ANALYSIS OF THE INFLUENCE OF WEATHER ON CONSTRUCTION PRODUCTIVITY RATE FOR SUPER-HIGHRISE BUILDING CONSTRUCTION FRAMEWORK

  • Jae-won Shin;Han-kook Ryu;Moon-seo Park;Hyun-soo Lee
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1124-1128
    • /
    • 2005
  • The duration of a construction project is not only a key element for taking a new order, but also a strict yardstick to determine certain project successful or not. However, since construction project is basically outdoor job and most of the activities are proceeded out-air, no matter how the schedule plan has been established accurately, actual project proceeds due to the weather condition, beyond anyone's control. In this paper, the functional relationship between work productivity rate and weather elements is suggested by regression analysis. Difference of the relationship and influence of weather due to the seasonal group are also revealed. With these results, by simulating actual weather data and generating weather forecast through historical data, more accurate schedule would be obtained.

  • PDF

Cradle to Gate Emissions Modeling for Scheduling of Construction Projects

  • Sharma, Achintyamugdha;Deka, Priyanka;Jois, Goutam;Jois, Umesh;Tang, Pei
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.975-983
    • /
    • 2022
  • This paper presents an innovative way of integrating scheduling and project controls with the environmental impact of a construction project to track, monitor, and manage environmental emissions at the activity level. As a starting point, scheduling and project controls help monitor the status of a project to provide an assessment of the duration and sequence of activities. Additionally, project schedules can also reflect resource allocation and costs associated with various phases of a construction project. Owners, contractors and construction managers closely monitor tasks or activities on the critical path(s) and/or longest path(s) calculated through network based scheduling techniques. However, existing industry practices do not take into account environmental impact associated with each activity during the life cycle of a project. Although the environmental impact of a project may be tracked in various ways, that tracking is not tied to the project schedule and, as such, generally is not updated when schedules are revised. In this research, a Cradle to Gate approach is used to estimate environmental emissions associated with each activity of a sample project schedule. The research group has also investigated the potential determination of scenarios of lowest environmental emissions, just as project managers currently determine scenarios with lowest cost or time. This methodology can be scaled up for future work to develop a library of unit emissions associated with commonly used construction materials and equipment. This will be helpful for project owners, contractors, and construction managers to monitor, manage, and reduce the carbon footprint associated with various projects.

  • PDF

프로젝트 관리가 공동주택 건설의 하자 발생에 미치는 영향: 프로젝트 매니저 경험의 조절효과를 중심으로 (Investigating the Impact of Project Management on Construction Defects in Housing Projects: With a Focus on Project Manager Experience)

  • 이영준;김승철;오민정;최성용
    • 산업경영시스템학회지
    • /
    • 제46권3호
    • /
    • pp.209-220
    • /
    • 2023
  • Recently, defects that occurred during the construction of apartment houses have become a social issue. Defects in apartment houses lead to waste of resources and economic loss, causing psychological and physical damage to customers, and a decrease in reliability and financial loss to construction companies. The purpose of this study was to analyze the impact of defect occurrence according to the difference in project management level in the apartment housing construction stage, and to investigate the extent to which the project manager's experience affects the defect occurrence rate. For the empirical analysis of the study, statistical analysis was conducted using data collected from 130 actual projects. The results of the analysis showed that schedule management, cost management, and quality management had a positive effect on reducing the defect occurrence rate in the execution stage of apartment housing construction, while human resource management productivity had a negative effect. This study theoretically demonstrated the importance of project management, and in practice, showed that schedule management, cost management, and quality management should be faithfully performed in the execution stage to reduce the rate of defects after project completion. It was also suggested that hiring an experienced project manager would help reduce project defects.

BIM기반 추계학적 공기 예측 모듈 프로토 타입 개발에 관한 연구 (A Study on Proto-type Development of BIM based Stochastic Duration Estimation Module)

  • 박재현;윤석현;백준홍
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.159-162
    • /
    • 2009
  • Today's construction is more various and more complex. Because of that, a lot of uncertain factors are occurred and they related uncertain construction duration. For management complex architecture project, importance of construction schedule management also increased. In previous studies, one of solutions to overcome those problems is suggested. It was BIM based construction simulation process which focused on construction schedule and construction schedule management. But latest process had limited point which has no duration estimation function. So this paper suggested duration estimation method and developed duration estimation module. Duration estimation module developed with current scheduling tool MS Project and their macro function. However, this module has just developed Reinforced Concrete Structure and has to do more development and research.

  • PDF

Construction Delay Analysis Using Daily Work Report Data for Short Construction Seasons

  • Jamal, Md Shah;Abdelaty, Ahmed;Shrestha, K. Joseph
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.616-623
    • /
    • 2022
  • Some regions and states, such as Wyoming, have harsh weather conditions, forcing most transportation projects to be completed under tight schedules. However, construction projects are not only delayed by weather conditions, but also delayed by other factors such as contractor's competency, resource availability, coordination issues, and safety. Also, the construction method, geographical location of the projects, and inability to follow baseline schedules accurately due to the contractor's resource allocation are also reasons for the delay. This paper discusses the main reasons for the delay in the public transportation projects based on Daily Work Reports (DWRs) from five different transportation projects of the last three years in Wyoming. This paper focuses on the inconsistencies of the contractor's schedules to complete the project according to the baseline schedule. First, the authors collected DWRs and baseline schedules from the Wyoming Department of Transportation (WYDOT). Second, the DWR data are compared against the baseline schedules to determine the reasons for delaying their significance. Finally, the paper presents the recommendations to mitigate the effects of delays on public transportation projects as well as to improve the documentation process of DWR data.

