• Title/Summary/Keyword: Project Planning

Search Result 2,085, Processing Time 0.025 seconds

Technical Management Planning Process of Engineering Project (개발 프로젝트의 기술관리 계획 프로세스)

  • Yoo, Il Sang;Park, Young Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.2
    • /
    • pp.63-68
    • /
    • 2005
  • This study developed the planning process for technical management of engineering project applying systems engineering process in order to correctly design technical management activities early during the system development projects. The developed process describes a systemic design process of a product to be developed as well as the development process and the personnel team of project organization. As an outcome of the process implemented by a Model-Based Systems Engineering(MBSE) software, a systems engineering management plan(SEMP) and a risk management plan can easily be produced.

  • PDF

An Activation Proposal for the Marginal Farmland Redevelopment Project in Korea (한계농지개발사업의 개발전망과 활성화 방안)

  • Han, Kyeng-Soo;Kim, Young-Joo;Choi, Soo-Myung
    • Journal of Korean Society of Rural Planning
    • /
    • v.12 no.4 s.33
    • /
    • pp.33-42
    • /
    • 2006
  • Recently, Korean government has been initiating various schemes for reactivation of the marginal farmland use. However, although about ten years have passed from the introduction of the marginal farmland redevelopment projects in 1995, there have been very few research works on their systematic and objective appraisal. Therefore, this study checked the statutory concept and development schemes of the marginal farmland, firstly. Ant through case studies on 5 completed project sites and questionnaire/interview surveys on local government officers/private developers, problems and suggestions on project implementation were analysed. Finally, in consideration with analysed results and suggestions together, tentative project directions and reaction schemes on marginal farmland development were proposed.

A STUDY ON DEVELOPING DECISION SUPPORT MODULES OF iPMIS(INTELLIGENT PROGRAM MANAGEMEN INFORMATION SYSTEM) FROM ONTOLOGICAL PERSPECTIVE

  • Jae-Bok Lim;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.717-724
    • /
    • 2009
  • Most recent programs in and out of the country are related to urban renewal projects. Contemporary project management information systems have been developed was to manage single or multiple projects focusing on their construction phase, and those have limitations to apply to large-scale complicated mega projects. So, this study explain the core concept of decision support modules for iPMIS (Intelligent Program Management Information System) and its major functions to support project owner and participants by introducing ontology in the web environment. This study confined the scope of research to the planning phase of urban environment improvement projects. Ontological logic structure and relation about planning works is essential parts and three functions to implement decision support module are developed.

  • PDF

Can you predict the production performance using the make-ready performance?: Cases on highway construction projects

  • Yong-Woo Kim;Jinwoo Jang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.914-919
    • /
    • 2009
  • The research investigates for the relationship between the operating performances of the make-ready process and project production performance. To this end, the researchers proposed a metric of PCR (Percentage of Constraint Removal) to measure the make-ready performance. The study measured the production performance in two ways: production planning reliability and progress performance. We hypothesized that how well the make-ready process is performed has an impact on the degree of production performance. The statistical analyses are used to investigate that how operating performance of the make-ready process affects project production performance. The results of the regression analysis support our hypotheses (p<0.25) and correlation coefficients for the relationship between project production performance and make-ready performance are also significant (p<0.05).

  • PDF

Dynamic Sustainability Assessment of Road Projects

  • Kaira, Sneha;Mohamed, Sherif;Rahman, Anisur
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.493-502
    • /
    • 2020
  • Traditionally, road projects are initiated based on an assessment of their economic benefit, after which the environmental, social and governance effects are addressed discretely for the project according to a set of predetermined alternatives. Sustainable road infrastructure planning is vital as issues like diminishing access to road construction supplies, water scarcity, Greenhouse Gas emissions, road-related fatalities and congestion pricing etc., have imposed severe economic, social, and environmental damages to the society. In the process of addressing these sustainability factors in the operational phase of the project, the dynamics of these factors are generally ignored. This paper argues that effective delivery of sustainable roads should consider such dynamics and highlights how different aspects of sustainability have the potential to affect project sustainability. The paper initially presents the different sustainability-assessment tools that have been developed to determine the sustainability performance of road projects and discuss the inability of these tools to model the interrelationships among sustainability-related factors. The paper then argues the need for a new assessment framework that facilitates modelling these dynamics at the macro-level (system level) and helping policymakers for sustainable infrastructure planning through evaluating regulatory policies.

  • PDF

A PROFIRABILITY MODEL BASED ON PRIMARY FACTOR ANALYSIS IN THE EARLY PHASE OF HOUSING REDEVELOPMENT PROJECTS

  • Kyeong-Hwan Ahn;U-Yeong Gim;Jong-Sik Lee;Won Kwon;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.497-501
    • /
    • 2013
  • An important decision-making element for the success of housing redevelopment projects is a prediction of the profitability of redevelopment. Risk factors influencing profitability were deduced through a review of the literature about profitability and a risk analysis developed by a survey of maintenance projects. In addition, a profitability prediction depending on the analysis of risk factors is necessary to judge the business feasibility of a project in the planning stages. A profitability prediction model of management and disposal method, which is calculated by proportional rate and which helps estimate contributions to profitability, is proposed to prevent difficulties in business development. The proposed model has the potential to prevent interruptions, reduce the length of projects, generate cost savings, and enable rational decision-making during the project period by allowing a judgment of profitability at the planning stage.

