Fuzzy Project Scheduling of the R&D System under the Mechatronics Environment

메카트로닉스 환경하의 R&D System의 퍼지프로젝트 일정계획

  • 이근희 (한양대학교 산업공학과) ;
  • 이재성 (대우전자㈜ 특산공장) ;
  • 주일권 (대우전자㈜ 생산기술연구소)
  • Published : 1991.11.01

Abstract

The Existing Protect schedulings are mathematical nodes upon which probability control is based. In fact, under the mechatronics environment in the new product design and development, statistical information is very poor or sometimes non-existent. Probabilistic PERT/CPM methods are not always satisfying because those methods suppose that it is possible to apply central- limit theorem and there exists a critical path which is much mart critical than all the other paths. Fuzzy project scheduling is possibility based scheduling. For this reason, the Fuzzy Project Scheduling essential to design, development and control the new product under the mechatranics environment. This paper deals with a modeling on the project scheduling which use fuzzy set theory. Fuzzy concepts in the project scheduling are shown to be very useful and easy to work with in the R & D system.

Keywords