• Title/Summary/Keyword: Project Size

Search Result 917, Processing Time 0.026 seconds

Uncertainty analysis of ROSA/LSTF test by RELAP5 code and PKL counterpart test concerning PWR hot leg break LOCAs

  • Takeda, Takeshi;Ohtsu, Iwao
    • Nuclear Engineering and Technology
    • /
    • v.50 no.6
    • /
    • pp.829-841
    • /
    • 2018
  • An experiment was conducted for the OECD/NEA ROSA-2 Project using the large-scale test facility (LSTF), which simulated a 17% hot leg intermediate-break loss-of-coolant accident in a pressurized water reactor (PWR). In the LSTF test, core uncovery started simultaneously with liquid level drop in crossover leg downflow-side before loop seal clearing, and water remaining occurred on the upper core plate in the upper plenum. Results of the uncertainty analysis with RELAP5/MOD3.3 code clarified the influences of the combination of multiple uncertain parameters on peak cladding temperature within the defined uncertain ranges. For studying the scaling problems to extrapolate thermal-hydraulic phenomena observed in scaled-down facilities, an experiment was performed for the OECD/NEA PKL-3 Project with the Primarkreislaufe Versuchsanlage (PKL), as a counterpart to a previous LSTF test. The LSTF test simulated a PWR 1% hot leg small-break loss-of-coolant accident with steam generator secondary-side depressurization as an accident management measure and nitrogen gas inflow. Some discrepancies appeared between the LSTF and PKL test results for the primary pressure, the core collapsed liquid level, and the cladding surface temperature probably due to effects of differences between the LSTF and the PKL in configuration, geometry, and volumetric size.

Development of a model to forecast the external migration rate in development projects reflecting city characteristics

  • Kim, Ki-Bum;Park, Joon;Seo, Jee-Won;Yu, Young-Jun;Hyun, In-Hwan;Koo, Ja-Yong
    • Environmental Engineering Research
    • /
    • v.23 no.4
    • /
    • pp.406-419
    • /
    • 2018
  • In planning public service systems such as waterworks, the design population is very important factor. Owing to the limitations of the indirect method, two new models, which take into consideration urban characteristics, were developed to accurately predict external migration rate (EMR), which is an essential component in estimating reliably the design population. The root mean square error (RMSE) between the model values and observed values were 10.12 and 15.58 for the metropolitan cities and counties respectively and were lower compared to RMSE values of 27.31 and 28.79 obtained by the indirect method. Thus, the developed models provide a more accurate estimate of EMR than the indirect method. In addition, the major influencing factors for external migration in counties were development type, ageing index, number of businesses. On the other hand, the major influencing migration factors for cities were project scale, distance to city center, manufacturing size, population growth rate and residential environment. Future medium and long-term studies would be done to identify emerging trends to appropriately inform policy making.

A Study on the Competitiveness Evaluation of Korean, Chinese, and Japanese Construction Companies in Vietnam (베트남에 진출한 한국·중국·일본 건설기업의 경쟁력 평가 연구)

  • Park, Hwan-Pyo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.1
    • /
    • pp.61-69
    • /
    • 2021
  • The size of Vietnam's construction market has been on a steady rise recently, and foreign construction companies such as China and Japan have been expanding their presence. Therefore, this study examined the design capabilities, construction capabilities, and construction project management capabilities of Korean, Chinese, and Japanese construction companies operating in Vietnam and local construction companies operating in Vietnam. As a result, it was found that Japan, Korea, China, and Vietnam were competitive in order. In particular, Korea's competitiveness in high-rise buildings and plants has been shown to be highly competitive in Vietnam. Based on these results, the government proposed measures to strengthen the competitiveness of Korean construction companies in Vietnam.

