The Concept of Construction Management Showing up the HwaSungSungYoukEuGye in Choson Dynasty (조선시대 화성성역의궤의 건설관리적 의미)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.167-171
    • /
    • 2008
  • HwaSungSungYouk was one of the construction project in viewpoint of today's construction management and various information how to build the HwaSung at the last of the eighteen century had been recored in HwaSungSungYoukEuGye. The purpose of this study is to analyse the HwaSungSungYoukEuGye' management technic in viewpoint of today's construction management. In the record, there are a lot of informtion relate to record management, time management, cost management, etc. and the concept of the managements can be applied to today's construction project effectively. The concept and detail of the HwaSungSungYouk's project management should be analysed more.

  • PDF

Preliminary study on the Review Project Viability to Rahmen Structure (라멘조 공법의 사업성 검토에 관한 기초연구)

  • Lee, Sung-Ho;Joo, Jin-Kyu;Lee, Goon-Jae;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.139-140
    • /
    • 2011
  • The government encourages adoption of Rahmen structure design to ensure efficient management of national resources. However, in comparison with bearing-wall structure, Rahmen structure requires higher unit construction cost and present challenges in terms of securing adequate floor area ratio and floor height. That is why project clients have been disinterested in adoption of Rahmen structure design. Therefore, we have attempted to find factors having influence on decline of project viability for Rahmen structure. This study will be utilized as a basic reference study for promotion of Green Frame design which is a composite PC structure already developed.

  • PDF

Outcome of a Pilot Project on Case Management Service for Medical Aid Clients (의료급여텔레케어사업 효과 - 일 시범지역을 대상으로 -)

  • Oh, Jin-Joo
    • Journal of Korean Public Health Nursing
    • /
    • v.24 no.1
    • /
    • pp.61-70
    • /
    • 2010
  • Purpose: This study analyzed outcomes of a Telecare case management service pilot project for Korean Medicaid Program Clients in Seoul. Outcome data for provided services and medical aid cost data were analyzed. Methods: Case management services were delivered by 10 medical aid managers. The period of the project was from July to December 2007. Results: The total number of the objects was 9714, representing 43.4% of the total medical aid clients in the area. The average number of consults was 2.58. Consults were most frequently via letter and telephone, with in- person visits being least common. Of the total, 213 cases were referred to community services, 87.8% were transacted successfully. The medical expenditure was less than that from January-June, 2007. Conclusion: Telecare service via mail or telephone allows contact with many clients in a short time which can enable the discover and monitoring of high risk clients. This can be accomplished at a cost savings to the Korean Medicaid Program.

A Study on the Cost Benefit Analysis Model of Vessel Traffic Services(I) (선박교통관리제도의 비용편익분석모델에 관한 연구(I))

  • 정재용;이형기;박진수
    • Journal of the Korean Institute of Navigation
    • /
    • v.25 no.1
    • /
    • pp.11-22
    • /
    • 2001
  • Nowadays, it is planning to establish a coastal VTS in Korean southern coastal waters in order to enhance the safety of vessel traffic and to protect the marine environment. But, it surely needs over ten billions Won to establish, operate and maintain the above mentioned coastal VTS. Therefore, this paper proposes the VTS cost-benefit analysis model to confirm the reasonability and decide the priority of the project. This model has three distinct processes. Fist, it is the identification in qualitative terms of the effects of a given proposal. Second, it quantify the specified effects in physical terms. Third, it is the evaluation of the total effects of project. The proposed model in this Paper will contribute to the confirmation and the priority of the project in future.

  • PDF

A Conceptual Framework of an Agent-Based Space-Use Prediction Simulation System

  • Cha, Seung Hyun;Kim, Tae Wan
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.4
    • /
    • pp.12-15
    • /
    • 2015
  • Size of building has a direct relationship with building cost, energy use and space maintenance cost. Therefore, minimizing building size during a project development is of paramount importance against such wastes. However, incautious reduction of building size may result in crowded space, and therefore harms the functionality despite the fact that building is supposed to satisfactorily support users' activity. A well-balanced design solution is, therefore, needed at an optimum level that minimizes building size in tandem with providing sufficient space to maintain functionality. For such design, architects and engineers need to be informed accurate and reliable space-use information. We present in this paper a conceptual framework of an agent-based space-use prediction simulation system that provides individual level space-use information over time in a building in consideration of project specific user information and activity schedules, space preference, ad beavioural rules. The information will accordingly assist architects and engineers to optimize space of the building as appropriate.

