• 제목/요약/키워드: Project cost

Search Result 2,467, Processing Time 0.033 seconds

A Study on the Reasonable Service Charges for Incheon North Port(berth 3) under the Private Investment Project

  • Park, Jin-Hee
    • Journal of Navigation and Port Research
    • /
    • v.28 no.7
    • /
    • pp.601-608
    • /
    • 2004
  • Recently, port development has been actively in progress through a private investment project. Incheon North Port functions as an auxiliary port for Incheon Port to solve its chronic demurral and freight congestion and to treat materials such as wood, iron material, feed materials. Service charges is one of important factors in the port choice to treat general goods. In general, service charges can be calculated by two methods such as cost accounting method and market price method. This study will review the characteristics of the Incheon North Port (berth 3), which is under the progress of the private investment project and estimate the reasonable service charges for general goods on the basis of market price. This will help a concessionaire to maximize the operation efficiency.

Standard Classifications and Project Numbering System for Integrated Construction Management of Modernized Korean Housing (Hanok) (신한옥 건설통합정보화를 위한 표준정보분류 및 사업번호체계)

  • Jung, Young-Soo;Kim, Woo-Joong;Ha, Ji-Won
    • Korean Journal of Computational Design and Engineering
    • /
    • v.17 no.4
    • /
    • pp.225-233
    • /
    • 2012
  • A comprehensive research effort in order to develop and disseminate modernized Korean housing (Hanok) has recently been initiated by Korean government. This large scale research project encompasses a wide spectrum of housing development including public policy, architectural plans, modules, construction materials and methods, prefabricated assemblies, automated production, construction management, and advanced information systems. For the purpose of integrating and automating the whole processes from an industry perspective, it is of great importance to develop a standard classification system and project numbering system (PNS) for the modernized Korean housing. This paper focuses on the standard classification systems and PNS for cost and schedule control. The distinct characteristics and managerial requirements were explored and embedded into the proposed classifications for modernized Hanok.

Management in the EPC Business for Overseas Power Plant Projects (해외 발전플랜트 EPC 사업의 리스크 분석 및 관리방안)

  • Park, Euiseung;Yoo, Hoseon;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.7 no.3
    • /
    • pp.48-64
    • /
    • 2011
  • In this work, risks in EPC project for overseas power plant projects are analyzed and risk management methods are suggested to reduce cost and to shorten time. 79% of risks occurred in the engineering phase for S project located in South-East Asia. The impact scales of risks on major project objectives which are cost, time, scope, and quality are analyzed as 3.5, 3.8, 2.7, and 3.7, respectively. The level of impact scales is very similar to each other except the impact scale of scope. The risk management methods suggested in this study have to be applied at the appropriate time to manage risks effectively. After that, risks are managed continuously by monitoring.

  • PDF

A six sigma Project for Reducing the Cost Copper Materials of the Cable Manufacturing Process (전선 제조공정의 동(銅) 재료비 개선을 위한 6시그마 프로젝트)

  • Bae, Young-Ju
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.1
    • /
    • pp.121-130
    • /
    • 2009
  • This paper considers a six sigma project for reducing the cost copper of the cable materials in a electric wire company. The project follows a disciplined process of five macro phases: define, measure, analyze, improve, and control (DMAIC). A process map is used to identify process input variables. Three key process input variables are selected by using an input variables are selected by using an input variable evaluation table: large cable, plating, and a twisted pair. DOE is utilized for finding the optimal process conditions of the three key process input variables. The implementing result of this six sigma project is enable for reducing of the 2.8% copper materials.

IMPROVING CONSTRUCTION PROJECT DELIVERY THROUGH AUTOMATION AND ROBOTICS

  • Jasper Mbachu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.237-241
    • /
    • 2009
  • Automation and robotic technology (ART) has been successfully applied in the manufacturing and allied industries to achieve on-time delivery of quality products at increasingly reduced costs. Meeting time, quality and cost targets still remains a big challenge in the global construction industry with prevalence of time and cost overruns. Application of ART in the construction industry could contribute to significant improvement in the efficient and effective delivery of projects to meet and exceed client expectations. However, the uptake of ART is still low in the construction industry. This study investigates the various ways in which ART could be applied to improve construction project delivery, potential areas of applications, and constraints to the uptake of the technology in the construction industry. Recommendations are made for improving the uptake of ART in the construction industry.

  • PDF

A CONCEPTUAL FRAMEWORK FOR CONCURRENT CONSTRUCTION PLANNING

  • Euysup Shim;Kenneth Reinschmidt
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.440-448
    • /
    • 2009
  • Concurrent construction (or overlapping) is an alternative project delivery process to reduce time-tomarket such that the owner can get higher profits; the increased profits due to shortened project duration would exceed the loss of profits from the increased cost, if any. For more effective concurrent construction, a new conceptual framework for concurrent construction planning is suggested. With multiple work methods available in each activity, the performance of overlapping between two activities in terms of cost is affected by the compatibility between work methods selected and the benefit to the project owner is determined by internal rate of return (RoR). The impact of the compatibility between work methods and the conceptual framework are explained by a hypothetical case study.