A Project on Development of HMR using Local Foods to Increase Local Food Consumption (지역농산물 활용성 증대를 위한 간편식 개발 사업)

  • Kim, Yangsuk
    • Journal of the FoodService Safety
    • /
    • v.2 no.2
    • /
    • pp.78-83
    • /
    • 2021
  • According to the report of the Korea Agro-Fisheries and Food Trade Corporation (2019), the size of the HMR food market in 2019 exceeded 4 trillion won. On the other hand, the consumption of agricultural products continued to decrease. As reported by Woo (2020) who analyzed consumer panel survey data, when the 2010 agricultural product purchase index was 100, the crop purchase index in 2019 was 72 and the vegetable and special crop purchase index was 69. Therefore, the Rural Development Administration promoted the research projects to develop the technologies for producing stably raw materials of HMR and for optimizing local foods as HMR ingredients. Researches on the development of HMR using local agricultural products has been being promoted in Cheonan, Chungju, and Jeju in 2020. In the case of Jeju, it has been prepared and realized the B2B commercialization of Jeju agricultural products in connection with the convenience store ingredients supplier in the province. In the case of Cheonan, development of HMR foods like as Sundae, dumpling, sausage, and Tteokgalbi using willd chive, cherry tomatoes, shiitake mushroom, fortified perilla, and licopene fortified watermelon has been being promoted. Lastly, in the case of Chungju, a diverse HMR foods have been developed using beans, centella asatica, Japanese lady bell, apples and peaches such as blended juices, frozen boiled rice, and tofu kit. In the future, in connection with the regional specialized crop cultivation project promoted by the Rural Development Administration, we intend to support the convergence commercialization of R&D technology based on regional characteristics.

A Study on the Characteristics of the Small and Medium System Integration Companies in Performing IT Projects (중.소 SI업체의 IT프로젝트 수행 특성에 관한 연구)

  • Kim, Yong-Kyong
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.15 no.5
    • /
    • pp.273-286
    • /
    • 2010
  • The main purpose of this study was to demonstrate the most common characteristics of the small and medium system integration companies in performing IT projects. In this study, 388 auditing reports on the 194 IT projects which were carried out by the small and medium size manufacturers from 2006 to 2009 were employed and surveyed. This survey revealed that the schedule management was the most neglected item in the project management area, the test planning and action was the most neglected item in the development and coding area, and the manual preparation for users and operators was the most neglected item in the operation and maintenance area. Consequently these three most neglected items were considered as the most common characteristics of the small and medium system integration companies in performing IT projects.

prEN 1991-1-4:2021: the draft Second Generation Eurocode on wind actions on structures - A personal view

  • Francesco Ricciardelli
    • Wind and Structures
    • /
    • v.37 no.2
    • /
    • pp.79-94
    • /
    • 2023
  • This paper traces the drafting of the new EN 1991-1-4 Eurocode 1 - Actions on structures - Part 1-4: General actions - Wind actions within Mandate M/515 of the European Commission to CEN, for the evolution of structural Eurocodes towards their Second Generation. Work of the Project Team started in August 2017 and ended in April 2020, with delivery of a final draft for public enquiry. The revised document contains several modifications with respect to the existing 2005 version, and new sections were added, covering aspect not dealt with in the previous version. It has a renovated structure, with a main text limited in size and containing only fundamental material; all the remaining information, either normative or informative is arranged into thirteen annexes. Common to other Eurocode Parts, general requests from CEN were those of reducing the number of Nationally Determined Parameters and of enhancing the ease of use. More specific requests were those of (a) the drafting of a European design wind map, (b) improving wind models, (c) reviewing force and pressure coefficients, (d) reviewing the procedures for evaluation of the dynamic response, as well as (e) making editorial improvements aimed at a more user friendly document. The author had the privilege to serve as Project Team member for the drafting of the new document, and this paper brings his personal view concerning some general aspects of wind code writing, and some more specific aspects about the particular document.

Cost Estimation and Validation based on Natural Language Requirement Specifications

  • So Young Moon;R. Young Chul Kim
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.15 no.2
    • /
    • pp.218-226
    • /
    • 2023
  • In Korea, we still use function point based cost estimations for software size and cost of a project. The current problem is that we make difficultly calculating function points with requirements and also have less accurate. That is, it is difficult for non-experts to analyze requirements and calculate function point values with them, and even experts often derive different function points. In addition, all stakeholders strongly make the validity and accuracy of the function point values of the project before /after the development is completed. There are methods for performing function point analysis using source code [1][2][3][4] and some researchers [5][6][7] attempt empirical verification of function points about the estimated cost. There is no research on automatic cost validation with source code after the final development is completed. In this paper, we propose automatically how to calculate Function Points based on natural language requirements before development and prove FP calculation based on the final source code after development. We expect validation by comparing the function scores calculated by forward engineering and reverse engineering methods.