  • PDF

Managing Mega-Project Complexity in Five Dimensions

  • Gransberg, Douglas D.;Jeong, H. David
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.6-9
    • /
    • 2015
  • Traditional project management theory is based on a three-dimensional life cycle approach where the project managerseeks to optimize the dimensions of cost-schedule-technical (quality or design). This paper reports the findings of a case study analysis of two complex mega-projects in Michigan which confirm the findings of previous research and illustrates the use of a framework for five-dimensional project management (5DPM) that is for conceptualizing a complex project's scope of work. The framework elevates the recognition that the project's social/political context and the financial arrangements create complexity adding two new dimensions. This paper also demonstrates a methodology to graphically display a project's complexity to better understand and prioritize the available resources. The result is a "complexity footprint" that may help a complex project manager identify the boundary between controllable and uncontrollable projects impacts. The paper finds that applying 5DPM to the two case study projects has given the project delivery team a tool which is actually adding value to the complex project management process.

  • PDF

중공업 일괄수주공사를 위한 프로젝트 관리 시스템 개발 사례 (Development of a Project Management System for the Turnkey-based Plant Project)

  • 고창성;노재정;현재명;김명관
    • 산업공학
    • /
    • 제11권3호
    • /
    • pp.167-180
    • /
    • 1998
  • This study is concerned with the development of a project management system for the turnkey-based plant project, which will help the site manager to plan, control, and report the project progress. This system has been developed as one of the modules of the integrated information system for the H Heavy Industry Co. and is composed of five subsystems; project information system, drawing-material management system, process management system, project progress report system. A/S management system. it also integrates commercial project management package in order to schedule the project activities and report the project progress to the owner. The main purpose of the system is to provide project information, including drawing, material, and progress, to the site manger in the real time and to accumulate site know-how for the turnkey-based plant project.

  • PDF

제품개발 프로젝트관리 프로세스 개발 (Development of Project Management Process for Product Development)

  • 민택기
    • 산업경영시스템학회지
    • /
    • 제33권3호
    • /
    • pp.93-101
    • /
    • 2010
  • Regarding project management, many organizations have developed and distributed general project management knowledge systems, and application fields use the knowledge systems to apply the process suitable for characteristics of a project. This study suggests project management process models to apply to product development projects and introduces the application cases. This product development project management process model is composed of five top processes of initiation and preparation, planning, implementation management, control, and termination and transfer. The five processes are re-divided into 18 bottom processes. These processes are expressed as input, control, output, and mechanism by using the IDEF0 model. This model is applied to the new car development project of a Korean automobile company and introduces the cases, which shows a project charter, a work breakdown structure, a project schedule, a progress s-curve, a risk register, and a performance report.

소프트웨어 개발을 위한 통합 프로젝트 관리의 개념적 모형에 관한 연구 (A Study on the Integrated Conceptual Model of Software Development Project Management System)

  • 문용은;이재범
    • Asia pacific journal of information systems
    • /
    • 제6권1호
    • /
    • pp.241-267
    • /
    • 1996
  • The problems like exceeding estimated cost, late due-date, expensive maintenance, insuffiency of experts and low productivity are becoming emphasized related with the software development. In order to overcome these problems and to develop the highly qualified software within the limited resources, a project management tool is used. The purpose of this study is to develop a conceptual model of the project management system which can plan, analyze and control the software development projects effectively. The model is constructed with plan and track management system, cost management system and operation management system for the efficient project management. It is named by LSD-PMS : Large-scale Software Development Project Management System. We reviewed 5 cases of project management. LSD-PMS is evaluated and reviewed by the project managers in the field. It is proved that LSD-PMS is a tool which can help project managers develop software successfully given budget and time schedule. In the future, this system should be further developed as an integrated model with system implementation tools such as CASE products.

  • PDF

Project Cost Management in Construction Industry in Ho Chi Minh City

  • Kim, Soo-Yong;Tuan, Kiet Nguyen;Luu, Van Truong;Le, Tam Thuong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.70-71
    • /
    • 2015
  • Cost management always being the matters for project manager as well as other entities involved the construction projects. Vietnam is emerging country, many construction works were carried out and lot of construction projects will be developed in the near future with a huge investment capital come from outside and inside Vietnam. In recent years, international project management firms enter the Vietnam construction market, some issues emerged need to be solved. In which cost and schedule of the construction project was put in a thoroughly consider of not only project management team but also stakeholders. The research attempts to identify and assess the relationship of factors affecting the construction cost in construction phase in Ho Chi Minh City, Vietnam. Five main factor groups Owners/clients; Consultants; Contractors; Resource and Other were identified to propose the solution for cost management.

  • PDF