, but in all cases, paid more attention to the noise and waste controlling measures than the wastewater treatment. It is needed to ensure the cost-effectiveness of environmental management for achieving the eco-friendly construction sites.

A study on application method of "Result unit cost" to Nuclear Power Plant (NPP) construction cost estimating (원전 건설공사 실적공사비 단가 제도 도입을 위한 연구)

  • Park, Weon-Seob;Jang, Kyoung-su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.46-47
    • /
    • 2014
  • Recently, BAI(Board of Audit and Inspection of Korea) has recommended that "Result unit cost" of Korean government apply to national power plant construction project when plant owner corporations estimate budget price for tender. but nuclear industry have difficulties with this suggestion. the purpose of this study is to review the "Result unit cost" and problem with application of NPP construction cost estimating. And proposed the direction of application of "Result unit cost" to NPP construction cost estimating.

  • PDF

The Analysis of User Cost according to Timing of National Highway Pavement Maintenance-Focusing on the Maesang Bidge Section in Korea

  • Kim, Yunsik;Lee, Minjae
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.606-607
    • /
    • 2015
  • The traffic volume on the road shows various trends reflecting regional characteristics for monthly and hourly, and economic loss affecting users varies according to the selected period for the maintenance of road pavements. Therefore, in this study, the user cost (or delay cost) for monthly and hourly on the work zone near the Maesang Bridge Section on Poseung-Gu, Pyeongtaek-si, Gyeonggi-do was calculated using the time series models and VISSIM, and based on the result, the effect of user cost reduction according to the selection of best maintenance period was examined. The analysis result showed that the month of the lowest user cost occurred due to the maintenance of target section was January (10,293,258 KRW/Day×1km) and the month of the greatest user cost occurred was November (13,337,495 KRW/Day×1km).

  • PDF

Implementing an Application Tool of Life Cycle Cost Analysis (LCCA) for Highway Maintenance and Rehabilitation in California, USA

  • Kim, Changmo;Lee, Eul-Bum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.376-380
    • /
    • 2015
  • Life-Cycle Cost Analysis (LCCA) for highway projects is known as an effective analytical technique that uses economic principles to evaluate long-term alternative investment options, especially for comparing the values of alternative pavement design structures and construction strategies. In the Unites States, the 2012 Moving Ahead for Progress in the 21st Century Act (MAP-21) amended the United States Code to mandate that the United States Government Accountability Office (GOA) conducts a study of the best practices for calculating life-cycle costs and benefits for the federally funded highway projects in 2013. The RealCost 2.5CA program was developed and adapted as an official LCCA tool to comply with regulatory requirements for California state highway projects in 2013. Utilization of this California-customized LCCA software helps Caltrans to achieve substantial economic benefits (agency cost and road user cost savings) for highway projects. Proper implementation of LCCA for roadway construction and rehabilitation would deliver noticeable savings of agency's roadway maintenance cost especially in developing counties where financial difficulties exist.

  • PDF

Development of Evaluation Model for ITS Project using the Probabilistic Risk Analysis (확률적 위험도분석을 이용한 ITS사업의 경제성평가모형)

  • Lee, Yong-Taeck;Nam, Doo-Hee;Lim, Kang-Won
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.3 s.81
    • /
    • pp.95-108
    • /
    • 2005
  • The purpose of this study is to develop the ITS evaluation model using the Probabilistic Risk Analysis (PRA) methodology and to demonstrate the goodness-of-fit of the large ITS projects through the comparative analysis between DEA and PRA model. The results of this study are summarized below. First, the evaluation mode] using PRA with Monte-Carlo Simulation(MCS) and Latin-Hypercube Sampling(LHS) is developed and applied to one of ITS projects initiated by local government. The risk factors are categorized with cost, benefit and social-economic factors. Then, PDF(Probability Density Function) parameters of these factors are estimated. The log-normal distribution, beta distribution and triangular distribution are well fitted with the market and delivered price. The triangular and uniform distributions are valid in benefit data from the simulation analysis based on the several deployment scenarios. Second, the decision making rules for the risk analysis of projects for cost and economic feasibility study are suggested. The developed PRA model is applied for the Daejeon metropolitan ITS model deployment project to validate the model. The results of cost analysis shows that Deterministic Project Cost(DPC), Deterministic Total Project Cost(DTPC) is the biased percentile values of CDF produced by PRA model and this project need Contingency Budget(CB) because these values are turned out to be less than Target Value(TV;85% value), Also, this project has high risk of DTPC and DPC because the coefficient of variation(C.V) of DTPC and DPC are 4 and 15 which are less than that of DTPC(19-28) and DPC(22-107) in construction and transportation projects. The results of economic analysis shows that total system and subsystem of this project is in type II, which means the project is economically feasible with high risk. Third, the goodness-of-fit of PRA model is verified by comparing the differences of the results between PRA and DEA model. The difference of evaluation indices is up to 68% in maximum. Because of this, the deployment priority of ITS subsystems are changed in each mode1. In results. ITS evaluation model using PRA considering the project risk with the probability distribution is superior to DEA. It makes proper decision making and the risk factors estimated by PRA model can be controlled by risk management program suggested in this paper. Further research not only to build the database of deployment data but also to develop the methodologies estimating the ITS effects with PRA model is needed to broaden the usage of PRA model for the evaluation of ITS projects.