  • PDF

The Case Study on the Story Development to Jeju Batdam (제주밭담의 스토리 개발 연구)

  • Ra, Jeung-Im;Yang, Sung-Soo;Seo, Hyun-Jung
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.4
    • /
    • pp.195-201
    • /
    • 2016
  • The purpose of this study is to introduce the storytelling project for conservation and improvement of rural tourism. So, in this study, the current Jeju Batdam and storytelling planning are examined and the storytelling project presented in planning is also examined. And this study propose the storytelling implementation through the case study related in jeju. Its findings are as follws: 1) Storytelling exhibits principles of narrative structure(exposition, complication, climax and falling action) in various fact, and has shown tendency to structuralize a story. 2) It can be said that storytelling is deeply related with people's associations of their inner mind. 3) In order to convey a story in a more convincing way, storytelling a naming strategy based on a rhetorical technique, which has been shown to positively influence creating unique Jeju Batdam area.

WORKFORCE INFORMATION DATABASE AND RFID TECHNOLOGY TO TRACK AND MANAGE WORKFORCE INFORMATION

  • Yong-Woo Kim;Sang-Chul Kim;Chan-Jeong Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1094-1099
    • /
    • 2009
  • Workforce information is important in production planning because production planning requires matching a production unit's capacity to loads of assignments. However, tracking and managing workforce information such as skills and accident history is not an easy job. This paper describes a prototype database system for a workforce database system that employs RFID technology. This system tracks daily workforce production capacity on sites. A pilot project is described to explore the benefits and possibility of using radio-frequency identification (RFID) to track and manage workforce information, and is followed by the results of a survey to identify benefits. In addition to the survey identifying the benefits of the database system, the paper also presents a list of challenges through a series of interviews.

  • PDF

Automated Safety Planning of Scaffolding-Related Hazards in Building Information Modeling (BIM)

  • Kim, Kyungki;Cho, Yong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.255-258
    • /
    • 2015
  • Scaffolds are frequently used in construction projects. Despite the impact on the entire safety, scaffolds are rarely analyzed as part of the safety planning. While recent advances in BIM (Building Information Modeling) provides opportunity to address potential safety issues in the early planning stages, it is still labor-intensive and challenging to incorporate scaffolds into current manual jobsite safety analysis which is time-consuming and error-prone. Consequently, potential safety hazards related to scaffolds are identified and presented during the construction phase. The objective of this research is to integrate scaffolds into automated safety analysis using BIM. A safety checking system was created to simulate the movements of scaffolds along the paths of crews using the scaffolds. Algorithms in the system automatically identify safety hazards related to activities working on scaffolds. Then, the system was implemented in a commercially available BIM software program for case studies. The results show that the algorithms successfully identified safety hazards that were not noticed by project managers of the projects. The results were visualized in BIM to facilitate early safety communications.

  • PDF

The Analysis of The Project Characteristics on a Comprehensive Village Development - A Case of The Rural Public Spaces and Facilities - (거점면단위 마을종합개발사업 특성 사례분석 - 농촌 공공공간 및 시설을 중심으로 -)

  • Do, Jee-Yoon;Suh, Joo-Hwan
    • Journal of Korean Society of Rural Planning
    • /
    • v.22 no.3
    • /
    • pp.33-47
    • /
    • 2016
  • The purpose of this study is to understand the master plan of "The project on a comprehensive village development with a unit of a based township" through the master plan analysis and to help understand the implications of this project in order to maintain rural villages that can make local residents satisfied with them and promote the project of comprehensive rural village development as a successful way based on a comparative analysis through the in-site survey. The processes of this study are as follows. First, the analysis of development planning created a drawing based on linking business strategy by each region. The current situation and characteristics of planned public spaces were analyzed through the analysis of location and distribution of public spaces and facilities. Second, the situation analysis was performed by the task of shooting based on the basic plan information, and the master plan and status were confirmed through interviews. Also, the analysis of location and distribution of public spaces and facilities was conducted by a created drawings based on a survey. Finally, the detailed information of public spaces and facilities was compared with the investigation by in-site survey and analyzed through the Master Plan Strategy and a detailed classification of the types of facilities among each regional issues. In addition, by overlapping the planned drawings with the results, the results of formations were confirmed and the planned positional changes and the distribution of facilities were analyzed. As the results of "The project of comprehensive village development with a unit of based township", it was determined that there were many issues on cultural and welfare facilities in this project to meet the business objectives. Also, the facilities the residents needed, identified by interviews, were rural tourism facilities. According to the results, the residents cherished rural tourism facilities as much as basic living facilities. However, as the results of comparative analysis of public spaces and facilities, it was confirmed that mostly the plan was unfulfilled. Therefore, it is concluded that living, cultural and welfare facilities in the township can be maintained and expanded comprehensively as a purpose of "The project of comprehensive village development with a unit of based township" after not only planning process but also the project is fulfilled actually in rural areas.