• Title/Summary/Keyword: Project System

Search Result 6,679, Processing Time 0.029 seconds

The Development of the Web-Based Project Learning System Focusing on the Learner (학습자 중심의 웹 기반 프로젝트 학습 시스템 개발)

  • Lm, Byung-Min;Kim, Hyun-Bae
    • Journal of The Korean Association of Information Education
    • /
    • v.6 no.2
    • /
    • pp.131-140
    • /
    • 2002
  • In this study, we will explain the concept of an organized and collective web based project learning system and suggest a basic structure concentrating on the learners. The web-based project learning system enables learners to use the diverse information on the internet any where, any time. Also the project system aims to go beyond classroom education and achieve learner-focused education with a project based on the students' tastes.

  • PDF

The HPRF system for PEFP 20MeV proton linac

  • Seol, K.T.;Kwon, H.J.;Song, Y.G.;Park, M.Y.;Cho, Y.S.
    • Proceedings of the Korean Nuclear Society Conference
    • /
    • 2004.10a
    • /
    • pp.683-684
    • /
    • 2004
  • The RF system for PEFP 20MeV proton linear accelerator is described. The RF system for 3MeV RFQ was already installed and operated to drive the RFQ. The klystron was tested up to 600kW itself and operated up to 350kW routinely. The HPRF dummy load was stabilized with the change of the coolant. Preparation of 20MeV DTL HPRF test has been completed. LCP and PLC system for klystron power supply was already prepared. Voltage fluctuation was measured during klystron test. Voltage control feedback loop seems to be re-adjusted.

  • PDF

Development of standard logic network for PWR NSSS System design (경수로계통설계 표준 Logic Network의 개발)

  • 박준원;이병령;이판권;이해준;송태길;김동희;최현호
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1993.10a
    • /
    • pp.212-226
    • /
    • 1993
  • The self-reliance of NSSS System Design is required not only the design capability to perform the system design but also the management capability to control the resource and time for the Project effectively. The purpose of this study is to develop the simplified standard Logic Network that is scheduled on the time and resource using the PERT/CPM method. That is mainly focused on Ulchin 3&4 Project. We prepare the management tool of NSSS System Design project. And we can utilize it as a reference tool for the similar project which are complex and long term in a next project.

  • PDF

Multidimensional Performance Assessment Support System for Collaborative Project Course (협동프로젝트 교과과정을 위한 다차원 수행평가지원 시스템)

  • Kim, Ji-Hye;Cho, Jung-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.12
    • /
    • pp.3645-3652
    • /
    • 2009
  • Most important factor for successful operation of collaborative project, which is a project based curriculum, is systematic and rational assesment. In this paper, we design and implement multidimensional performance assessment support system which can overcome simplicity of result-oriented evaluation. In the proposed system, learner can diagnose problems and improve those by oneself. We design the system satisfying both professor and student about evaluation results through evaluating total course of collaborative project.

Fuzzy Project Scheduling of the R&D System under the Mechatronics Environment (메카트로닉스 환경하의 R&D System의 퍼지프로젝트 일정계획)

  • 이근희;이재성;주일권
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.14 no.24
    • /
    • pp.169-177
    • /
    • 1991
  • The Existing Protect schedulings are mathematical nodes upon which probability control is based. In fact, under the mechatronics environment in the new product design and development, statistical information is very poor or sometimes non-existent. Probabilistic PERT/CPM methods are not always satisfying because those methods suppose that it is possible to apply central- limit theorem and there exists a critical path which is much mart critical than all the other paths. Fuzzy project scheduling is possibility based scheduling. For this reason, the Fuzzy Project Scheduling essential to design, development and control the new product under the mechatranics environment. This paper deals with a modeling on the project scheduling which use fuzzy set theory. Fuzzy concepts in the project scheduling are shown to be very useful and easy to work with in the R & D system.

