• Title/Summary/Keyword: Project Planning

Search Result 2,073, Processing Time 0.037 seconds

Case-Based Reasoning Support for ERP Pre-Planning

  • Kwon, Suhn-Beom;Shin, Kyung-shik
    • Journal of Intelligence and Information Systems
    • /
    • v.9 no.2
    • /
    • pp.171-184
    • /
    • 2003
  • A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the most similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research would be extended to cover other stages of project planning.

  • PDF

Case-Based Reasoning Support for ERP Pre-Planning

  • Kwon, Suhn-Beom;Shin, Kyung-shik
    • Proceedings of the KAIS Fall Conference
    • /
    • 2003.11a
    • /
    • pp.171-177
    • /
    • 2003
  • A project planning is one of the most important processes that determines success and failure of the project. A pre-project planning is also essential job for information system implementations at the early stage of project planning, especially for management information system like ERP. However, pre-project planning is very difficult, because lots of factors and their relationships should be considered. Pre-project planning of ERP implementation has been done by project manager's own knowledge and experiences. In this article, we propose a system that help project manager to make a pre-project plan of ERP project with case-based reasoning(CBR) framework. The proposed CBR system saves previous cases of ERP pre-project planning in the case base. Then, the system finds the best similar case with the current pre-project planning problem. Project manager can make a pre-project plan by adjusting the most similar case. From the interview with project managers, we collect some field cases of ERP implementation. We organized these cases by using XML(Extensible Markup Language), which is good for representing hierarchical information. XML gives us some flexibilities to correct and maintain cases. We make a prototype system, PPSS(Project Planning Support System) that help project manager to make a pre-project plan of ERP implementations. The object of the system is to support project manager to make a pre-project plan of ERP. We hope the result of the study can be applied to other information systems. Our research should be extended to cover other stages of project planning.

  • PDF

THE RESEARCH ON CONCEPTUAL MODEL OF LNG PLANT PROJECT PLANNING EXPERT SYSTEM

  • Moon-Sun Park;Young-Ai Kim;Seung-Wook Lee;Sung-Ryul Bae;Hyun-Wook Kang;Byoung-Jun Min;Yong-Su Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1570-1575
    • /
    • 2009
  • The purpose of this research is to propose the conceptual model of Scenario-based Project Planning Expert System which has not been used in domestic LNG plant industry. This research examines data on the plant project planning expert system of domestic and oversea, analyzes the components of project planning expert systems and benchmark excellent cases. The conceptual model of LNG plant project planning expert system is established through the procedure as has been noted above. The results of this research are as follows: First, this research draws out such components of LNG plant project planning expert system as feasibility, cost control, contract management and risk management. Second, this research proposes the conceptual model of LNG plant project planning expert system which core module is consist of feasibility evaluation, life cycle cost evaluation and decision making. Finally, each module of LNG plant project planning expert system would be integrated into the Scenario-based Project Planning Expert System.

  • PDF

A Study on Affecting Factor-Construction of Collaborative Planning Process and Effect on Comprehensive Rural Village Development Project (농촌마을종합개발사업의 협력적 계획과정과 계획효과의 영향구조 분석)

  • Kim, Tae-Gu;Lee, Seong-Keun
    • Journal of Korean Society of Rural Planning
    • /
    • v.20 no.2
    • /
    • pp.23-43
    • /
    • 2014
  • This study aims to analyze the affecting factors-construction of collaborative planning process and effect on Comprehensive Rural Village Development Project. To this end, targeting the 36 districts which were selected for 2004 Comprehensive Rural Village Development Project and completed their 2010 5-year projects, components of collaborative planning process and planning effect will be drawn and the affecting factors-construction of collaborative planning and effect on Comprehensive Rural Village Development Project will be analyzed below. According to the results of this study, the affecting factors of collaborative planning process of Comprehensive Rural Village Development Project on planning effect, The level of effect of individual component on endogenous variable appeared greatest mostly in the upper groups. In terms of the level of individual component effect, social learning process and interaction among participants affected greatest. The process of Comprehensive Rural Village Development Project is evaluated that it reflected collaborative planning theory of Healey enough. Therefore, in the course of Comprehensive Rural Village Development Project progress, collaborative planning model must pass social learning process and interaction among participants which are the most important components out of collaborative planning process as we saw in the upper groups. And in order to maximize the performance and results of Comprehensive Rural Village Development Project, the following sequential affecting factors model as Figure 7 must be suggested as optimal collaborative planning models of Comprehensive Rural Village Development Project. Based on the results of the study, the policy implication was drawn as follows. First, systematic supplementations in the form of a consultative body are required to perform Comprehensive Rural Village Development Project efficiently. Second, network needs to be built among different participants in Comprehensive Rural Village Development Project process. Third, systematic mechanism is required to improve social learning among different participants. Fourth, systematic rearrangement is required to guarantee the residents' realistic participation in the course of Comprehensive Rural Village Development Project process.

