• 제목/요약/키워드: Project control

검색결과 1,823건 처리시간 0.03초

요르단연구로건설사업 문서관리시스템 구축 (Establishment of Document Control System for the Jordan Research and Training Reactor Project)

  • 박국남;고영철;우상익;오수열;이두정
    • 산업경영시스템학회지
    • /
    • 제34권4호
    • /
    • pp.49-56
    • /
    • 2011
  • The Project of Jordan Research and Training Reactor (JRTR) officially launched in Aug. 2010. JRTR is the first made-in-Korea nuclear system to be built abroad by year 2015, and Korea Atomic Energy Research Institute (KAERI) is responsible for the design of major systems including the reactor core. While the PDCS (Project Document Control System) being operated by EPC company controls all the documents of the whole Project, KAERI is supposed to have its own system for KAERI documents. Meeting such a need; KAERI has implemented a document control for the JRTR Project into already existing ANSIM (KAERI Advanced Nuclear Safety Information Management) system. The documents of JRTR project to be controlled are defined in the PPM (Project Procedures Manual), QAP (Quality Assurance Procedure) and PEP (Project Execution Program). The ANSIM consists of the document management holder, document container holder and organization management holder. The document management holder, which is the most important part of ANSIM-JRTR, consists of the DDA (Document Distribution for Agreement), IOC (Inter-office Correspondence), PM Memo. (Project Manager Memorandum) and cover sheets of design documents. Other materials such as meeting minutes, sub-department materials and design information materials are stored in an independent COP (Community of Practice). This established computerized document control system, ANSIM, could lessen a burden for project management team and enhance the productivity as well.

석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안 (A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project)

  • 조홍연;유호선
    • 플랜트 저널
    • /
    • 제7권4호
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

e-비즈니스 IT 프로젝트 관리의 정성적 접근 모형의 개발 (A Qualitative Approach to eIT Project Management)

  • 정기호
    • 한국IT서비스학회지
    • /
    • 제1권1호
    • /
    • pp.45-55
    • /
    • 2002
  • This paper suggests a new approach to IT project management based on a regular project meeting results to consider the recent project environment. The greater part of recent IT projects are related to e-business transformation. Transforming to e-business is a new problem very different from those they have been worked, in several point of views. Under e-business era, therefore any IT project is being implemented in more complex, dynamic and uncertain environment than traditional. That is, project leaders must consider more factors to control projects including resources, quality, risks, and technologies, and human resources. The project organizations and software corporations thus need to develop and establish new concepts or methodologies to manage e-business projects. In this point of view, an entropy model in this study is introduced for estimating and managing the uncertainty in project control using multi-attributes of project meeting. This paper proposes a new frame work based on entropy model using project meeting results to consider eIT project environment with a small pilot study.

AUTOMATED PROJECT CONTROL SYSTEM FOR STEEL PROJECTS

  • Reza Azimi;SangHyun Lee;Simaan M. AbouRizk
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.479-486
    • /
    • 2009
  • This paper presents an integrated real-time monitoring and control framework that facilitates decision making by enabling project managers to take corrective actions right after any deviation happens and mitigate the damage to the ongoing steel projects. The proposed framework employs the High Level Architecture (HLA) as its infrastructure. It is composed of several individual monitoring and control components called "Federates," which cooperate and interact with each other through the Real-time Infrastructure (RTI). Reusability, interoperability and extendibility of federates in the proposed project control system make this a unique system.

  • PDF

건설공사 진도관리의 현황 분석에 대한 연구 (Analysis of Construction Schedule Progress Management Practice)

  • 신윤경;윤석현;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.207-211
    • /
    • 2010
  • As mega-sized and complex building construction projects are increased, the importance of project scheduling and control is emphasized. Project scheduling and control technic is not used widely yet in Korea, but interests in it is progressively increased. By now, most research projects mainly have focused on scheduling issues. Project progress management is also as much important as project scheduling issues. Current state about project progress management in Korea is analysed and way for improvements are suggested in this paper. At first, research projects undergone and practice are analysed and fields experts are survey about current state about project progress management. This study suggests the progress management method for quantitative and qualitative project progress analysis.

  • PDF

다각 보행 로보트의 서보 제어기 설계 (A servo controller design for a quadruped walking robot)

  • 이연정;여인택;박찬웅
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1987년도 한국자동제어학술회의논문집; 한국과학기술대학, 충남; 16-17 Oct. 1987
    • /
    • pp.75-78
    • /
    • 1987
  • This paper presents a control algorithm of servo controller for a quadruped walking robot as well as its characteristics and requirements. The control algorithm for propelling and terrain adaptive motion is described. The servo controller is being developed as a sub-project of the national project - "Development of a quadruped walking robot ". And then, this paper focuses on an overview of the current state and future works of this sub-project.b-project.