Development of Non-Contact Construction Management Supporting System For Cost Reduction and Duration Reduction By Real-Time Data Sharing (건설공사에서 실시간 현장 정보 공유에 의한 원가절감, 공기단축을 위한 비대면 건설사업관리 솔루션 개발)

  • Kang, Sang-Chan;Kim, Min-Jin;Jang, Myunghoun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.323-324
    • /
    • 2021
  • This study is to develop a non-contact construction project management solution that can reduce cost and construction period through on-site information sharing, minimizing contact with others by COVID19, and improving the productivity of the construction industry. Decisions, checklists, and execution rates of construction costs can be checked with smart devices through sharing on-site photos and videos, exchanging opinions. Details and checklist data stored on cloud servers of sites that apply non-face-to-face construction project management solutions will be used as data for analyzing amounts and construction periods depending on the size of the construction. Real-time field information sharing will reduce expected problems and waste factors, expand communication channels with users to prevent or minimize construction disputes and claims, and contribute to the expansion and growth of new research industry markets in construction technology.

  • PDF

Analysis and Survey on Occupational Safety and Health Management Expenses in the Construction Industry (건설업 산업안전보건관리비 사용 실태조사 및 분석)

  • Sung-Yun Kang;Oh-Se Wook;Kim-Chang Won;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.2
    • /
    • pp.113-120
    • /
    • 2023
  • Occupational safety and health management expenses in the construction industry are statutory and separately included in the cost statement to prevent occupational accidents and health problems. The expenses are determined by multiplying the standard amount by the rate decided according to construction types and scales. However, the current expense appropriation method does not properly reflect the recent changes in the construction industry such as industry size, industry diversification, and social atmosphere about safety reinforcement. This study surveyed 1579 questionnaires in total and analyzed expense execution rate and proportion of each expense category. The expense execution rate was relative higher in complex construction (e.g., heavy construction = 126%, civil engineering = 125%) and long-period project (equal to or over 48 months construction = 133%) compared to general construction (98~116%) and short-period project (less than 48 months construction = 115%). The proportion of spending expenses was higher in the category of safety manager labor costs (25~52%), safety facility costs (22~40%), and personal protective equipment costs (10~25%). The analysis results of the study can be utilized in revising the standard expense appropriation method by reflecting the current usages of the occupational safety and health management expenses in the construction industry.

Prediction of Fragmentation Impact Range of Forest Development Analyzing the Pattern of Landscape Indexes (경관지수 패턴 분석을 이용한 산지개발사업의 산림파편화 영향범위 예측)

  • Ji, Seung-yong;Choi, Jaeyong;Lee, Sang-hyuk;Lee, Peter Sang-Hoon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.19 no.2
    • /
    • pp.109-119
    • /
    • 2016
  • In South Korea the need of sustainably managing development on forest lands has required to develop a new approach to estimating environmental impacts on forest surrounding development sites in a scientific manner. As for forest-related development, two types of development were selected: golf courses and industrial complexes. Using Fragstats 4.2, the fragmentation effects and patterns of each type by forest area within project sites and buffer zones ranging from the outside of project sites up to 2,000 meters were analyzed. As a result, golf courses were strongly related to a group of fragmentation indexes: CA, NP, PD, TE, LSI, TCA, NDCA and CONNECT, whereas industrial complexes were associated with CA, NP, PD, TE, LSI and CONNECT. Among them, NP, LSI, TCA and NDCA of golf courses were considered as representative indexes reflecting the average impact ranges of each sub-group by forest area, and focussing on the size of core areas. In the case of industrial complexes, PD, TE and LSI were the representatives, vulnerable to the composition of given landscape. For two case studies, one for golf courses and the other for industrial complexes, they showed there existed a difference between the average of a group and the individual results. Therefore, to minimize the variations in impact range within a group, it is needed to analyze more individual cases. This study proved there was a distinction between project types in terms of the range of environmental impact. To effectively and comprehensively manage forest development, further research on analyzing other development types related to forests with more cases is needed.