BENCHMARKING THE PREPROJECT PLANNING PRACTICE FOR THE BUILDING CONSTRUCTION INDUSTRY IN TAIWAN

  • Yu-Ren Wang;Yi-Jao Chen;Chun-Yin Yu;Shin-Si Jang
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.324-329
    • /
    • 2011
  • Significant decisions are made by the project team during the early planning phase of capital facility project developments. The preproject planning phase begins after a decision is made to proceed with a project concept and continues until the detail design stage. Many of the industry practitioners and researchers have recognized the importance of preproject planning and that inadequate early planning is one of the key factors affecting project success. Nevertheless, the preproject planning practices vary significantly for the construction industry in Taiwan and the quality of preproject planning relies heavily on individual project team's experience. This research sets out to benchmark the preproject planning practice for the building construction industry in Taiwan. From late 2007 to early 2010, the researchers collected information from a total of 92 building construction projects using questionnaire survey. The analysis results show that the surveyed projects with better preproject planning have better cost and schedule performances on average. It is recommended that project team spend more efforts in the preproject planning stage to have a better chance of achieving project success.

  • PDF

A Study on Project Management Scheduling Module Development using the Rule and CBR (규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구)

  • Sin, Ho-Gyun;Kim, Yeong-Jun;Jeon, Seung-Ho
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

건설 프로젝트 공정표 생성을 위한 사례기반 전문가시스템의 설계

  • 김현우;이경전;이재규
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1996.04a
    • /
    • pp.709-712
    • /
    • 1996
  • Generating a project network of a specific construction project is very time consuming and difficult task in the field. To effectiviely automate and support the planning process, we design a case-based project planning expert system inspired by the fact a human expert project planner uses previous cases for planning a new project. A construction project case consist of its specific characteristics and the corresponding project network (i.e. project plan). Using frame based representation. we represent the project features affecting the progress network and the entities composing the project plan such as the buildings, construction methods, WBS (work breakdown structure), activities, and resources. The project planning process runs through most similar case retrieval, case adaptation, and user requirement satisfaction. We represent the construction domain knowledge for each procedure using constraints and rules. We develop the methodology for constraint-based case adaption. Case adaptation process mainly consist of activity generation/deletion and predecence constraint satisfaction, for which we develop the dynamic constraint generation method and connect user-level requirement representation the system-level network modification knowledge. The methodology is being applied to the prototype for apartment construction project planning.

  • PDF

A study on the development on project scope management module using rule and case-based reasoning (규칙과 사례기반추론 기법을 이용한 프로젝트 범위관리 모듈 개발에 관한 연구)

  • Shin, Ho-Kun;Jeon, Sung-Ho;Kim, Chang-Ho
    • The Journal of Information Technology
    • /
    • v.7 no.3
    • /
    • pp.127-137
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of a project. Scope management for a project planning is also essential job in system integration project. However project planning is very difficult because lots of factors and their relationships should be considered. Therefore project planning of system integration project has been done by project manager's own knowledge and experience. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study presents a methodology to cope with the limitations of the existing studies that have uniformly been customizing the methodology by only project complexity. We propose PPSM(Project planning support module) based on determination rules regarding route maps and document levels, and CBR(Case-Based Reasoning) for WBS identification.

  • PDF

Using Fuzzy Set Theory in Project Planning Problem

  • Park, Seung-Hun;Chang, In seong
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.20 no.1
    • /
    • pp.131-145
    • /
    • 1995
  • This paper presents a method for solving project planning problem which the opinions of experts greatly disagree in each activity processing time. Triangular fuzzy numbers (TFNs) are used to represent activity times of experts. And we introduce a pessimistic project planning with major TFNs and an optimistic project planning with minor. TFNs, and illustrate the approach using a combination of the existing composite and the comparison methods, which is used to solve the complex project planning problem.

  • PDF

Challenges and suggestions of resource planning for standardized concurrent construction

  • Chen, Xingbin;Li, Sining;Kim, Jung In;Fang, Yuan
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.41-49
    • /
    • 2020
  • Concurrent construction offers considerable improvement for shorten the project duration of its production process. Therefore, standardized concurrent construction is widely applied in building construction projects. However, resources planning for standardized concurrent construction project is manually developed by construction manager. This practice is not effective since it is time-consuming and error-prone for managers to identify all project-specific information, distinguish different activity-resource types, interpret these types and analyze how they affect resource allocated on an ad hoc basis. Therefore, this research investigates the opportunity for leveraging activity modeling to enable automated resource planning for standardized concurrent construction during project development, with identifying the characteristics of construction activities under standardized concurrent planning and determining the activity-resources types that affects resource planning. Both will function as a basis for modeling these construction activities in a computer-interpretable manner and for automation in resource planning.

  • PDF