  • PDF

A Risk Performance Measurement System for the Construction Project

  • Seon Gyoo Kim;Jin Bong Kim;Moon Serk Young;Bong Cheol Jeon;Han Kim;Young Jeong Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1591-1598
    • /
    • 2009
  • Recently, the researches on the urban regeneration projects have been performed very actively. It is a part of the effort that solves some social and economical problems occurred by deteriorated buildings and degraded infrastructures through new urban regeneration projects or redevelopment projects. However, the urban regeneration projects show the characteristics that can not guarantee in the project performance because the projects have various and complex stakeholders related to these projects and are exposed to lots of risks due to its huge scale. This study proposed the risk performance index method to improve the efficiency of the overall performance measurement for a mega-project by extending from the traditional cost/schedule based performance measurement system. The risk performance index method proposed in this study has a similar system to the EVMS, and makes possible to perform a three dimensional integrated performance measurement in cost/schedule/risk through 18 different indexes that compose the risk performance index.

  • PDF

A Study on the Mixed Implementation Method of Management Disposition and Cost Settlement by Public Participation in Urban Renewal Type Redevelopment Projects (도시정비형 재개발사업에서 공공참여에 의한 관리처분 및 원가정산 혼용 시행방식에 관한 고찰)

  • Moon, Myung-Yeol;Jeon, Sang-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.254-255
    • /
    • 2021
  • The urban renewal type redevelopment project is a project to improve the urban environment for the recovery of urban functions and revitalization of commercial districts in commercial and industrial areas. Urban regeneration projects are not progressing smoothly. The urban renewal type is not so for landowners, who require a high level of professional knowledge and experience to carry out smooth projects. In addition, the core part of business conflicts can be seen as the problem of management and disposal methods. Therefore, as landowners, etc. become the actual subjects, the public will take charge of project execution, but all development gains and losses will be attributed to the owner of the land, etc.

  • PDF

Analysis of Economic Effects of the Land Utilization and Promotion Projects(In the Case of Sinseok Area, Dangjin Districts in Chungnam Province) (농지이용증진사업의 경제효과분석)

  • Park, Jae-Keun;Lim, Jae-Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.25 no.2
    • /
    • pp.293-309
    • /
    • 1998
  • This study is aimed at identifying the decision making criteria as B/C ratio, IRR and NPV based on the expected benefits and costs of the land utilization and promotion projects which have implemented to improve agricultural structure under WTO system. To carry out the objectives of the study, Sinseok project area located at Dangjin district, Chungnam province was selected. Sinseok project area has 306.2 ha of paddy area with 172 farm households. The project area will be operated by the 33 specialized farm households after completion of the project which will have 20 years of economic life. After completion of the project, farm size will be increased from 1.8ha to 9.3ha. Land intensity of the project area will be increased by 10%. Increase of land productivity and cost saving due to the labor saving technology as farm mechanization will be expected. According to the survey results, the annual amount of production cost savings per farm was estimated 3.884million won and increased total farm income was expected about 43.8million won per year. The total expexted project benefits was expected 174million won per year. The project costs to promote land utilization and structural change consisted of handling charges, and direct payment for land movility. The decision making criteria representing economic feasibility of the project such as B/C ratio, NPV and IRR were estimated 2.49, 483million won and 30% respectively when the cut-off rate was taken into account 10%. In conclusion, the land utilization and promotion project proppeled by the Korean Government under the agricultural land law is considered economically feasible from the view points of expected project benefits and costs. Accordingly the project have to be implemented more strongly under the G't financial support considering WTO and UR negociation which were aimed at achieving the free trade and improvement of international competitiveness of farm products.

  • PDF

Economic Valuation of the Creation Project of Snow Crab Spawning and Habitat Ground (대게 산란·서식장 조성사업의 경제성 평가: 울진·영덕군의 사례를 중심으로)

  • Kang, Seok-Kyu
    • The Journal of Fisheries Business Administration
    • /
    • v.51 no.4
    • /
    • pp.19-45
    • /
    • 2020
  • This study is to evaluate economic effect of the creation project of snow crab, Chionoecetes opilio, spawning and habitat ground in Uljin and Youngdeok county. The main results of this study are summarized as follows: first, 14,400 million won was invested in the creation project cost of Chionoecetes opilio spawning and habitat ground of Uljin and Youngdeok County from 2015 to 2020. Second, the creation project of Chionoecetes opilio spawning and habitat ground directly provides fishing benefits, festival benefits, research and development benefits and employment benefits. Third, on the basis of above benefits, the creation project of Chionoecetes opilio spawning and habitat ground has net present value of 29,900.53 million won, internal rate of return 16.9%, and benefit-cost of 2.91 under a 4.5% social discount rate. Also, the creation project creates 195 jobs. This indicates that the creation project of Chionoecetes opilio spawning and habitat ground not only contributes to the increase in the income of coastal fishery and fishing villages but also to the job making. The result of this study provides useful information to policy makers or project managers as it shows that the project to create spawning and habitat ground should be carried out in consideration of the resource and biological characteristics of individual fish and that economic assessment logic should also be developed based on this. Also, it proves that the project to create a snow crab spawning and habitat ground is a national and local infrastructure project that increases the actual fishing income in the region. At the same time, it maintains the reproducibility function of most fish species, along with enhancing the people's benefits such as fishing village tourism and marine product consumption. Moreover, it provides useful information on budgeting for the continuous development of snow crab spawning and habitat ground in the mid to long-term.