  • PDF

제품개발 프로젝트관리 프로세스 개발 (Development of Project Management Process for Product Development)

  • 민택기
    • 산업경영시스템학회지
    • /
    • 제33권3호
    • /
    • pp.93-101
    • /
    • 2010
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to product development projects and introduces the application cases. This product development project management process model is composed of five top processes of initiation and preparation, planning, implementation management, control, and termination and transfer. The five processes are re-divided into 18 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. This model is applied to the new car development project of a Korean automobile company and introduces the cases, which shows a project charter, a work breakdown structure, a project schedule, a progress s-curve, a risk register, and a performance report.

디자인 프로젝트 관리 시스템(DPMS)의 구성 (Construction for the Design Project Management System(DPMS))

  • 우흥룡
    • 디자인학연구
    • /
    • 제12권3호
    • /
    • pp.227-234
    • /
    • 1999
  • 본 논문은 디자인 프로젝트 관리의 리엔지니어링으로서 프로젝트의 기획, 조직, 일정, 그리고 제어하는 통합적인 어플리케이션 소프트웨어 개발의 기초모델을 설정하고, 이를 토대로 프로젝트 관리 시스템의 연구/개발을 목표로 삼고 있다. 프로젝트의 성과, 소요기간, 소요예산, 그리고 소요자원 등을 관리하는 과정이 프로젝트 매니지먼트 기술의 근간을 이루는 것으로, 디자인 프로젝트 상의 수많은 정보를 적시에 효율적으로 처리함으로써 프로젝트를 성공으로 이끌 수 있게 된다. 한편, 디자인프로젝트의 관리를 집단의사결정에 의해 처리함으로써 신뢰도와 합리성의 제고는 물론, 이를 통한 사기앙양이 기대된다. 따라서, 여기에서 야기되는 의사집합의 곤란, 시간손실, 구성원의 갈등 등의 프로젝트 관리에서 비롯되는 부수적인 문제도 전자의 기본적인 관리요소와 함께 통합하여 디자인 프로젝트 관리 시스템(DPMS)을 연구/개발하였다. DPMS 시스템은 디자인 프로젝트의 선정과 디자인 프로젝트의 기획/실행관리/ 평가로 주요 모듈을 설정함으로써 프로젝트 매니저는 해당 프로젝트 과업(Task)과 활동(Activity)에 대한 팀의 운용을 융통성 있게 관리할 수 있게 된다. 이와 더불어 프로젝트 관리를 On-Line DBMS 시스템 환경 상에 운용되도록 하여 정보의 재생산성, 운용의 동시성, 그리고 보안성 등을 도모하였다.

  • PDF

기존댐 치수능력 증대사업의 시행 방안 (A Plan on the Flood Control Ability Improvement Project to maintain stability of existing dams)

  • 이완호;안희복
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 추계 학술발표회
    • /
    • pp.191-201
    • /
    • 2006
  • The flood control ability improvement project on existing dams is the project for prevention of disasters from excessive flood due to climate changes and thus protects lives and property damages by increasing safety of dams. The collapse of dam brings unimaginable disasters, so the project needs to be swiftly conducted by Government's funding. This paper introduces tile examples of the flood control ability improvement projects of multi-purpose and water supply dams, which is conducted in the way of structural measures among 26 dams operated by Kwater.

  • PDF

공공민간협력사업을 통한 한 민간병원의 결핵치료 성공률 향상 (Increasing the Treatment Success Rate of Tuberculosis in a Private Hospital through Public-Private Mix (PPM) Project)

  • 박재석
    • Tuberculosis and Respiratory Diseases
    • /
    • 제70권2호
    • /
    • pp.143-149
    • /
    • 2011
  • Background: Stopping medical treatment by tuberculosis (TB) patients prior to completing treatment period is a major concern in private hospitals. We evaluated the impact of public-private mix (PPM) project on increasing treatment success rate of TB in a private tertiary hospital in Korea. Methods: Starting in February 2009, TB patients treated at Dankook University Hospital received health education and case monitoring activities by specially trained public health nurses (PPM project). On a retrospective basis, we reviewed medical records and compared the treatment outcome of TB patients treated under the PPM project (PPM group) to patients treated without the PPM project (control group) between January 2008 and June 2010. In addition, we also evaluated the risk factors treatment non-completion. Results: The number of patients in the PPM group and control group were 123 (85 pulmonary TB and 38 extrapulmonary TB) and 146 (101 pulmonary TB and 45 extra-pulmonary TB), respectively. The PPM group had demographic and clinical findings comparable to those of control group. The PPM group showed a significantly higher treatment success rate (93.5%) compared to the control group (77.9%). However, development of complications, proximity to the hospital, and presence of co-morbid disease did not influence the treatment success rate. Conclusion: The PPM project was effective at increasing the TB treatment success rate. An effort to improve and to expand the PPM project is needed in private Korean hospitals.