Contingency Estimation Method based on Stochastic Earned Value Management System (추계적 EVMS 기반 예비비 산정 방법론)

  • Gwak, Han-Seong;Choi, Byung-Youn;Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.72-73
    • /
    • 2018
  • The accuracy of contingency estimation plays an important role for dealing with the uncertainty of the financial success of construction project. Its' estimation may be used for various purposes such as schedule control, emergency resolve, and quality expense, etc. This paper presents a contingency estimation method which is schedule control specific. The method 1) implements stochastic EVMS, 2) detects a specific timing for schedule compression, 3) identifies an optimal strategy for shortening planned schedule, 4) finds a probability density function (PDF) of project cost overrun, and 5) estimates the optimal contingency cost based on the level of confidence. The method facilitates expeditious decisions involved in project budgeting. The validity of the method is confirmed by performing test case.

  • PDF

Performance Measurement Method for Efficient Value Engineering Study of Railroad Construction Project (철도건설사업의 효율적인 VE수행을 위한 성능측정기법)

  • Lim, Jong-Kwon;Park, Mi-Yun;Park, Heung-Min;Kim, Sung-Hun;Lee, Kwang-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.2242-2249
    • /
    • 2008
  • A severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient VE job plan for especially large scale railroad construction project is proposed in this study. This study developed a more objective performance evaluation system for value engineering study of mega projects and suggested a systematic process of performance quantitative analysis for value improvement. The proposed performance measurement method would be very useful for better communication and consensus between decision makers and VE team.

  • PDF

A Basic Study of Construction Procurement Management using Block Chain & Big Data Technology (블록체인과 빅데이터 기술을 이용한 건설 조달 관리 기초 연구)

  • Kim, Ki-Ho;Son, Seung-Hyun;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.127-128
    • /
    • 2019
  • The cost of procurement in construction projects varies depending on the type of project, but the proportion of the cost component is very large. Therefore, efficient procurement system operation affects the success of the project. However, difficulties arise in procurement management due to problems such as availability of data due to limited information, inaccurate scheduling and integration of costs. Therefore, the purpose of this study is to develop a procurement management system to help efficient communication decision by combining Big Data which can analyze a lot of information and Block Chain technology which can secure information and record reliability to satisfy the above requirements. The results of this study are used to develop a system to develop academically improved procurement management system and practically to develop a system to secure business competitiveness and to facilitate rapid communication among project participants.

  • PDF

A Study on Maintenance Bundle Alternatives of BTL Project for Educational Facilities Using Complete Linkage Algorithm (컴플리트 링키지 알고리즘을 이용한 교육시설물 BTL사업 유지관리번들 구성방안에 관한 연구)

  • Cho, Chang-Yeon;Son, Jae-Ho
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.15 no.3
    • /
    • pp.4-16
    • /
    • 2008
  • BTL(Build-Transfer-Lease) Project for Education Facilities is contracted as a package which consists of several education facilities and its maintenance period is 20 years. Thus, total cost variation largely depends on the accuracy of the maintenance cost forecasting in the early stage in the life cycle of the BTL Projects. This research develops a method using complete linkage algorithm and branch & bound algorithm to help in finding optimal bundling combination. The result of this research suggests more reasonable and effective forecasting method for the maintenance bundle in BTL projects.

Towards More Accurate Space-Use Prediction: A Conceptual Framework of an Agent-Based Space-Use Prediction Simulation System

  • Cha, Seung Hyun;Kim, Tae Wan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.349-352
    • /
    • 2015
  • Size of building has a direct relationship with building cost, energy use and space maintenance cost. Therefore, minimizing building size during a project development is of paramount importance against such wastes. However, incautious reduction of building size may result in crowded space, and therefore harms the functionality despite the fact that building is supposed to satisfactorily support users' activity. A well-balanced design solution is, therefore, needed at an optimum level that minimizes building size in tandem with providing sufficient space to maintain functionality. For such design, architects and engineers need to be informed accurate and reliable space-use information. We present in this paper a conceptual framework of an agent-based space-use prediction simulation system that provides individual level space-use information over time in a building in consideration of project specific user information and activity schedules, space preference, ad beavioural rules. The information will accordingly assist architects and engineers to optimize space of the building as appropriate.

  • PDF