• Title/Summary/Keyword: Project Size

Search Result 916, Processing Time 0.033 seconds

Tae-Baek Natural History Museum Project (태백 고생대 박물관 계획)

  • Lee, Moo-Sang
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2007.05a
    • /
    • pp.75-76
    • /
    • 2007
  • Recently with increasing interest in the natural science history education, a lot of natural science museums have been developed in various locations. This project is located in one of the biggest Paleozoic site, Taebak Kangwon-do. This kind museum has had important rolls in terms of education for student, destination for traveling and reservation of important holdover of the old ages. To do those kind of parts, this project has been designed with concepts and themes like; i. being organized with story telling structure with theme "secret of life and earth from Taebak" ii. combining experiences between outdoor experimental search for the real fossils and indoor educational interactions with real size model and moving films. iii. designing with strong identities of Paleozoic era. For the design identities the outer appearance was designed with motive of trilbites in an abstract way and inside was finished with exposed concrete and various size of moving films projected to walls and floor to emphasize real scale experience of the old ages.

  • PDF

Sample size estimation using nomogram in dental research (치의학 연구에서 노모그램을 이용한 표본수 계산)

  • Kim, Ki-Yeol
    • The Journal of the Korean dental association
    • /
    • v.54 no.8
    • /
    • pp.630-638
    • /
    • 2016
  • The appropriate sample size calculation in dental research is important to achieve the study purpose at the first step in study design. However, it cannot be easy to calculate sample size using standard formulas, because the several factors must be considered for calculation. This study introduced the graphic method for sample size calculation, which is called nomogram. The purpose of this study is to show the effectiveness of the nomogram using examples, expecting the researchers can easily use nomogram for sample size determination.

  • PDF

Optimal Effort Allocation in Software Development Phase (소프트웨어 개발 단계별 최적의 노력 할당)

  • 박재흥;노명옥;하석운
    • Journal of the Korea Computer Industry Society
    • /
    • v.3 no.3
    • /
    • pp.295-306
    • /
    • 2002
  • Successful project planning relies on a good estimation of the effort required to complete a project, together with the schedule options that may be available. Despite the extensive research done developing new and better models, existing software effort estimation models are present only the total effort and instantaneous effort function for the software life-cycle. Also, Putnam presents constant effort rate in each phase. However, the size of total effort are variable according to the software projects under the influence of its size, complexity and operational environment. As a result, the allocated effort in each phase also differ from project to project. This paper suggests the criteria for effort allocation in planning, specifying, building, testing and implementing phase followed by the project total effort. These criteria are derived from 183 different projects. This result can be considered as a practical guideline in management of project schedule and effort allocation.

  • PDF

Strategies for Acceleration of Damaged Area Restoration Project in the Development Restriction Zone

  • Park, Seong Yong;Jung, Sung Ae;Lee, Sang Jo;Chung, Jae Woo
    • Journal of People, Plants, and Environment
    • /
    • v.22 no.6
    • /
    • pp.641-651
    • /
    • 2019
  • The purpose of this study is to derive institutional improvement methods for promoting the Damaged Area Restoration Project in greenbelts. The current status of greenbelts in Gyeonggi-do, where greenbelts are extensively distributed was analyzed, and the relevant laws and regulations were reviewed to suggest measures to promote the restoration project. The area of damaged areas within greenbelts in Gyeonggi-do was 6,121,024 m2, accounting for about 0.52% of the total area of greenbelts, and more than 80% was found to be located in Namyangju (55.49%), Hanam (16.48%), and Siheung (8.68%). Various measures to improve the policy were examined as follows: reducing the minimum size of the restoration project area; adjusting baseline of recognizing range of damaged areas; introducing the right of claim for land sale; allowing long-term unexecuted urban parks to be replaced as alternative sites for parks and green spaces; simplifying administrative procedures; and allowing public participation. All of them are expected to promote the restoration project within greenbelts. In results, when the minimum size of area for the restoration project was reduced from 10,000 m2 into 5,000 m2, 3,000 m2 and 2,000 m2, the ratio of the number of combinable lots to the total number of lots increased from 4.4% to 18.8%, 38.8%, and 55.9% respectively in Namyangju. Morever, when the recognizable ranges of the restoration project were extended to the structures obtaining building permit as of March 30, 2016 and obtaining use approvals before December, 2017, the number of applicable lots increased by 5.1% and 9.2% respectively.

An Adaption on the Project-Specialist System for the Small and Medium If enterprises (중소기업의 기술혁신 지원을 위한 전문가(Project-Specialist)제도 도입 방안)

  • Kim Yoon-ho
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.8 no.7
    • /
    • pp.1565-1569
    • /
    • 2004
  • Small and Medium-size Enterprises's R & D Program progress is hard than the university, government R & D agency and big enterprises. this environment make heat competition among the small and medium-size enterprises and subsidies little budget for many enterprises. from the management agency of the Institute of Information Technology Assessment(IITA)'s most of the activities focusing to the enterprises management not R & D Program. so, this paper suggestion an adaption on the project specialist system for the small and mediumlTenterprises'stechnologyinnovation'.