Economic Feasibility of REDD Project for Preventing Deforestation in North Korea (북한 산림전용 방지수단으로서의 REDD 사업의 경제적 타당성 분석)

  • Jo, Jang Hwan;KOO, Ja Choon;Youn, Yeo Chang
    • Journal of Korean Society of Forest Science
    • /
    • v.100 no.4
    • /
    • pp.630-638
    • /
    • 2011
  • This study aims to verify the economic validity of the REDD project in North Korea by estimating the potential carbon credits and the cost of REDD project. The REDD potential credits of North Korea are estimated based on the international statistics of forest area and population from 1990 to 2010, and the cost of REDD project is estimated indirectly by annual land opportunity cost of agriculture assuming that South Korea will aid the food production per area in North Korea. When the 25% reduction scenario was applied to the annual deforestation rate in North Korea, the potential REDD credits were estimated to be $4,232million{\sim}5,290milliontCO_2eq.$ for 20 years. It would account for 28~35% of South Korea's national medium-term greenhouse gas reduction target. On the other hand, the break-even price of REDD project was calculated as the profit of agriculture in the land available by forest conversion in North Korea. It was estimated to be 19.19$/$tCO_2eq.$ when the non-permanence risk of forest conserved through a REDD contract is assumed to be 20%. This price is higher than the price of REDD carbon credit 5$/$tCO_2eq.$ dealt in the 2010 voluntary carbon market, leading to no economic feasibility. However, REDD project provides co-benefits besides climate mitigation. As previous studies indicate, the break-even price is lower than 20$/$tCO_2eq.$, which is the social marginal cost of greenhouse gas emissions by loss of forest. Therefore REDD in North Korea can be justified against the social benefits. The economic feasibility of REDD project in North Korea can be largely influenced by the risk percentage. Thus, North Korean REDD project needs a strong guarantee and involvement by the government and people of North Korea to assure the project's economic feasibility.

정보시스템의 비용 평가 모형

  • 권영직
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.2 no.1
    • /
    • pp.177-201
    • /
    • 1997
  • In this paper, a model of cost evaluatino for computer software development is proposed . This model is designed to cope with various development environment since the development cost is directly dependent on the development environments. The model that satisfies the users request is turned out to be a function point model. For the future research , a model that contain new technique and new development environment and an imaginative model are desired . Also, in order to effective cost estimation a systematic research on structure of software development , establishment of standard development methodology, project management and technique are desired.

A Study on the Inhabitant's Satisfaction of Community Facilities Demonstration Project for Rural Elderly (농촌 고령자 공동시설지원 시범사업 주민만족도 조사 연구)

  • Kim, Jin-Hwan;Park, Chung-Shin;Song, Seo-Ho
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.17 no.4
    • /
    • pp.9-16
    • /
    • 2015
  • This study examined the current conditions of the community facilities constructed by demonstration project for rural elderly that were promoted for the last two years by the ministry of agriculture, food and rural affairs. The type of community facilities are community living home, community food service facility and small bath house. And it was accomplished satisfaction survey for analyzing the effects of demonstration project focused on inhabitants and users of community facilities constructed by demonstration project. The results are as follows. First, The satisfaction index of community facilities was evaluated high level in generally. Second, Inhabitants and users of facilities were presented high level satisfaction in humanity sector, especially. Third, It should be to establish maintenance and management plan such as supporting of linkage program and operation cost for secure the sustainability. Consequently, the implementation of community facilities demonstration project to improve the living conditions of rural elderly is entirely appropriate. The results of this study were considered to promoting demonstration project for improving quality of the facilities and securing effectiveness of the project.