  • PDF

C-PLM: Design and Implementation of a PLM System for Effective Management of Civil Projects (C-PLM: 토목 프로젝트 관리를 위한 PLM 시스템 설계 및 구축)

  • Kang, Hyoung-Seok;Lee, Sang-Seok;Noh, Sang-Do;Lee, Kwang-Myoung
    • Korean Journal of Computational Design and Engineering
    • /
    • v.15 no.2
    • /
    • pp.124-135
    • /
    • 2010
  • PLM(Product Lifecycle Management) is one of innovative manufacturing paradigms which leverages e-business technologies to allow a company's product content to be developed and integrated with all company business process through the extended enterprise. In these days, most construction companies also make an effort to enhance their systems for creating, sharing and managing information to improve business efficiency through entire lifecycle of project execution. Because of different needs, business process and diverse engineering activities such as design, structural analysis, installing simulation, documents and data managements, a new paradigm for construction companies is needed to manage and share the entire workflow, and information in total project lifecycle. In this paper, we conducted user requirement and business process analysis of constructions to design C-PLM system which is a PLM system for effective management of civil project and engineering activities. Also, we implement C-PLM system based on commercial PDM system, and applied it to civil project as case studies.

A Construction of Database System for Automation of Project Quantity Survey (공사물량 산출의 자동화를 위한 데이터베이스시스템 구성)

  • Lee, Min-Nam;Lee, Sang-Burm
    • The Transactions of the Korea Information Processing Society
    • /
    • v.2 no.2
    • /
    • pp.137-147
    • /
    • 1995
  • In the construction project, the design and the construction have been divided strictly. Because the design files of CAD library cannot be used directly in project quantity survey, we depend on manual handling.. It's because there has no interface between the system of the design and that of the construction. In this paper, by using the sizes and quantites of project design, we construct database model for automation of project quantity survey, and analyze the interface among the structure design files stored in design library of CAD system and the information of quantity survey, build a system which can survey the project quantity efficiently and evalulate the performance of this system.

  • PDF

A STUDY ON CONSTRUCTION SCHEDULE OPTIMIZATION INTEGRATING WITH CASH-FLOW

  • Hyung-Guk Lee;Dong-Pil Shin;Sung-Hoon An;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.141-144
    • /
    • 2013
  • This paper presents a system called a Cash-flow based Construction Schedule Optimization system(CfSO). The existing CPM effectively handles schedule and cost management. However, funding strategy should be considered to obtain maximum profit and to progress a project favorably. One of measures is to coordinate the contract terms between owner and subcontractors (or suppliers). Contractor may decrease the interest cost attributed to project financing by adjusting the timing of cash-inflows and cash-outflows. It is an excellent method maximizing profits. This paper presents a method to estimate the amount of a cash-flow occurred periodically by integrating the terms of contract into scheduling. The proposed method is implemented as a system prototype in Microsoft Excel. This system provides a user an automated tool that identifies an optimal schedule that secures maximum profit by adjusting start and finish times of non-critical activities' free-floats without affecting on the project completion time. This system supports a project manager to establish an optimum project schedule and identifies profitable contractual conditions against to a construction owner.

  • PDF

Vacuum Test of Cavity with Liquid Nitrogen

  • Choi, Suk;Park, Gunn-Tae;Kim, Heetae
    • Applied Science and Convergence Technology
    • /
    • v.24 no.5
    • /
    • pp.132-135
    • /
    • 2015
  • Schematic of RAON vacuum system is introduced. Vacuum test for superconducting cavity with liquid nitrogen is performed. Schematic plan for RAON vacuum system is introduced and vacuum control system for superconducting cavity test is constructed. Vacuum pressure of cavity is shown as a function of pumping time. The temperature of cavity is shown as a function of cooling time. Outgassing species from cavity is also detected. Detailed experimental procedure is presented to test the cavity vacuum with liquid nitrogen.

A Basic Study on the Improvement of PC Project Management System Process (PC 공사 프로젝트 관리 시스템 프로세스 개선을 위한 기초연구)

  • Kim, Chang-Hun;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.95-96
    • /
    • 2023
  • The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.

  • PDF