An Empirical Study of SW Size Estimation by using Function Point (기능점수를 이용한 소프트웨어 규모추정 실증연구)

  • Kim, Seung Kwon;Lee, Jong Moo;Park, Ho In
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.7 no.2
    • /
    • pp.115-125
    • /
    • 2011
  • An accurate estimation of software development size is an important factor in calculating reasonable cost of project development and determining its success. In this study, we propose estimation models, using function point based on the functional correlation between software, with empirical data. Three models($FP_{est}(I)$, $FP_{est}(II)$, $FP_{est}(III)$) are developed with correlation and regression analysis. The validity of the models is evaluated by the significance test by comparing values of Mean Magnitude of Relative Error (MMRE) and predictions of each model at level n%. Model $FP_{est}(III)$ proved to be superior to other models such as IFPC(Indicative Function Point Count), EFPC(Estimated Function Point Count), EPFS(Early Prediction of Function Size), $FP_{est}(I)$, and $FP_{est}(II)$. As a result, the accuracy of the model appears to be very high to determine the usefulness of the model to finally overcome weakness of other estimation models. The model can be efficiently used to estimate project development size including software size or manpower allocation.

Market, Firm, and Project-level Effects on the Innovation Impact of FP RTD Projects

  • Vonortas, Nicholas S.
    • STI Policy Review
    • /
    • v.1 no.2
    • /
    • pp.69-88
    • /
    • 2010
  • This paper explores the determinants of the innovation impact of publicly funded R&D projects along three broad dimensions, namely project, firm and market-related factors. In addition to these factors we examine the attributes of the research result per se and aspects of the commercialization process. The observations from empirical and qualitative analyses are based on R&D projects funded by the Fifth and Sixth Research Framework Programmes of the European Union. Firm size, prior experience, innovation culture, the nature of the project itself, explicit intension to commercialize, consortium management and strategy are the factors with the strongest effect on project success, defined in terms of product/process innovation and/or technical knowledge creation. The paper provides important implications for the organization, objectives, and management of public programmes that fund R&D and for project and participant selection.

Project Performance Comparison Based on Different Types of Project Delivery System (사례연구 분석을 통한 발주방식별 성과비교)

  • Lee, Soo-Kyong;Jung, Young-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.207-209
    • /
    • 2011
  • Numerous reports show that alternative project delivery systems (PDSs) such as design-build (DB), construction management at risk (CMR), and design-build-maintain (DBM) are increasingly used in many countries. This study compared characteristics of each PDS (design-bid-build (DBB), DB, CMR, or DBM) by analyzing quantitative data from 9 research articles. In order to compare characteristics between DBB and alternative PDSs, the study is based on principal 3 factors - Time, Cost, and Quality. DB shows the best performance in the time part and also the cost performance depending on facility type and project size. The performance of quality has minor difference among different PDSs. These results support the fact that using an appropriate PDS by the characteristic of a project makes high value of efficiency and productivity.

  • PDF

Designing Study on Techno-Economic Assessment of Solar Photovoltaic Mini-Grid Project in Nepal

  • Poudel, Prasis;Bae, Sang-Hyun;Jang, Bongseog
    • Journal of Integrative Natural Science
    • /
    • v.15 no.2
    • /
    • pp.89-97
    • /
    • 2022
  • This paper presents the comprehensive feasibility study of solar mini-grid project located in Bajhang District, Sudur Paschim Province, Nepal. The study has been conducted with the aim of developing a suitable size solar mini-grid system to meet electricity demand of proposed settlements of the village people. The study forecasts that the estimated average daily peak power consumption of load is about 20kW and average daily energy demand of load is about 100-150kWh/day in the base year 2022. The shared ratio of productive end uses is about 25% of the total power consumption and about 27% of the total energy demand, which will be used for small business/income generation activities and required 45kWp size solar power generation mini-grid system. The estimated project cost for the proposed 45kW solar mini-grid system technology, including 3 years of operation & maintenance, as well as power distribution network up to end user's premises is about 0.24 million USD. It is concluded that 45kWp photovoltaic mini-grid is feasible for the location.

The Effects of the Project Managers' Competency and Leadership Style on the Performance and the Customer Satisfaction of SI Projects (SI 프로젝트에 있어서 프로젝트 관리자의 역량과 리더십 유형이 프로젝트 성과와 고객만족에 미치는 영향)

  • Kim, Eun-Hong;Kim, Wha-Young
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.31 no.4
    • /
    • pp.157-179
    • /
    • 2006
  • Recently, as business becomes more dependent on information technology for their operations, SI project managers are under increasing pressure to implement SI projects on time and within budget, and to satisfy customer requirements. For the success of SI projects and customer satisfaction, SI project managers should master the critical shills and knowledge requirements and consider the proper leadership style to lead the team members and to manage SI projects. The leadership style includes four categories, such as directive leadership, supportive leadership, participative leadership, and achievement-oriented leadership. This study has examined the project managers' competency and suggests the three competency factors, which are technical, human, and conceptual shills, for the success of SI projects and customer satisfaction. The study suggests that SI project managers should master the three critical skills and knowledge requirements, and consider the proper leadership style for the successful implementation of SI projects. Also SI project managers should consider contingency factors such as project size and duration and outcome variables such as protect performance and customer satisfaction so as to enhance the leadership effectiveness.